Interior Renovations · Markham, York Region

Home Renovations in Markham

Home renovations in Markham covering a kitchen moved to the other wall, a basement framed into rooms or a main floor opened end to end, with the drawings, the engineering, the City permit and the construction all coming from one team that answers for every stage.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Open main floor with a sage-green shaker kitchen, light oak floors and a dropped beam where a wall used to stand
Recent project
Richmond Hill · 2,700 sq ft
Municipality
Markham, York Region
Permit office
City of Markham Building Standards Department
From our office
About 30 minutes
Fig. 01 · Open main floor with a sage-green shaker kitchen, light oak floors and a dropped beam where a wall used to standRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Most interior work we build starts with a wall someone wants gone. The rest follows from that: the beam, the systems behind the drywall, the finishes, and the inspections in between. We draw Markham packages to the checklist of the City of Markham Building Standards Department, the office that receives them.

  • Renovated kitchen with walnut cabinetry and a marble island

    The wet rooms

    Kitchens & bathrooms

    New layouts, plumbing moved to suit them, and the ventilation and electrical brought up to code while the walls are open.

    • Layout & cabinetry planning
    • Plumbing relocation & DWV
    • Ventilation & lighting
    • Tile, fixtures & finishes
  • Open-plan kitchen and dining room

    Rooms combined

    Open-concept layouts

    Combining rooms, widening openings and moving a stair so the main floor works as one space.

    • Room combining & openings
    • Stair relocation
    • Floor levelling
    • New partitions
  • Steel beams left exposed after a wall came out

    Engineered in-house

    Load-bearing wall removal

    No stud gets cut until shoring is in place, and our P.Eng’s design and stamp cover the beam, the posts and their footing.

    • Structural assessment
    • Beam & post sizing
    • Temporary shoring
    • Permit & inspections
  • Renovated bathroom with a walk-in shower

    Behind the drywall

    Plumbing, HVAC & electrical

    Once walls are open, systems get reworked: circuits added, ducts resized, supply and drains moved.

    • Plumbing rerouting
    • Duct & register changes
    • Panel & circuit work
    • Ventilation to code

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

06 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Existing drawingsBeams, joists and bearing walls
  2. Layout & permit drawingsWorked out with you
  3. Structural designWall removals, stamped by our P.Eng
  4. Mechanical & electricalPlumbing too, all coordinated
  5. Building permitFiled and followed to issue
  6. ConstructionEngineer on site for structural work
  7. InspectionsBooked and passed at each stage

How it runs

Process: 4 steps from first call to sign-off.

Four steps, one contract. The office that draws the beam is the one that installs it.

  1. Walk-through & scope

    We walk through the house and hear what you want changed, then explain what the permit includes and which walls bear load.

  2. Design & permit

    The structural, mechanical and layout drawings leave one office for the city. We reply to examiner comments at no added cost.

  3. Build

    Our crew demolishes, builds the structure, then does rough-ins and finishes. On site, the engineer rules on anything unexpected behind a wall.

  4. Inspections & handover

    Framing, plumbing, electrical and final inspections are booked as each stage is ready. You get the closed permit with the keys.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address
  • Photos of the rooms you want to change
  • Any existing drawings or a previous permit
  • A rough budget range, if you have one
  • Your timeline, and whether you will stay

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: interior renovations in Markham, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • There is no single figure; the price follows what the space has to become. A basement finished for the household is mostly framing, insulation, drywall and floors, while a bathroom with no rough-in under the slab adds plumbing and moving a post adds structure. A whole floor taken back to the studs adds layout, structural and mechanical work at once. In Markham, separate basement rooms and new piping are both permit work, so drawings and inspections belong in the home renovation budget. We price from the site visit.

  • Yes, whenever new plumbing piping goes in: Markham lists installing any new plumbing piping as work that needs a building permit. A sink moved to an island, a second sink or a new dishwasher line therefore brings drawings and an inspection. New cabinets, counters and fixtures in their existing places do not. A wall taken out to open the kitchen is permit work on its own, load-bearing or not.

  • It turns on the scope and on whether the work waits for a permit. In Markham that wait covers more jobs than people expect, since moving any wall, adding piping or framing basement rooms all need a permit first, while a refresh that keeps the layout can start once the scope is agreed. Construction then runs around the inspections. We put a schedule in the quote and adjust it when the City responds.

  • For most interior jobs, two bodies. The City of Markham issues the building permit and sends its inspectors at each stage, and the electrician takes out a separate permit with the Electrical Safety Authority for the wiring. When a renovation reaches the outside of the house, other approvals can come into it, and we check for those at the first visit.

  • It is worth planning for. Markham told residents in March 2025 that its Markham Village and Unionville flood study area was built out before 1978, when storm drainage was designed for only a 5-year level of service, and that very large storms overload the system and surcharge into basements. For a finished basement there, raise it before the layout is fixed, so finishes, storage and what sits at floor level are chosen with that history in mind.

  • Who draws and files the permit, who designs any beam, and who books the inspections. Markham takes applications only through its online ePLAN portal, so ask whether the contractor files there or expects you to. Ask whether a licensed engineer stamps the beam where a wall carries load, and who calls the City in at each stage. Then ask to see the issued permit before anyone opens a wall.

