York Region · About 30 minutes

Newmarket building permits: drawings and engineering.

Newmarket building permits, start to finish, from one P.Eng and BCIN office: we check the zoning first, then prepare the drawings with their structural, HVAC and grading engineering, upload the set to the Town and reply to each examiner comment at no extra charge.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Concrete driveway climbing a sodded slope between gravel strips to a grey and buff brick two-storey house
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
Conservation authority
LSRCA
From our office
About 30 minutes
Fig. 01 · Concrete driveway climbing a sodded slope between gravel strips to a grey and buff brick two-storey houseRichmond Hill, ON

P.Eng · BCIN · Newmarket

Permits & Engineering in Newmarket: drawn and stamped in-house.

What a service covers, what to send first and who checks it here are on its Newmarket page. The same team, with P.Eng and BCIN, does all six.

  • Bright, newly framed room mid-renovation with sawhorses on the floor

    Renovation underway

    Residential Permits: read more

    The sheets the city expects, signed by a qualified designer.

    • Legal basements & second units
    • Additions & garden suites
    • Load-bearing wall removal
    • Deck, porch & pool permits

    City requests

    Handled at no extra charge

  • Open-plan commercial office with a glass-walled meeting room

    Office fit-out

    Commercial Permits: read more

    Occupancy, zoning and exit checks before a use changes.

    • Change of use
    • Zoning & minor variances
    • Business licences
    • Fire & life-safety upgrades

    Reviewed for

    Zoning + Ontario Building Code

  • Roof trusses silhouetted against a dusk sky

    Roof trusses

    Structural Engineering: read more

    Wood, concrete and steel, from a single beam to a full framing set.

    • Wood framing
    • Foundations & slabs
    • Steel beams & connections
    • Inspections & city letters

    Stamped by

    Licensed P.Eng (PEO)

  • Exposed spiral ductwork and track lighting across a white ceiling

    Ductwork & lighting

    Mechanical & Electrical: read more

    HVAC, plumbing, electrical and fire safety drawn as one package.

    • HVAC & load calculations
    • Plumbing & DWV
    • Panels & EV chargers
    • Fire alarm & sprinklers

    Deliverable

    Permit-ready MEP drawings

  • New concrete driveway curving up to a modern house at dusk

    Driveway & grading

    Site Engineering: read more

    Lot plans checked against municipal drainage and tree criteria.

    • Grading & drainage plans
    • Site alteration permits
    • Pool & landscape design
    • Committee of Adjustment

    Deliverable

    Grading & site plans

  • Stone-clad front entrance of a detached house

    Front entrance

    Home Inspection: read more

    Structure, mechanicals and code read by an engineering team.

    • Pre-purchase inspections
    • Pre-renovation reviews
    • Structural assessments
    • Code compliance review

    Inspected by

    Our engineering team

Design · permit · build

Renovations in Newmarket: built by the team that engineered them.

We draw it, permit it and build it. When something unexpected turns up behind a wall, the engineering call gets made on site.

  • Renovated kitchen with walnut cabinetry and a marble waterfall island

    Walnut kitchen

    Interior Renovations: read more

    Walls, floor plans and the systems behind them, reworked.

    • Kitchens & bathrooms
    • Open-concept layouts
    • Load-bearing wall removal
    • Plumbing, HVAC & electrical

    Recent project

    Richmond Hill · 2,700 sq ft

  • Finished basement suite with a kitchenette and a living area by a fireplace

    Basement suite

    Legal Basements: read more

    A second unit designed backwards from what the inspector checks.

    • Separate entrance
    • Fire separation & egress
    • Kitchen & bathroom
    • Inspection scheduling

    Recent project

    Vaughan · 1,100 sq ft

  • Timber-framed backyard suite under construction at golden hour

    Suite framing

    Garden Suites: read more

    A detached backyard suite for relatives or a tenant.

    • Zoning & setback review
    • One- & two-storey suites
    • Structural framing
    • Rental-ready finishes

    Recent project

    Richmond Hill · 1,250 sq ft

  • Wood-framed addition going up against the side of a blue-sided house

    Addition framing

    Home Additions: read more

    Extra rooms or a new duplex unit, with the beams sized before framing starts.

    • Rear & side additions
    • New duplex units
    • Beams & columns
    • Mechanical tie-ins

    Recent project

    London · duplex unit

  • Curved composite deck with cable railings behind a modern house at sunset

    Rear deck

    Decks & Porches: read more

    Decks, porches and canopies, planned around the permit height line.

