Commercial Permits

Change of use permits that keep the business open.

Change of use permits and commercial permit drawings across York Region and the GTA, from a fit-out to a new building. Zoning and occupancy come before layout, and one P.Eng and BCIN team draws and files the set.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lot
Reviewed for
Zoning + Ontario Building Code
Drawn & stamped
In-house, one P.Eng and BCIN team
Service area
GTA, within 90 minutes of Richmond Hill
First consultation
Free, by phone or on site
Fig. 01 · Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lotRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Commercial work is judged on the code analysis before it is judged on the drawings. We classify the occupancy, confirm the zoning and work out the fire and exit requirements first, so the layout you commit to is one the city will approve.

  • Commercial office fit-out with glass partitions

    Fit-outs & new builds

    Commercial building permits

    Tenant fit-outs, alterations and new commercial construction, drawn to scale with the designer’s credentials and signature the Ontario Building Code requires on commercial plans.

    • Tenant fit-outs & alterations
    • New commercial construction
    • Interior & exterior alterations
    • BCIN & P.Eng credentials on every sheet
  • Restaurant interior after a change of use

    New occupancy

    Change of use

    Required whenever a building’s purpose changes, even with no construction: an office becoming a restaurant, a clinic becoming a supermarket, a residential unit becoming a shop.

    • Occupancy classification review
    • Fire separations & exits
    • Plumbing, HVAC & sprinkler upgrades
    • Zoning confirmation
  • Restaurant storefront on a commercial street

    Opening the doors

    Business licences

    The approvals a new business needs beyond the building permit, worked out before the lease is signed so nothing surprises you at opening.

    • Zoning & minor variances
    • Sign permits
    • Fire & health inspections
    • Liquor licence drawings
  • Fire safety inspection in a commercial unit

    Occupant safety

    Fire & life-safety upgrades

    Fire alarm, sprinkler, emergency lighting and exit-sign layouts, designed with the permit package so the fire department and the building department see one set.

    • Fire alarm layout
    • Sprinkler design
    • Emergency lighting & exit signs
    • Fire separation details

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Code analysisOccupancy, fire separations, exits, washrooms
  2. Floor plans & elevationsExisting, proposed and ceiling plans
  3. Structural drawingsOpenings, mezzanines, roof-top units
  4. Mechanical & electricalPlumbing too, drawn for the permit
  5. Fire & life safetyAlarm, sprinklers, emergency lighting
  6. Zoning reviewPlus variance drawings if needed
  7. Application & responsesEvery examiner comment answered

How it runs

Process: 4 steps from first call to sign-off.

Four steps, timed around your lease. We start with the code analysis so the layout you fall in love with is one the city will approve.

  1. Site visit & code analysis

    We measure the unit, confirm the zoning permits your use, and classify the occupancy under the Building Code. That tells us what the space needs before any layout is drawn.

  2. Layout & coordination

    Floor plan, exits, washrooms, kitchen and mechanical rooms are laid out together with your designer’s or franchisor’s standards, so the permit set and the fit-out drawings agree.

  3. Drawings & engineering

    Architectural, structural, mechanical and fire-safety sheets come from one office, stamped by our P.Eng and BCIN designers.

  4. Submission & approvals

    We file the building permit and support the sign permit, fire inspection and licence applications that follow, answering city comments at no extra charge.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Unit address and landlord base-building drawings
  • The space’s past use and what you plan
  • Your lease start date and any landlord deadlines
  • Franchise or brand design standards
  • Equipment lists for kitchens, clinics or workshops
  • Any city notices or orders on the unit

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: change of use questions, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • The package varies with what the new use does to the unit. Moving between occupancy types can trigger sprinklers, fire plans, plumbing, HVAC or structural changes, and each adds sheets from another discipline. Some scopes also need an architect or engineer to review and stamp, which adds a reviewer. A use that triggers none is a smaller set. The city’s permit fee is a separate charge. The code analysis at the site visit shows which of these your use triggers.

  • The Building Code sets a longer review period for a more complex class of building than for a house, so the class sets the city’s clock. A new use stretches it in other ways: a zoning variance has to be granted first, the fire review of the alarm, sprinkler and exit layouts comes before the permit issues, and the occupancy class found at the site visit decides which layouts the file carries. We never promise an issue date.

  • Yes. A unit taking on a new use is permitted and inspected as its own job, so a space with no renovation still goes through drawings, a permit and a final inspection. We confirm whether your use counts before you sign the lease. Our Kitchener dental office converted to a supermarket went through the same permit, with a new plumbing system and upgraded fire separations.

