Mechanical & Electrical · Markham, York Region

HVAC and Mechanical Design in Markham

HVAC design in Markham that the examiner can follow: room-by-room heating and cooling loads, the furnace or heat pump sized from them, ducts and ventilation laid out around the framing, signed under our own BCIN HVAC registration; plumbing and electrical pages are added when the job needs them.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Open office floor with exposed spiral ducts, round diffusers and sprinkler pipes over a polished concrete floor
Deliverable
Permit-ready MEP drawings
Municipality
Markham, York Region
Permit office
City of Markham Building Standards Department
From our office
About 30 minutes
Fig. 01 · Open office floor with exposed spiral ducts, round diffusers and sprinkler pipes over a polished concrete floorRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Structure, mechanical and electrical are drawn under one roof from shared plans. Ducts are not squeezed out of joist bays by beams, and one coordinated set goes to the examiner. The Markham package is sent to the City of Markham Building Standards Department, and the drawings follow its checklist.

  • Exposed spiral ductwork across a ceiling

    Heating & cooling

    HVAC design

    Heat-loss and heat-gain calculations, equipment sizing and duct layouts that meet the Ontario Building Code and get through permit review.

    • Heating & cooling load calculations
    • Equipment sizing & system selection
    • Ductwork design & layout
    • Energy-efficiency design & permit-ready mechanical drawings
  • Renovated bathroom with a walk-in shower

    Supply & drainage

    Plumbing design

    Supply piping, drain, waste and vent lines, fixture positions, plus hot-water sizing for homes, commercial fit-outs and second units.

    • Water supply layout
    • Drain, waste & vent (DWV) design
    • Fixture layouts & hot-water sizing
    • Plumbing drawings for permit
  • Track lighting and ductwork on a white ceiling

    Power & lighting

    Electrical design

    Calculated loads, panel schedules and alarm and lighting distribution go in the building permit package, in step with the mechanical loads.

    • Electrical load calculations
    • Panel schedules
    • Lighting & alarm distribution
    • EV charger circuits
  • Fire safety equipment inspection

    Life safety

    Building fire safety

    Fire alarm, sprinkler, emergency lighting and exit-sign design for occupant safety and code compliance, drawn with the permit set so the fire department reviews one package.

    • Fire alarm layout
    • Sprinkler system design
    • Emergency lighting layout
    • Commercial exit signs

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Heat loss & heat gainCalculated for each unit
  2. Equipment sizingFurnace, AC, heat pump or ERV
  3. Duct designLayout and sizing drawings
  4. Plumbing layoutsSupply, drains and isometrics
  5. Electrical designLoad calculation, panel, lighting
  6. Fire & life safetyAlarm, sprinklers, emergency lighting
  7. Permit-ready sheetsCoordinated with the full drawing set

How it runs

Process: 4 steps from first call to sign-off.

The mechanical and structural sheets both come from one set of plans, so nothing competes for joist space. All four steps run with the building permit instead of after it.

  1. Review the plans & the building

    We gather the architectural drawings, plus the insulation and window specs. In an existing building, we look over the mechanical room and panel.

  2. Calculate the loads

    We work out heat loss and gain room by room to CSA F280, plus electrical demand and plumbing fixture units, so sizing follows the building, not a rule of thumb.

  3. Design & coordinate

    Circuits, pipes and ducts are laid out against the structure. Any clash gets sorted on paper, before it reaches a trade on site.

  4. Permit & trade support

    During construction we stay on hand for the installing trades. The sheets go in stamped with the permit, and the examiner’s mechanical comments are answered at no extra charge.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Architectural drawings, if another designer made them
  • Insulation, window and door specifications, if known
  • Photos of the mechanical room, ducts and panel
  • Equipment you have in mind, if any
  • For commercial units: kitchen or process equipment lists
  • Any city comments on mechanical or electrical work

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: mechanical & electrical in Markham, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Usually not. Markham’s list of housing work that needs no building permit includes replacing a furnace, adding air conditioning units or a heat pump, and replacing plumbing fixtures or a water heater. The exception is fuel: a new furnace that runs on a new fuel source is on the permit list. Separately, the electrical side of a heat pump install is permitted through the ESA.

  • The building’s size and what it already has. Statistics Canada’s 2021 census puts 20,545 of Markham’s occupied homes in 1980 or earlier (2,835 of them from 1960 or before), and an older house’s existing ducts and equipment shape what a new design must allow for, so we look at the mechanical room and the panel before pricing. Loads and ducts for one house make a small package; plumbing, electrical or a second unit enlarges it.

