Can a Committee of Adjustment decision in Richmond Hill be appealed?
Yes, but only by some parties. Since November 28, 2022, the Planning Act has limited appeals to the applicant, the Minister, specified persons and public bodies. Neighbours can still object at the hearing, so the drawings filed with the application are what both sides respond to.
In Richmond Hill, what does lot grading involve?
Shaping the ground around a house so rain and snowmelt run away from its walls and leave the property without harming the neighbours. Ontario's Building Code applies that test to every lot, and the grading plan shows how it is met.
What does a Richmond Hill drainage plan show?
Existing and proposed elevations, arrows for the direction water flows, the swales that carry it, and where it leaves the lot: the street, a catch basin or a storm connection. It includes runoff calculations where the City asks for them.
What is the difference between a building permit and zoning approval?
Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.
What is a minor variance?
Permission from the municipality’s Committee of Adjustment to depart slightly from the zoning by-law, for example a smaller side yard or a little more lot coverage, without rezoning the property. The Committee has to be satisfied that the change is minor and meets the other tests the law sets, and a bigger change needs a rezoning instead. Fine Engineering draws the plans and handles the application.
Can one lot have a garden suite and a basement apartment?
On most serviced urban residential lots in Ontario, yes. Since Bill 23, the Planning Act stops a zoning by-law from prohibiting up to three units there, which can be the house, a basement unit and a unit in a backyard building. Lot size, setbacks and servicing still decide whether both fit, and each unit needs a permit. Fine Engineering designs both units and confirms the zoning allows the pair.
Do I need a permit for a pool in Ontario?
Almost always, though the rules sit in each municipality’s own by-laws, usually as a pool enclosure permit for the fence around it. An inground pool that changes the grade can also need a site alteration permit, since Ontario’s Municipal Act lets a municipality require one for grade changes. Fine Engineering confirms the local rules and draws the pool permit and grading plans.
How much of my lot can I build on?
As much as the zoning by-law’s lot coverage limit allows, which changes by municipality and zone, together with the setbacks and any limit on hard surfaces. Where a lot has additional residential units, Ontario lets buildings cover up to 45 per cent of an urban residential lot unless the by-law allows more. Fine Engineering measures coverage and setbacks before drawing an addition or a garden suite.
Why was my grading plan rejected by the city?
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
How steep can my yard be graded?
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
What is erosion and sediment control?
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Do I need a permit to build a retaining wall in Ontario?
Often, yes. A tall retaining wall, or one that holds up a driveway, a building or a neighbour’s yard, generally needs a building permit and an engineered design, and a wall that changes the grade can also need a site alteration permit. Low garden walls usually do not. Fine Engineering confirms the height that triggers a permit on the site, then designs the wall and the grading around it.