Engineer-led

Home inspection, with an engineer’s eye.

Home inspection for York Region and GTA buyers, fitted to your condition period where we can, with structural observations from our P.Eng and a written report of findings, photos and priorities.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Two-storey red brick house with a gabled entry porch over a green front door and a single garage to one side
Inspected by
Our engineering team
Drawn & stamped
In-house, one P.Eng and BCIN team
Service area
GTA, within 90 minutes of Richmond Hill
First consultation
Free, by phone or on site
Fig. 01 · Two-storey red brick house with a gabled entry porch over a green front door and a single garage to one sideRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

The same team that designs structure, mechanical systems and permit drawings walks the house. That is what lets us say which wall carries load, whether the basement could be a legal unit, and whether the addition looks like it went through the city.

  • Stone-clad front entrance of a detached house

    Before you buy

    Pre-purchase inspections

    A walk through the house with an engineer’s eye before you waive conditions: foundation, framing, roof structure, mechanical systems and the signs of work done without a permit.

    • Foundation & structure
    • Roof & attic framing
    • Heating, plumbing & electrical overview
    • Signs of unpermitted work
  • Open stair inside a fully renovated home

    Before you plan

    Pre-renovation reviews

    What a renovation will actually involve: which walls carry load, where the ducts and drains can go, and whether the basement can become a legal unit.

    • Load-bearing wall identification
    • Basement ceiling height & egress check
    • Mechanical capacity review
    • The permit scope you can expect
  • Heritage brick house exterior

    When something looks wrong

    Structural assessments

    Cracks, sagging floors, bowing walls or a deck that moves: a P.Eng assessment of what is happening and what, if anything, needs to be done.

    • Crack & settlement assessment
    • Floor & beam deflection
    • Deck & porch structure
    • Written engineer’s report
  • Finished legal basement apartment in Vaughan

    Existing work

    Code compliance review

    A review of finished or in-progress work against the Ontario Building Code, for buyers, owners responding to a city order, or anyone who needs a professional opinion in writing.

    • Review of existing renovations
    • Second unit compliance check
    • Response to city orders
    • Engineer’s letters

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

06 common situations

What you get

06

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. On-site inspectionBy our engineering team
  2. Written reportPhotos, findings and priorities
  3. Structural notesFrom a P.Eng where the scope calls for it
  4. Permit notesFor the work you’re planning
  5. Follow-up callWe go through the findings with you
  6. Engineer’s letterFor a lender, an insurer or the city

How it runs

Process: 4 steps from first call to sign-off.

Four steps from booking to a report you can act on.

  1. Book & brief

    Tell us the address, the closing or condition date, and what worries you about the house. We fit pre-purchase inspections around your deadline where we can.

  2. On-site inspection

    We go through the structure, the attic and the basement, the mechanical room and the electrical panel, and note anything that looks like work done without a permit.

  3. Written report

    Findings, photos and priorities in plain language, with structural observations from our P.Eng where they apply and a note on what a renovation would need.

  4. Walk-through & next steps

    We go through the report with you on a call. If the answer is a repair, a permit or a design, the same team can carry on with it.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Address and your report deadline
  • The listing, drawings and seller disclosures
  • Your plans for the house
  • Concerns: cracks, water, finished basement, addition
  • Access arranged with seller or agent

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: home inspection questions, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • The visit you book sets the work before the house does. A pre-purchase walk-through ends in a report of findings and priorities, a structural assessment of one crack ends in a P.Eng’s reading of that crack, and a code compliance review or an engineer’s letter ends in a written opinion. A finished basement, an addition or a second unit adds to any of them. Tell us the address and what the report is for, and we say which visit fits.

  • Plan for two things, the visit on site and the written report that follows it. A larger or older house takes longer to walk, and assessing one particular crack is added on top. Give us your condition date when you book and we say whether both fit before it.

  • Yes, that is the pre-renovation review. It identifies which walls carry load, checks the basement’s ceiling height and egress, reviews the mechanical capacity and tells you the permit scope to expect. For a basement unit the height is measured first, because a secondary suite needs ceilings of not less than 1.95 m under the 2024 Building Code. Ask for it when you book.

