The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements
Legal basement apartments in the GTA, designed to pass the inspections, with the fire separation and the escape window settled before the walls close. Our Vaughan unit has its own entrance and fire separations.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from a bare basement to a closed permit, with the inspections built into the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
Layout, separations, the structural opening and HVAC are drawn in one office and filed with the municipality. City comments are answered at no extra charge.
Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.
Kitchen, bathroom, flooring and doors, then the final inspection and the closed permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The cost follows what your basement lacks against the code. Ceiling height swings it most, because a basement that clears the height skips the structural work a short one needs. Next come the exit, whether a new door through the foundation or a larger escape window and well, then the fire separation and the new drains and vents for a second kitchen and bathroom. We price after the site visit, with design and permit fees apart from construction.
Three checks decide the length: whether the ceiling already clears the minimum height, whether the exit needs a new opening in the foundation, and whether the escape window is big enough as it stands. Each one that fails adds engineering and excavation before framing starts. A basement that passes all three goes straight to the separation and the rough-ins.
Ontario tells owners they will hear back within 10 business days on a complete second-unit application, and an incomplete or improperly designed one can be delayed or not accepted. In Markham the two-unit house must also be registered with the City, and both units are inspected for building and fire safety. The electrical work is a separate ESA notification.
It can. Where a drain may be subject to backflow, a fixture below the level of the street needs a backwater valve on its drain. A basement kitchen, bathroom or laundry below that level adds the valve to the drain scope, and it goes onto the permit drawings.
In a house with a secondary suite, the fire-resistance rating of the separation between the units can be waived when the house is sprinklered. That is a design alternative to the board-based separation, and it changes the plumbing scope of the permit, so the choice comes before the drawings are filed.
Yes. A house with a second unit may keep one furnace and one duct system if a duct smoke detector shuts the furnace down when activated. The furnace room needs protecting too: its walls and ceiling toward both units can be lined with a continuous smoke-tight layer of Type X board. Separate heating is the other route.
Not always. A unit that was already in the house years ago is judged against the existing-building rules, so its separation and exits are held to different levels than a new conversion. Which route applies depends on when the second unit went in and how the two units connect, and we confirm that before we draw.
A professional engineer. The Building Code requires a foundation to be designed by a P.Eng when underpinning is undertaken, so lowering the floor is an engineering job. Our P.Eng designs it and reviews it on site as it is built.
Usually, and three items decide it: the ceiling height, the escape window and the separation between the units. Those are the ones that cannot be patched cheaply, so we measure them before promising anything. Where drywall hides the framing and the rough-in plumbing, the inspector will want it seen, so some walls come open.
Three things decide the path. The house comes first: whether it already had a second unit, and when that went in, sets which fire rules apply. Zoning is reviewed during design, before the permit goes to the city. Then come the items that change the drawings: ceiling height, the exit and whether the suite shares your furnace. The site visit in the process above shows where your basement stands on each.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA basement apartment is legal when zoning allows it, a building permit is issued and the inspections pass. It is a self-contained second unit with its own kitchen and bathroom: a secondary suite to the Building Code, an additional residential unit to Ontario’s planning rules. Up to three units in the house are allowed as of right, so no rezoning is needed.
Hot water is sized for two units, so either one heater serves both or the suite gets its own. The choice is made with the heating plan, because both appliances share the mechanical room and its fire protection. It is settled before the plumbing is drawn.
Yes. In a house with a secondary suite the carbon monoxide alarms are wired so one alarm sounds all of them, common spaces included. Since January 1, 2026 the Ontario Fire Code also asks for one on every storey of a house with a fuel-burning appliance, fireplace or attached garage, bedrooms or not.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Good to know
In a house with a secondary suite, the wall and the floor-ceiling framing between the units can be a smoke-tight barrier of 15.9 mm Type X gypsum board instead of a rated assembly. The drawings specify the board and the sealed joints, and the inspector checks them before the ceiling is closed.
Smoke alarms in a house with a secondary suite must be interconnected, so one sounds them all across the whole house, upstairs included. The electrician pairs the alarms in both units as part of the job.
A secondary suite needs a ceiling of at least 1.95 m, with 1.85 m clear under beams and ducts, so beam depths and duct runs are planned first. A basement that falls short needs the floor lowered or another structural answer, and that choice comes before the layout is drawn.
Where one unit’s exit leads through the other, an added escape window is one allowed route in an existing house. Its open area is at least 0.38 m2 with no side under 460 mm, its sill no higher than 900 mm above the floor and within 1,000 mm of the ground outside, with 1,000 mm clear in front of any window well. That can mean a larger foundation opening.
A house that already had two units on or before July 14, 1994 falls under section 9.8 of the Ontario Fire Code where one suite is above another or the two share an interior way out. The work and any inspection are then measured against the Fire Code’s existing-building rules, which differ from a new conversion.
For an existing building under Part 11 of the Building Code, a 30 minute fire separation is acceptable, and in a house with a secondary suite a 15 minute horizontal separation is acceptable with interconnected smoke alarms. Floors and walls can then be upgraded rather than rebuilt to new-construction ratings.
The inspections follow the order the walls close in: framing and the fire separation, then insulation and vapour barrier, then drains, and the final last. An inspector or registered code agency must inspect within two days of notice that a stage is ready, so each one is called in before the ceiling is closed.
The wiring has its own check. The Electrical Safety Authority inspects for Fire Code compliance in multi-unit dwellings, so existing wiring in a house with two units can be reviewed, which can add electrical scope.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.