What happens after a committee of adjustment decision, and who can appeal it?
A decision from the committee can be appealed to the Ontario Land Tribunal, so read the notice of decision before you plan a start date. Our part is the Committee of Adjustment package, coordinated with the city and the conservation authority, and the site and grading drawings that follow what is approved.
How do you read a grading plan?
Compare the two sets of elevations first: the survey gives the existing grades and the plan sets the finished ones. Arrows show which way surface water runs, swales carry it along the lot, and the fall between spot elevations shows whether it leaves the house behind.
What is a swale, and when does a lot need one?
A swale is a shallow channel that carries surface water along the lot to the street, a catch basin or a storm connection. A lot needs one where the natural fall would send water toward the house or across a property line, and the plan places and slopes it.
What does self-contained drainage mean?
It means water from your lot reaches the street or a storm connection without crossing a neighbour’s property. The grades are set so each roof, yard and driveway drains by its own route, and the plan shows that route with arrows and spot elevations.
What is a tree protection zone on a site drawing?
On the drawing it is a surveyed circle, with the tree’s size, that construction stays out of. Richmond Hill’s checklist asks for every tree on the property and within 6 metres of construction, neighbours’ trees included. Drawn first, the zones can move the footprint, the swale routes and where machines get in.
What is the difference between a building permit and zoning approval?
Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.
What is a minor variance?
Permission from the municipality’s Committee of Adjustment to depart slightly from the zoning by-law, for example a smaller side yard or a little more lot coverage, without rezoning the property. The Committee has to be satisfied that the change is minor and meets the other tests the law sets, and a bigger change needs a rezoning instead. Fine Engineering draws the plans and handles the application.
Can one lot have a garden suite and a basement apartment?
On most serviced urban residential lots in Ontario, yes. Since Bill 23, the Planning Act stops a zoning by-law from prohibiting up to three units there, which can be the house, a basement unit and a unit in a backyard building. Lot size, setbacks and servicing still decide whether both fit, and each unit needs a permit. Fine Engineering designs both units and confirms the zoning allows the pair.
Do I need a permit for a pool in Ontario?
Almost always, though the rules sit in each municipality’s own by-laws, usually as a pool enclosure permit for the fence around it. An inground pool that changes the grade can also need a site alteration permit, since Ontario’s Municipal Act lets a municipality require one for grade changes. Fine Engineering confirms the local rules and draws the pool permit and grading plans.
How much of my lot can I build on?
As much as the zoning by-law’s lot coverage limit allows, which changes by municipality and zone, together with the setbacks and any limit on hard surfaces. Where a lot has additional residential units, Ontario lets buildings cover up to 45 per cent of an urban residential lot unless the by-law allows more. Fine Engineering measures coverage and setbacks before drawing an addition or a garden suite.
Why was my grading plan rejected by the city?
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
How steep can my yard be graded?
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
What is erosion and sediment control?
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Do I need a permit to build a retaining wall in Ontario?
Often, yes. A tall retaining wall, or one that holds up a driveway, a building or a neighbour’s yard, generally needs a building permit and an engineered design, and a wall that changes the grade can also need a site alteration permit. Low garden walls usually do not. Fine Engineering confirms the height that triggers a permit on the site, then designs the wall and the grading around it.