  • The era sets the list. Markham had 2,835 occupied homes from 1960 or earlier in the 2021 census, and 17,710 more from the two decades that followed, and for a house from those years the era is where a renovation’s checks begin. Before design we confirm which walls carry load, the foundation’s condition, what the existing ducts and drains can take, and whether the electrical panel has spare capacity.

  • Yes, in two ways. A renovation for one household, such as a main-floor bedroom, a larger bathroom or a stair moved, stays a single dwelling. A self-contained second unit with its own kitchen, bathroom and entrance is a different permit, with a fire separation, a 1.95 m ceiling and its own way out, and Ontario’s rules let anyone live in it, family or not.

  • Most of the house, in most cases, because the work stays below the main floor. The interruptions come when the work reaches shared systems such as the furnace, the electrical panel or the main drain. Those moments are planned into the schedule with you, so you know in advance when heat, power or water will be off.

  • That part of the job waits for our engineer. A notched joist or a post without a proper footing gets a repair detail drawn for it, and if the detail departs from what Markham approved, the revised sheet goes back to the City through ePLAN, the portal it uses for every resubmission. The inspector then checks that wall against a drawing that matches it.

Searched & answered

People Also Ask: what Markham searches about interior renovations.

Short answers to the interior renovations questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Fine Engineering splits each quote between work that needs a Markham permit and work that doesn’t, and lists drawing and permit fees apart from construction. The split follows the City’s own lists: new plumbing piping or a moved wall lands on the permit side, while a swapped water heater or a replacement furnace does not.

  • Ahead of the season you want to build in, because permit work waits for the permit. In Markham any job that moves a wall, adds piping or divides a basement into rooms goes through review first, so the drawings are best started well before the build date. Work that needs no permit can begin once the scope is agreed.

  • A permit before any wall comes down, because Markham lists removing a non-loadbearing partition as permit work as well as a structural wall. Where a wall did carry the floor above, an engineer sizes the beam that replaces it and the posts and footings under that beam.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

Home renovation in Markham, start to finish

Kitchens, bathrooms, basements and open main floors, with the plumbing, ductwork and wiring behind them updated while the walls are open. We take on home renovation work across Markham, and every job starts with a visit about what you want changed and what the house allows.

The engineering stays in-house. If a wall comes out, our P.Eng designs the replacement beam, the posts under it and their footings, while the same office draws the layout, files the permit and builds it. Anything unexpected behind the drywall is decided on site by the engineer, and the drawings are revised before that area is closed up.

Kitchen renovations in Markham: when the plumbing moves

Most kitchen plans come down to where the sink, the range and the island go, and that decides the paperwork. Keep the sink where it is and the job is mostly cabinets, counters, floors and lighting. Move it to an island and new piping runs under the floor, which Markham treats as permit work, so the layout is drawn, filed and inspected before the cabinets arrive.

The range hood and the circuits come with the layout. Ducting is routed against the joists on the same drawings, and the new circuits go on the electrician’s ESA permit, which we coordinate. If the kitchen opens into the dining room, the wall between them is part of the same set.

Interior renovation permits in Markham: the inside counts

Markham’s permit page says plainly that there is no exemption from a building permit just because the construction is inside a dwelling. A renovation that never touches the outside of the house can still need drawings, a permit and inspections.

So the first visit sorts the work into permit and no-permit lists, and the quote prices both. Permit work is drawn and filed before it starts; the rest can begin once the scope is agreed. We also tell you which inspections the permit will bring, so the schedule allows for them.

Renovation rules in Markham: what can go ahead without a permit

The City’s list runs the other way too. Markham names swapping plumbing fixtures or a water heater, replacing the furnace, and putting in air conditioning or a heat pump as housing jobs that need no building permit. A bathroom refresh that keeps the toilet, tub and vanity where they are, with a new furnace downstairs, can stay on that side of the line.

Wiring follows its own rules either way. In Ontario nearly all electrical work is permitted through the Electrical Safety Authority, not the City, and that permit belongs to the licensed electrician doing the work. We schedule it alongside everything else.

Basement rooms in Markham houses: the permit comes first

Framing separate rooms in a basement needs a building permit in Markham, and so does any renovation that turns a partial basement into a full one. A finished basement with a bedroom, an office and a bathroom is a permit job before the first stud goes up, and the drawings show the rooms, the way out of any bedroom and the plumbing under the slab.

A basement for the household is not a second unit. If you might rent it later, say so at the start: a legal unit adds a 1.95 m ceiling, a fire separation, linked smoke alarms and a safe exit, and building those in once costs less than opening a finished basement afterwards.

Opening up a Markham main floor

In Markham, taking down even a non-loadbearing partition is on the permit list, alongside adding, removing or altering any structural wall or column. An open-concept home renovation is therefore drawn and permitted before demolition, whatever the walls turn out to carry.

Where a wall does carry load, the beam that replaces it is sized by our P.Eng for the joists and any posts bearing on it, the new posts are taken down to footings that can carry them, and shoring is in place before a stud is cut. Ducts and pipes that ran inside the wall are rerouted on the same drawings.

Contact us

Wall down. Beam in. Kitchen where you wanted it.

Tell us what you want changed and we’ll tell you what it involves, on a free first call.

First consultation free(416) 990-9179