Before anything is drawn
Zoning & setback review
Setbacks, height, coverage, lot area, servicing and protected trees, tested against the by-law for what will fit.
- By-law & setback check
- Height & angular plane
- Tree & landscaping rules
- Servicing route
Garden Suites · Newmarket, York Region
A garden suite in Newmarket puts a second home in your back yard, for family or for a tenant. We design and engineer it, take it through the Town’s permit and build it, and our Director, a real estate broker, can tell you what the suite adds to the property’s value.

What’s included
A garden suite is a small new house with all of a house’s rules, on a lot that already has one. The zoning check comes first, because it decides whether there is a suite at all. In Newmarket the package goes to the Town of Newmarket Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Everything else depends on step one of the four, which asks whether the lot can host a suite at all.
Lot measurements and the by-law decide how large a suite fits, or that none does, and you hear it before design spending starts.
One office draws the site, plans, structure and mechanical, files with the city and answers until the permit is granted.
Our crew does excavation, foundation, framing, rough-ins, the exterior and finishes, each stage inspected.
Water, sewer and electrical connected, the final inspection passed, and the unit ready to rent or move into.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179There is no set figure, because the price follows the suite. Size, one storey or two, and the finishes come first, followed by the service run from the house and how easily machines can get into the yard. We price each suite from a written scope after the zoning check, so you know whether the lot can take a suite before you spend on design.
It is a separate, self-contained dwelling built in the back yard of a house, with its own kitchen, bathroom and front door. The Town of Newmarket calls it a Detached Additional Residential Unit. People build them to house family or to rent out, and under Ontario’s rules the occupant does not have to be related to you.
The lot sets the pace more than the suite does. A driveway that needs reworking for the unit’s parking space, a regulated tree in the footprint that needs a removal permit and an arborist report, or a setback that needs the Committee of Adjustment can each add a step before the permit. After those come the Town’s review, the build with its inspections, and registration. You get a dated schedule once we know which of those your lot needs.
Before: a building permit, since the Town lists any detached structure over 15 square metres as permit work, and a suite is well past that size, plus a variance or a tree permit if the lot calls for one. During: an electrical permit from the Electrical Safety Authority for the wiring. After the final inspection, the unit is registered with the Town.
Newmarket’s zoning for a detached unit on your lot decides it, and a second storey that runs past the height allowed can still go to the Committee of Adjustment for a variance before the permit. On a lot in the Oak Ridges Moraine area the Town refers zoning questions to its Planning Department, so that is where we get the height before an upper floor is sketched.
From wherever the Town’s servicing standards for water and sewer allow, since Newmarket applies them to every detached unit, and they can shape the suite as much as the zoning does. Where the line can run, and how much the house’s existing service can carry, help decide how large the suite is and where in the yard it sits. So we check the servicing route before the layout rather than after it.
First check which figure you are missing. The setback comes from By-law 2010-40 or, for an Urban Centres lot, 2019-06, and provincial rules now trim the written minimum on most urban residential land, so a near miss may already pass. If it still falls short, there are two routes: shrink or shift the suite until it fits, or ask the Committee of Adjustment for a variance, which has to be granted before the Town can issue the permit.
Newmarket protects private trees 20 cm or more in diameter at breast height (1.4 m). Removing one takes a permit and an arborist report, and the Town may also ask for a deposit to protect the remaining trees during construction. We plot the trees from the survey and move the suite around them where the yard allows.
Usually, and on a Newmarket lot it has to show more than the lot lines. The driveway’s width matters, because the suite’s parking space must fit inside the Town’s maximum; so do the trees, since any trunk of 20 cm or more at breast height is regulated; and near the East Holland River or in the Moraine area, the survey shows how close the suite comes to land with conservation or Moraine limits. If yours predates the current driveway or outbuildings, we list what the surveyor should add.
In Newmarket’s terms it would be the same kind of unit as a garden suite: a Detached Additional Residential Unit, a separate self-contained home on the house’s lot, held to the same zoning, Building Code and water and sewer servicing standards. Facing a lane doesn’t move the parking either, since the unit’s outdoor space still has to sit within the permitted driveway width, perpendicular to the street.
Searched & answered
Short answers to the garden suites questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationNewmarket’s rules use neither name. Whichever one you say, the Town treats the building as a detached additional residential unit and registers it after the final inspection. The Planning Act keeps the term garden suite for a temporary, portable unit, a different thing from the permanent suites drawn today.
A Newmarket lot with a lane behind it could, and the unit would count as a detached additional residential unit, like a garden suite. A laneway suite faces the lane instead of the street, but its parking space still goes on the driveway, perpendicular to the street.
Yes, in principle: the Planning Act allows a house, one unit inside it and one in a separate building on a serviced urban lot. In Newmarket each of those extra units needs its own outdoor parking space beyond the house’s two, so the driveway has to hold both.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
Newmarket allows a Detached Additional Residential Unit: a separate, self-contained home on the same lot as the main house. It is subject to the zoning, the Ontario Building Code and the Town’s servicing standards for water and sewer, and together those decide how big the suite can be, where it sits and what the site plan has to show.
The zoning part depends on which by-law covers the lot, the parent By-law 2010-40 or the Urban Centres by-law, 2019-06. Provincial rules sit underneath: a building with a unit has to be at least 4 m from any other residential building on the lot unless the by-law allows less, and buildings can cover up to 45 per cent of the lot.
In Newmarket the driveway is the first cost question, because it can decide whether there is a suite at all. The Town wants one outdoor parking space for the unit on top of the house’s two, perpendicular to the street and inside the maximum driveway width, generally 6.0 m for a detached house and 5.2 m for a semi. If the driveway can’t take that third space, the parking gets solved before any design starts, or the suite goes no further.
After that, the suite’s size, one storey or two, and its finishes set most of the price. Below it, Newmarket’s ground is deep glacial sand and gravel with no bedrock showing, so the footings are designed for granular soil, and the water, sewer and power lines across the yard are priced from their actual route.
Newmarket’s finish line is registration, not the final inspection. To register the suite, the Town wants the final building inspection report and Electrical Safety Authority compliance reports for both units, the house’s as well as the suite’s, so any electrical work the main house needs belongs on the schedule too. We date the plan to that point once the zoning check shows what the lot needs first.
Contact us
Free first call: give us the address and we check access, trees and setbacks.
First consultation free(416) 990-9179