  • It trails the architectural drawings, because the loads are calculated from them: room sizes, windows and insulation have to be settled first, and a floor plan that keeps changing holds the mechanical design up with it. Our quote carries a date, and examiner changes to the mechanical pages are made at no extra charge.

  • Much of the change is plumbing. A second kitchen and laundry mean new drain, waste, vent and supply piping, which Markham lists as permit work, so those runs are drawn on the set along with the hot water sizing. If that sizing shows the existing water heater can’t serve both units, replacing it is on the City’s list of work needing no permit, though the new one is still chosen to the calculated demand. Heating loads are worked out for each unit, and an electrical load calculation shows whether the service can carry the second kitchen.

  • Not the City. Markham lists adding a heat pump among the housing work that needs no building permit, so no examiner reviews its size, and the heat loss calculation becomes the only check. We size the unit from a room-by-room calculation and confirm the ducts and the panel can take it before your installer orders anything.

  • We draw the design: load calculation, panel schedule, lighting, devices and any alarm layout. The permit for the wiring itself is the electrician’s to take out with the Electrical Safety Authority, apart from the building permit Markham issues, and the ESA inspects the installation. The City sees our electrical pages as part of the permit set.

  • Yes, as part of the electrical design. A load calculation for the house with the charger added shows whether the existing panel and service can carry it, and the panel schedule tells your electrician what to install. The wiring needs a permit and an inspection from the Electrical Safety Authority; the charger does not usually need a building permit.

  • Where Fine Engineering is building the project, our construction team schedules and coordinates the HVAC, plumbing and electrical trades. On a design-only job your contractor installs from our stamped pages, and we answer their questions as the work goes in.

  • Start with the house’s age. The 2021 census counts 20,570 Markham homes built from 1981 to 1990, and a house that old may have had its basement finished, its windows replaced or a room added since its ducts were laid out for the original rooms. We compare a room-by-room heat loss for the house as it stands with the ducts that are actually there, and the gap shows where the fix goes.

  • Not on its own. Markham lists replacing a furnace among the housing work that needs no building permit, unless the new one runs on a different fuel. Inside an addition’s permit it is another matter: the heat loss is redone for the whole house as it will be, and the furnace or heat pump named on the mechanical pages has to match that figure when the examiner reviews the set in ePLAN.

Searched & answered

People Also Ask: what Markham searches about mechanical & electrical.

Short answers to the mechanical & electrical questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Because the equipment has to be sized from it. Ontario’s 2024 Building Code says heating equipment must be sized to a calculated heating load, with CSA F280 the usual method, so the room-by-room winter losses and summer gains in the calculation are what justify the furnace or heat pump on a Markham set.

  • Whenever new piping goes in. Markham lists installing new plumbing piping as permit work, so a new bathroom, a relocated kitchen or a second unit’s kitchen comes with a plumbing layout: water supply, drain, waste and vent, fixture positions and hot water sizing.

  • It turns on whether the renovation brings HVAC design into a permit. Replacing a furnace or adding a heat pump needs no building permit in Markham, so there is no ventilation design to file. A second unit, an addition or a furnace on a new fuel puts mechanical pages into the permit, and those usually have to provide mechanical ventilation, most often with an HRV or ERV.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

HVAC design in Markham: when it joins a permit

A new furnace that burns a new fuel source is on Markham’s building permit list, and that is one point where a heating design goes in with an application. Additions, second units and new houses bring mechanical pages into their own sets. For each, the room-by-room loads come first, then the equipment size, the duct layout and sizing, and the ventilation design.

Plumbing and electrical pages join when the scope adds them: drain, waste and vent layouts with hot water sizing, or a load calculation and panel schedule. Every page is drawn off the plans the structure was drawn from, in one office, so a duct never needs a hole through a joist the beam design is counting on.

Filing the HVAC design work in Markham

Markham takes building permit applications only online through ePLAN and no longer accepts paper. The mechanical sheets go up as digital files with the rest of the set, and plan review runs in the portal. When the examiner marks up a duct layout or asks for the heat loss figures behind an equipment size, the reply and the revised sheets go back through ePLAN, at no extra charge.

Contact us

Loads calculated. Ducts routed. Trades aligned.

Send the drawings and we’ll say what the city will want for HVAC, plumbing and electrical. The first call is free.

First consultation free(416) 990-9179