Home additions in Richmond Hill, built out at the back or side or up as a second storey, with the existing foundation and framing checked by our P.Eng before anything is drawn. One office draws the plans, the structure and the mechanical tie-ins, files the permit and builds the addition.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first. Richmond Hill packages are filed with the City of Richmond Hill Building Division. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
The house and lot are measured, the by-law limits are checked, and the framing and foundation the addition meets are examined.
One office does electrical, HVAC, structure, plans and elevations, files them with the city and answers at no extra cost.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179We itemize it after the site visit, because the figure follows the design: the area you add, one storey or two, how far the old house gets opened up, and your finishes. In the north third of the city, on the Oak Ridges Moraine's loose soil, the footings are designed from the soil conditions actually found, and that can change the foundation design and its cost. A variance application or a second heating system would be priced as its own item.
Step by step. First we measure the house and the lot, read the zoning, and look at the foundation and frame that will carry the join. Next come the plans, the structure and the mechanical tie-ins, filed for the permit along with any approval that has to come first. On site the order is excavation and foundation, framing, the opening into the old house under shoring, rough-ins, the exterior and finishes, each one inspected, and you get the house back with its permit closed.
We give a schedule with the quote, since the approvals set the start. Zoning, drawings and any minor variance come first, then the permit review. Trees are one Richmond Hill reason it can stretch: the City's tree by-law (No. 19-25) puts a permit in front of removing or injuring any tree measuring 15 cm or more at breast height, so a large tree near the new footings adds an approval and can move the footprint.
A building permit, every time. A minor variance joins it only when the design misses a zoning standard (a setback, the height, lot coverage) by a margin the Committee of Adjustment is willing to call minor, and the permit is not issued until that decision is in. Look at the setback first: on serviced urban residential land outside the Greenbelt, Ontario now counts a minimum setback at 90 per cent of the stated figure.
Broadly, a rear or side addition standing on new foundations, a second storey on top of the house you have, or an addition that holds a separate unit with its own entrance, separations and services. Which suits yours depends on the zoning, the setbacks left over and what the existing structure can bear, and we look at all of that at the first visit.
It often is if you want to stay where you are and the lot has room to grow. It is the wrong answer on a lot whose zoning leaves no room, and the zoning check shows that early, before you have paid for a design.
Not necessarily, because they buy different things. An addition pays for a new foundation, walls and roof to gain floor area, while a renovation pays to rework the space you already have. If the problem is layout, a renovation may solve it; if it is space, it won't. We can price both routes after the site visit.
Yes, ours. Plans, structure, HVAC and electrical design come out of our office, we take the permit through the City's comments, and our crew builds it. Owners who have their own builder lined up can hire us for the drawings and engineering only.
Out, if the setbacks leave room and you'd rather leave the existing structure alone: it needs a new foundation but doesn't load the old house. Up, if the lot is tight: it skips new footings but usually means reinforcing the structure below. We compare both at the site visit once the lot and the house are measured.
With a rear or side addition, usually yes. The new foundation and walls rise outside the old ones, and the wall between is only opened near the end, propped on temporary shoring while its replacement beam goes in. A second storey is another matter, because the roof has to come off, so we work out with you whether to move out for that part.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe survey, the zoning check and the design. A survey of the lot comes first, then a check against the by-law that governs it, then the drawings and structural design, any minor variance and the building permit, with the grading and servicing plan alongside. Excavation starts after those.
Yes. The firm prepares the drawings and engineering, files the building permit, answers the examiner's questions without charging extra, and draws the variance plans if the Committee of Adjustment has to hear the addition.
Often, when the addition brings a bedroom, a larger kitchen or a rental unit to a lot the owner means to keep. Robert Grin, the firm's Director, is a Broker of Record and can estimate what the added space would mean for resale before money is spent.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
We build rear and side additions for kitchens, family rooms and bedrooms, second storeys, and additions that hold a separate unit. Each one begins with the house itself: our P.Eng inspects the foundation and frame the addition will tie into, since that decides whether new footings or the existing walls should take the load. The beams, columns and mechanical connections are then drawn in-house.
An addition here also needs a plan for the ground. With the Site Alteration Permit for a residential addition, the City asks for a Grading and Servicing Plan, and its by-law reserves that plan for a surveyor (OLS) or a professional engineer. Our P.Eng draws it, and it goes in with the building drawings.
A second storey sets a new floor onto walls and footings designed to hold up a roof. Ceiling joists were sized for a ceiling, so a new floor structure usually goes in; some houses can then carry it on new posts and beams, while others need part of the foundation strengthened first. Our P.Eng makes that call at the site visit, before any design work.
The reach of an addition is set by the zoning, so the first question is which by-law covers the lot. Council adopted By-law 93-25 on September 24, 2025, and the Ontario Land Tribunal's decision of July 2, 2026 brought most of the city under it. Lands excluded on its Schedules A and A1, and anything still under appeal, keep the previous by-law. The addition's setbacks and height come from whichever applies.
Gormley adds a second approval. Its village core is a Heritage Conservation District where every building inside the boundary is designated, so an addition that alters a property's heritage attributes needs written approval through a Heritage Permit as well as the building permit. That review can limit the materials and design.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.