
Your plan, drawn properly
Custom floor plans
Your sketch or brief becomes a layout, tested for zoning and code fit, then drawn up for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Markham, York Region
Custom homes in Markham for knockdown and infill lots: the architectural, structural and mechanical design drawn by one P.Eng and BCIN team, taken through the City’s approvals, then coordinated on site with the licensed builder you choose.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build. We draw Markham packages to the checklist of the City of Markham Building Standards Department, the office that receives them.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
From lot to occupancy permit there are four steps, and one office answers for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
One office develops the structural, mechanical and architectural drawings together, then files for permit and follows the city’s comments through.
Digging, foundation, framing, envelope, the rough-ins and finishes go to the builder we coordinate. Structural stages all get the engineer on site.
Occupancy permit and final inspections done, the house matches your approved drawings.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179In Markham the lot adds costs of its own before the house is priced. An infill house goes through the City’s Residential Infill Grading and Servicing application, a design and review of its own; a lot in a heritage district needs approval for the demolition and for the new house, and the demolition goes to Council; and a protected private tree near the footprint (trunk 20 cm or more across) needs a permit or a design that keeps the new footings off its roots. Size, finishes and systems set the rest. Construction is priced by your builder, while the design, engineering and permit are ours, quoted after a free consultation.
The lot decides as much as the house. Design and the permit lead; on a knockdown the old house has to come down first, and in a heritage district both the demolition and the new house wait on approval. Construction follows, and after final grading the lot is not closed until the sealed grading certificate is in. Expect a schedule with the quote, updated as the City answers.
A building permit for the house and a demolition permit for any house it replaces, plus what the lot brings: the Residential Infill Grading and Servicing application on an infill lot, a minor variance where the design breaks a zoning rule, heritage approval in a district, a tree permit for a protected private tree, and, on a regulated lot, TRCA’s permit or clearance, which the City needs before it can legally issue the building permit.
Both, from our own office. Our BCIN designer, qualified in Small Buildings, prepares the architectural drawings, and our P.Eng designs and stamps the structure. The HVAC design and energy efficiency calculations are drawn from the same plans, so the set the City reviews comes from one team.
Yes, through design and the permit: nothing happens to the old house until its demolition permit is issued. Once demolition starts the house is gone, and the demolition date sits in the schedule we give you, so the move can be planned around it.
As accurate as the drawings behind it. Our quote for the design, engineering and permit comes once there is a layout to measure, and your builder prices construction from the same set, so both rest on one design. A change during construction is drawn and priced before it is built. What neither quote can see is what the ground hides, which is why the soil question is settled before the footings are final.
Well before the building season you have in mind, because the approvals come first. On a Markham knockdown, the zoning check, any variance, heritage or TRCA steps, the infill grading submission and the permit review all have to be through before an excavator arrives.
Yes. The schedule we give with the quote is updated as the City responds, and during construction the engineer who drew the house is on site at each structural stage, so you hear about a change from the person who designed that part.
Yes, unless you build it yourself as the owner. Under Ontario law the builder you hire must hold an HCRA licence (Home Construction Regulatory Authority) and has to enroll your house with Tarion before any construction starts; ask to see both before you sign. Our part is the design, the engineering and the permit, then coordinating construction with your builder. On a Markham infill lot that coordination carries weight, because the City’s Building Standards Department is monitoring infill homes over their record of non-compliance with permit documents.
Yes. They are checked first against the zoning that governs your lot and against the Building Code; we then add whatever structural, mechanical and electrical pages the permit still lacks and coordinate the build from that set. Changes needed to fit the lot are agreed with you before filing.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationMostly the approvals around the house rather than the house itself. A private tree with a trunk of 20 cm or more needs a permit before it is injured, the infill grading and servicing plan has its own review, and a heritage district needs approval for both demolition and new construction. Whether the old foundation can be reused is an engineering check.
On Fine Engineering’s projects page. It includes a 1,750 sq ft new custom home, taken from the client’s sketch to occupancy with the architectural, structural and mechanical design done by one team. For work in Markham itself, our drawing samples include a commercial set that carries the City’s review stamp.
Yes. Markham’s four heritage conservation districts are Thornhill, Markham Village, Buttonville and Unionville, and owners of every property in them must obtain approval for new construction and demolition. A demolition there goes to Council, and the new house is designed to the district’s guidelines.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
Our work starts long before excavation and continues through it. A walk of the lot and a read of its zoning, conservation and servicing limits come first, then your sketch or brief becomes a first layout. The architectural, structural and mechanical drawings are developed together in one office, filed for permit and followed through the City’s comments.
On a knockdown lot the old house is part of the job: its demolition, whether its old foundation could carry the new house (a reuse our P.Eng has to approve), and the trees and grades the new footprint has to respect. We coordinate the construction with your licensed builder, and our engineer visits at every structural stage.
Markham’s Building Standards Department says the number of new infill home projects is increasing each year, that these projects have a record of non-compliance with their building permit documents, and that it is monitoring them. An infill house in Markham is therefore a project the City is watching against its approved drawings.
We plan for that scrutiny through the drawings and the coordination. The office that drew the house coordinates construction with your builder, so a change on site is drawn and priced before it is built, structural changes are checked by our engineer, and the permit set stays the reference the inspector works from.
A new house’s envelope (setbacks, height, coverage) is drawn to the zoning by-law that governs that lot. Markham’s Zoning By-law 2024-19 does not apply to every property, so the City’s interactive zoning map is the first check on a knockdown lot, and anything the design cannot fit goes to the Committee of Adjustment before the permit.
In a heritage conservation district, every property needs approval for new construction and for demolition, and a demolition there goes to Council. On a knockdown lot inside one, both the old house coming down and the new one going up wait on that approval before the permit can proceed.
Custom floor plans from your sketch or brief; foundations, framing and roof designed by our P.Eng for the house and the soil; heat loss and gain with equipment sizing and ductwork; and the energy efficiency design the permit requires. A basement suite can go into the first plan instead of being converted later. We cover all of Markham from our Richmond Hill office.
Whoever builds the house, a licensed builder you hire or you as the owner, works from that stamped set, and we coordinate construction with them. The new home warranty can turn on that arrangement, so we go through it with you before a construction contract is signed.
Design and the permit come before construction, and once a complete application meets the Building Code’s criteria, the Code sets a statutory review period for a house permit. The end of the schedule is easier to miss. After final grading, Markham releases its lot grading undertaking only when it receives a grading certificate signed and sealed by a Professional Engineer or an Ontario Land Surveyor, so the job runs past move-in to that certificate.
Most of the money goes into the house: floor area, finish level, the mechanical systems and whatever site work the lot demands, all of it in your builder’s construction price. We quote the design, engineering and permit separately, once the first layout exists, since there is nothing to measure before that.
An infill lot in Markham adds a submission of its own. A detached infill house does not need a Site Alteration Permit, but it does go through the Residential Infill Grading and Servicing application, a grading and servicing plan reviewed by the City’s engineering staff apart from the building drawings. That plan, its review and the certificate at the end belong in the budget.
Contact us
Free first call: bring the lot address and a sketch, and we go through what it needs.
First consultation free(416) 990-9179