    • Decks & railings
    • Covered porches
    • Rear canopies
    • Footings & structure

    Recent project

    London · 570 sq ft porch

  • Two-storey house with dark siding and lit windows at dusk

    Finished exterior

    New Custom Homes: read more

    A new house drawn for your lot, then coordinated through the build.

    • Custom floor plans
    • Structural design
    • HVAC & energy calculations
    • Build coordination

    Recent project

    Haldimand County · 1,750 sq ft

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: building in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Our part is quoted after a free first consultation and covers the drawings, any structural, HVAC or grading engineering, the upload to the Development Portal and every reply to the examiner. The lot can add work in Newmarket: a parking layout for a secondary suite, an arborist report and possibly a tree protection deposit for a regulated tree, or a variance package for the Committee of Adjustment. The Town’s own permit fee is charged separately, on its schedule.

  • For a house, Ontario’s Building Code gives the municipality 10 business days to issue the permit or refuse it with reasons, and that count starts only when the application is complete. The longer waits in Newmarket come from approvals that have to be in place first, such as a variance from the Committee of Adjustment. Buyers can save time here: the Town accepts a permit application before you take possession and issues the permit once a copy of the deed shows the house is yours, so the review can run during the closing period.

  • Anything Ontario’s Building Code Act treats as construction, and that includes materially altering a house as well as adding to it. In practice the list covers removing a load-bearing wall, a new bathroom, a finished basement, a new entrance cut through the foundation, an addition, an attached deck, a large outbuilding and a new house. A basement apartment or a garden suite carries one more step after its final inspection, because the Town requires every additional unit to be registered.

  • No. Paint, flooring and new cabinets in the same layout change the surfaces, not the building, so no building permit is involved. The exception to watch is downstairs: the Town lists finishing a basement as permit work, so new framing and drywall in a basement is not treated as decorating. Electrical work on its own sits outside the Town’s permit system altogether, because Newmarket does not regulate electrical installations. A panel upgrade with no other work needs no building permit, and its permit questions go to the Electrical Safety Authority.

  • A completed form, the set of drawings the Building Code calls for, and any approval the project depends on. For a house, the drawings usually show the building as it stands, the proposed floor plans, elevations and sections, and a site plan with setbacks and lot coverage, with structural and HVAC sheets wherever the work touches them. A BCIN designer adds their registration details to the drawings. If a regulated tree has to come out for the work, its removal permit and arborist report run alongside the application.

  • Digital files. The Town of Newmarket takes the application and every supporting document through its online Development Portal, so the permit set is prepared for upload rather than printed. We do the upload. When the examiner asks for changes, we revise the affected sheets and upload them in reply, and you do not have to resubmit anything yourself.

  • Sometimes. Ontario lets an owner who has the skills draw their own permit set; otherwise a BCIN-qualified designer, an architect or an engineer prepares it. The Professional Engineers Act decides when an engineer has to design the work, for example a beam beyond the Building Code’s span tables, steel framing or underpinning. The ground matters in Newmarket: the town sits on deep glacial sand and gravel with no rock outcrops, so footings and any dig beside a neighbour’s foundation are designed for granular soil. Our engineer holds a P.Eng licence as well as BCIN qualifications, so whichever the work calls for, it comes from the same office.

  • The review waits. Ontario’s review period only starts once an application is complete, and until then the examiner’s job is to ask for whatever is missing. On a Newmarket file we settle a few points before uploading: which of the Town’s two zoning by-laws the drawings answer to, whether a Committee of Adjustment variance has to come first, and whether a regulated tree needs its own permit. Anything else the examiner raises, we answer at no extra charge.

  • No. Anything the permit covers has to wait for it. Starting early can bring a stop-work order or fines, and an inspector can ask for finished work to be opened up so it can be checked. That applies to clearing the site too: a regulated tree in the way needs its own Town permit before it is cut down. Removing non-structural finishes can sometimes begin earlier, but ask us before anything comes out.

  • Not on its own, though the chief building official can revoke one where work never properly starts or stalls for a long time. The problem worth watching in Newmarket is a permit that never closed. On a basement apartment or garden suite it blocks registration, because the Town wants the final building inspection report before registering the unit. If you are buying a house with a unit, ask for its permit history before closing; we can pick up an open file and draw what it still needs.