  • Partly. The visit covers the panel and notes wiring that does not match the age of the house, but wiring inside the walls is outside a visual inspection, so it may not be seen. Aluminum wiring belongs to houses built between the mid-1960s and late 1970s, and some insurers will not provide or renew cover on it without an ESA inspection. Some may require knob and tube wiring to be replaced first, so ask your insurer before conditions come off.

  • The structural observations come from our P.Eng. Where a general inspection may only list a crack, a sagging floor or a bowing wall, our P.Eng reads what is happening behind it: whether a wall carries load, how far a floor or beam deflects, what a crack or settlement means, and what the framing would allow in a renovation. The report then says what, if anything, needs to be done.

  • You or your agent, with the seller, before the visit. The attic hatch, the basement and the electrical panel need to be reachable, so ask the seller to clear anything stored in front of them. Whatever stays out of reach limits what the visit can tell you, so settle access when you book.

  • A letter answers one specific question in writing, such as a structural item a lender or an insurer asked about, or a response to a city order. It is written around that question, so tell us who will read it when you book and we cover what they will look for.

  • Yes. Deck and porch structure is part of our structural assessments, so say when you book that you want it looked at. A deck that moves is a good reason to ask before you buy, and the same visit can cover the house itself.

Searched & answered

People Also Ask: what the GTA searches about home inspection.

Short answers to the home inspection questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Inspectors look for signs that the house is moving, taking on water or has been altered, judged from what is visible. That means the foundation, framing, roof structure and attic, basement, heating, plumbing and electrical, and finishes that could hide structure or unpermitted work. Concealed conditions fall outside a visual inspection.

  • A home inspection reports a house’s condition and structure for a buyer. Whether finished work meets the Ontario Building Code is a different question, and our code compliance review is the visit built to answer it.

  • It can flag signs, such as a bedroom with no egress window or framing that looks altered, judged from what is visible. Whether the work was permitted is a records question, so compare the seller’s drawings and permits with what was built.

  • Yes. Owners book a structural assessment for cracks, sagging floors, bowing walls or a deck that moves, a code compliance review of finished work, or a pre-renovation review before a big job.

  • Findings with photos and priorities in plain language, and permit notes on the work you are planning. Structural observations from our P.Eng appear where they apply. The report records what was visible, so concealed conditions fall outside it.

  • Often, yes. The opening needs a beam sized for the load above, posts under each end and a path that carries the load down to the foundation. The Building Code’s span tables cover some simple cases, but once the beam falls outside them, a licensed P.Eng has to design and stamp it. Fine Engineering prepares the engineering and the permit drawings together.

Good to know

Home inspection in York Region

A home inspection is an on-site, in-person look at a house’s condition and structure, not a pass or fail test. The visit reads what carries load, how the house is heated, plumbed and wired, and where work looks done without a permit.

It is a visual inspection of major elements and systems, so what sits behind finished walls is outside it. Where something looks wrong, such as a crack, a sagging floor or a bowing wall, the structural observations come from our P.Eng, and the report sets out findings with photos and priorities.

Pre-purchase inspection and your condition date

Book a pre-purchase inspection as soon as your offer has a condition date. The visit and the report both have to reach you before conditions come off, which is why the date is the first thing we ask for.

The seller’s drawings and permits show what was filed, and the visit shows what was built. Where a finished basement or an addition has no paperwork behind it, the walk-through spends its time on the framing and mechanical systems there.

Engineer home inspection: who may inspect

Ontario has no mandatory requirements for home inspectors, and the law does not require them to carry insurance. So ask each inspector you call, us included: who does the inspection, what qualification stands behind it and whether the work is insured.

Here an engineering team makes the visit, and the structural observations in the report come from our P.Eng, who is licensed by Professional Engineers Ontario and BCIN-qualified in Small Buildings, Structural and HVAC.

What a home inspection does not decide

It does not assess whether a house meets zoning or building codes, and it is no ruling on whether finished work was permitted. It can flag work that looks non-compliant, such as a basement bedroom without an egress window, but a flag is not a finding of compliance.

What a flag leads to depends on what it is. A permit question goes into the permit notes in the report, a structural one goes to our P.Eng, and a code question goes to a code compliance review.

Contact us

Look closer. Buy informed. Renovate with a plan.

Send the address and your condition date and we will say whether the visit fits, on a free first call.

First consultation free(416) 990-9179