Is a separate permit needed for a backyard pool in Markham?
Two checks come first: what the City requires for the pool and its enclosure, and whether a tree permit is needed before digging. Markham’s tree by-law requires a permit to injure a private tree 20 cm or more across, whatever its health, and an excavation inside its roots can count. Both are checked for your address before the layout and grading are drawn.
What happens if work is built without a permit in Markham?
It stays the owner’s problem until it is permitted. In Markham the route is an application for the work as it stands, filed through ePLAN with the changes the Code requires. An unpermitted basement unit adds two steps: City officials inspect both units for building and fire safety, and the suite needs a registration inspection with Markham Fire & Emergency Services.
Can I file for a Markham building permit myself, without a designer?
Owners can apply, and on files we prepare the owner still signs as owner. What usually brings in a designer is the drawing set: Markham examines it as digital files in ePLAN and returns mark-ups that have to be answered on the sheets. Fine Engineering prepares and uploads the set under its own BCIN and P.Eng.
How long does a building permit take for a house in Ontario?
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
Why would a building permit be refused?
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
What should I do if the city issues a stop-work order?
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
What happens at a building inspection?
A municipal inspector visits at set stages to confirm the work matches the permit drawings and the Building Code, and nothing gets covered up until its stage has passed. Footings and framing are typical stages. The final inspection is the one that lets the permit close. On its own projects, Fine Engineering’s drawings are the set the inspector checks against.
Does a building permit expire?
It can be revoked, which has much the same effect. The Building Code Act lets the chief building official revoke a permit when work has not seriously begun within six months of issue, or has been halted for over a year. A permit whose inspections were never finished stays open on the property. Fine Engineering can draw what an old permit still needs so the city can close it.
Do I need a permit to demolish a house?
Yes. Ontario’s Building Code Act treats demolition like construction: it cannot start until the chief building official has issued a permit. A rebuild therefore usually needs one permit to take the old house down and another for the new one. A protected tree or a conservation authority’s regulated area on the lot can add an approval of its own. Fine Engineering files both applications on rebuilds.
How high does a basement ceiling need to be for a legal apartment?
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
Does a basement apartment need a second exit?
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Do smoke alarms need to be interconnected in a house with a basement apartment?
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Is a legal basement apartment worth it?
For many homeowners, yes. A legal second unit can earn rent and add property value, and because it was built under a permit, it avoids the trouble an unpermitted suite causes when the house is sold. The return depends on how much the basement needs, whether that is more headroom, a new exit or fire separation. Fine Engineering prices that work before any drawing starts.