Searched & answered

People Also Ask: what Newmarket searches before it builds.

Short answers to what homeowners, builders and business owners search most, from deck permits to change of use.

Not covered here? Book a free consultation
  • Whichever stages the Town lists on your permit, each booked as the work reaches it. Wiring is not among them: Newmarket leaves electrical installations to the Electrical Safety Authority, which inspects the electrical work under its own permit, apart from the Town’s visits.

  • A building permit. A wall that carries the floor or roof above is structure, so the Town needs drawings of the beam that replaces it, the posts at each end and the footings under them, stamped by an engineer when the span goes past the Building Code’s tables. Cristian Chan’s Newmarket townhouse had walls taken out for an open living room under drawings we prepared.

  • The Town can stop the work, and putting it right takes a permit application for what was built. Inspections can mean opening walls. Basement apartments have their own route to registration: a unit built before 1995 needs a Central York Fire Services letter confirming Fire Code compliance, a newer one a final building inspection report, and both need an ESA report covering the upper and lower units.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

About Newmarket

Work that needs a Newmarket building permit

The Town of Newmarket names the common cases itself: a deck attached to a building, finishing a basement, a new home or an addition, and a detached structure larger than 15 square metres. For a deck or an outbuilding the answer turns on whether it is fastened to the house and how big it is, so we measure both before anything is drawn.

A permit comes before the work, and the Town’s inspectors visit at the stages written on it. They check the work against the filed drawings, which is why a change decided on site goes onto the drawings before the wall or floor is closed. The permit stays open until every listed inspection has passed and the Town closes the file.

Newmarket zoning bylaw: 2010-40, 2019-06 and Moraine lots

Newmarket’s zoning sits in two by-laws: Zoning By-law 2010-40, the Town’s parent by-law, and a separate Urban Centres Zoning By-law 2019-06. Properties in the Oak Ridges Moraine area are referred to the Planning Department for their zoning. Setbacks, height and the number of units a lot can hold all come from whichever of these governs your address, so confirming it is the first call we make.

When a design runs past a setback, height or coverage limit, the route is a variance. In Newmarket the Committee of Adjustment decides it, and the Town cannot issue the building permit until it has, so we tell you at the zoning stage whether one is needed and draw the variance package and the permit set from the same design.

Newmarket secondary suite: the third parking space

Each additional residential unit in Newmarket needs one parking space of its own, on top of the two the main house already requires. The Town is specific about where it goes: outdoors, not in a garage, inside the maximum permitted driveway width and perpendicular to the street. A basement apartment or garden suite only works on a lot that can take that third space, so we plot it before the unit is designed.

The general maximum driveway widths, which Planning confirms for each property, are 6.0 m for a single-detached house, 5.2 m for a semi and 3.0 m for a townhouse. The extra space has to fit inside that width, so on a semi or townhouse lot the driveway is the first thing we measure.

Newmarket tree bylaw: the 20 cm trunk rule

A private tree in Newmarket comes under the by-law once its trunk diameter, taken 1.4 metres above the ground, reaches 20 centimetres. Removing one takes a Town permit supported by an arborist report. Building projects can face a second requirement: a deposit to protect the other trees on the property while construction is under way.

An addition, garden suite or new garage placed near a large tree can therefore pick up a tree permit, an arborist’s visit and a deposit before the first footing is dug. Plotting the trees on the survey during the zoning check lets the footprint move before any of that is committed.

Newmarket’s Development Portal, from upload to inspections

Every permit application in Newmarket goes in through the Town’s online Development Portal, with all of its documents, and that is where it is tracked until the permit is issued. The upload is ours, and because the drawings carry our BCIN and P.Eng credentials, the examiner’s questions come back to the people who drew and engineered them.

After issue, the inspections listed on the permit are booked as each stage is ready, finishing with the final. On a new basement apartment or garden suite, that final inspection report does a second job: the Town asks for it, together with Electrical Safety Authority compliance reports for both the upper and lower units, before it will register the unit.

The Newmarket townhouse that became a duplex

Cristian Chan left us a Google review after we converted his townhouse in Newmarket into a duplex. On the same job we prepared the permit drawings for taking down walls to open up the living room. He also mentions Alex explaining the zoning bylaws, and how construction would run, as the renovation went along.

Contact us

One team. One process. By experts.

Tell us what you’re planning and we’ll map the path from idea to permit to construction.

First consultation free(416) 990-9179