  • A tenant or building permit application typically asks for architectural, mechanical (HVAC, plumbing, sprinkler) and electrical drawings, plus structural drawings when the structure is modified. In Richmond Hill a tenant permit also includes a Letter of Use describing the nature of the operation or business. We draw the code analysis, plans and every discipline’s sheets in one office so they agree.

  • Not if the designer is registered only for houses. A registered designer may do design work only for the types of buildings that match the class of registration held. Ask for the BCIN class and look it up in the QuARTS public registry, which lists every registered practitioner and their qualifications.

  • No. The permit is a Building Code permit for the new occupancy, while rezoning and minor variances are zoning approvals. The building permit will not be issued until a needed zoning change or minor variance has been obtained, and a minor variance goes to the Committee of Adjustment first. Local by-laws can also restrict some business activities and require extras such as conditional-use permits.

  • Not if your use is a different occupancy type, because that needs its own tenant permit. At the site visit we classify the occupancy for your use and measure the unit’s exits, fire separations and washrooms as built against what the new use needs.

  • Send the unit address, the landlord’s base-building drawings, what the space was used for before, your lease start date and any landlord deadlines. If a franchisor sets design standards, send those with the equipment list for a kitchen, clinic or workshop: the use decides how much plumbing, HVAC and fire work the permit set carries.

Searched & answered

People Also Ask: what the GTA searches about commercial permits.

Short answers to the commercial permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Yes. The chief building official may revoke a permit when, six months after issue, the work has not seriously begun, or when work stops for more than a year. For a tenant that ties the contractor’s start to the lease date, so Fine Engineering times the filing to it.

  • No. A building permit covers construction and changes of use, and a business licence is the separate approval to operate. Which licence steps apply depends on the location and the operation, so Fine Engineering works out the list for an address before the lease is signed.

  • In Richmond Hill, a business putting up signage on its premises must obtain a sign permit and the property owner’s permission. The owner’s consent is separate from the permit, so ask the landlord about signage before the lease is signed.

  • Richmond Hill’s non-residential application includes a site plan with zoning statistics tied to a current survey, and a separate site services permit for exterior plumbing. Fine Engineering scopes a job that reaches the lot or the street with both from the start.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

Good to know

Change of use permits in York Region

Under Ontario’s Building Code Act, changing a building’s use in a way that raises the hazard, as the Building Code measures it, needs a permit even though no construction is proposed. Richmond Hill applies this to a tenant moving into a different occupancy type: the tenant permit is required even if no construction or alterations are anticipated.

Zoning is settled before the layout. Richmond Hill’s Permitted Use Letter confirms whether a proposed use complies with the property’s zoning, and its Compliance Letter does not verify the lawful use. Get the Permitted Use Letter before the lease is signed, so no design money goes into a use the by-law refuses.

Business licence: what the permit job gives it

A Richmond Hill business licence application needs supporting documents, among them an Occupancy Permit and/or a lease agreement and a Zoning Clearance Certificate. The Occupancy Permit comes out of the tenant permit job, so permit sign-off sets when the licence can be applied for.

Health approval, fire inspections and liquor licences are separate steps, and we line them up beside the tenant permit instead of after it. We also prepare liquor licence drawings.

Who signs which sheet of a commercial permit

Commercial plans must be to scale and detailed, and carry the designer’s credentials and signature under the Ontario Building Code. For certain scopes a qualified designer is not enough: an architect, a professional engineer or both must review and stamp the drawings. Our P.Eng seals the engineering.

Non-residential applications in Richmond Hill also need a Commitment to General Review, certifying that an architect, a professional engineer or both will review the project during construction. Those site review visits are part of the scope from the start, not an add-on after the permit.

Fire review before a commercial permit issues

Richmond Hill’s Fire Prevention Bureau checks that plans meet the fire protection standards in the Ontario Building Code and the Ontario Fire Code, so the alarm, sprinkler, emergency lighting and exit sign layouts are drawn with the permit set. The Fire Code sets minimum requirements for existing buildings, and the owner is responsible for complying with it unless it says otherwise.

Fire inspectors can issue an order to the owner or occupant, so a use that adds occupants or cooking is laid out to both codes at once.

Contact us

Lease signed. Layout drawn. Permit filed.

Tell us the address and the use, and we’ll tell you what the city will ask for, on a free first call.

First consultation free(416) 990-9179