Commercial Permits · Newmarket, York Region

Commercial Building Permits in Newmarket

Commercial building permits in Newmarket, starting with whether the zoning allows your use: we then draw the change of use, alteration or tenant fit-out with the designer’s credentials and signature on every sheet, add the fire and life-safety layouts, and file the set with the Town.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lot
Reviewed for
Zoning + Ontario Building Code
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
From our office
About 30 minutes
Fig. 01 · Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lotRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

A commercial project is judged on its code analysis first and its drawings second. Our opening steps settle the occupancy class, the zoning and the exit and fire needs, so the layout you choose is one the city approves. Newmarket packages are filed with the Town of Newmarket Building Division. We draw them to that department’s checklist.

  • Commercial office fit-out with glass partitions

    Fit-outs & new builds

    Commercial building permits

    The Ontario Building Code wants commercial plans signed by a credentialed designer. Ours are, and we draw them to scale for new builds, alterations and tenant fit-outs.

    • Tenant fit-outs & alterations
    • New commercial construction
    • Interior & exterior alterations
    • BCIN & P.Eng credentials on every sheet
  • Restaurant interior after a change of use

    New occupancy

    Change of use

    A residential unit that becomes a shop, an office that becomes a restaurant, a clinic that becomes a supermarket: any change in a building’s purpose requires it, built or not.

    • Occupancy classification review
    • Fire separations & exits
    • Plumbing, HVAC & sprinkler upgrades
    • Zoning confirmation
  • Restaurant storefront on a commercial street

    Opening the doors

    Business licences

    The approvals a new business needs beyond the building permit, worked out before the lease is signed so nothing surprises you at opening.

    • Zoning & minor variances
    • Sign permits
    • Fire & health inspections
    • Liquor licence drawings
  • Fire safety inspection in a commercial unit

    Occupant safety

    Fire & life-safety upgrades

    Drawn alongside the permit package, layouts for the fire alarm, sprinklers, exit signs and emergency lighting let fire and building officials work from one set.

    • Fire alarm layout
    • Sprinkler design
    • Emergency lighting & exit signs
    • Fire separation details

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Code analysisOccupancy, fire separations, exits, washrooms
  2. Floor plans & elevationsExisting, proposed and ceiling plans
  3. Structural drawingsOpenings, mezzanines, roof-top units
  4. Mechanical & electricalPlumbing too, drawn for the permit
  5. Fire & life safetyAlarm, sprinklers, emergency lighting
  6. Zoning reviewPlus variance drawings if needed
  7. Application & responsesEvery examiner comment answered

How it runs

Process: 4 steps from first call to sign-off.

Your lease sets the timing of the four steps. The code analysis opens them, so you don’t fall for a layout the city would refuse.

  1. Site visit & code analysis

    Unit measurements, a zoning check for your use and an occupancy classification under the Building Code come before any layout drawing, and show what the space needs.

  2. Layout & coordination

    Floor plan, exits, washrooms, kitchen and mechanical rooms are laid out together with your designer’s or franchisor’s standards, so the permit set and the fit-out drawings agree.

  3. Drawings & engineering

    Architectural, structural, mechanical and fire-safety sheets come from one office, stamped by our P.Eng and BCIN designers.

  4. Submission & approvals

    We file the building permit and support the sign permit, fire inspection and licence applications that follow, answering city comments at no extra charge.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Unit address and landlord base-building drawings
  • The space’s past use and what you plan
  • Your lease start date and any landlord deadlines
  • Franchise or brand design standards
  • Equipment lists for kitchens, clinics or workshops
  • Any city notices or orders on the unit

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: commercial permits in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Two things: how many disciplines the drawings need, and how far the new use sits from the last one. A shop taking over another shop is light work. Turning an office into a restaurant adds an exhaust design, new plumbing, upgraded fire separations and possibly sprinklers. On the Yonge or Davis corridors, planning review under the Urban Centres rules can put an approval step ahead of the permit. The Town bills its own fee, and our quote follows a free visit to the unit.

  • Ontario’s Building Code gives each type of building its own review period, counted from a complete application: 10 business days for a house, 30 for a complex building like a hospital, with most commercial work in between. Newmarket adds time in particular places. A storefront in Lower Main Street South, the only heritage conservation district in town, or a designated building needs heritage review for exterior work alongside the permit. We do not promise an issue date, and we file only once the set is complete.

  • Any alteration to the building needs one: new walls, washrooms, plumbing, ductwork or exits. So does a new use the Building Code rates as more hazardous, even with no construction at all, under section 10 of the Building Code Act. One of our own projects, a dental office turned into a supermarket, needed that kind of permit.

  • Yes, the Building Code places a restaurant in a different occupancy, so it needs a permit before the fit-out. Two Newmarket checks come first. The zoning has to list a restaurant for the unit under whichever by-law governs it, 2010-40 or the Urban Centres by-law 2019-06. And on Lower Main Street South, the Town’s heritage conservation district, plan the kitchen exhaust early: its outlet can change the outside of the building, and exterior work there goes through heritage review alongside the permit.

  • Sprinklers are one of the upgrades a change of use can bring, along with fire separations, plumbing, HVAC and structural work. Which of them your unit takes is a Building Code question about the new occupancy and the building it sits in. If sprinklers are on the list, we design the system and it goes into the permit set with the alarm and exit layouts.

  • On our sets, Alexander Cardenas Fernandez’s. His P.Eng seal goes on the engineered sheets, and his BCIN registration, held in Small Buildings, Structural and HVAC, covers the design, since the Building Code wants the designer’s credentials and signature on commercial plans. If the Architects Act reserves your building for an architect, we bring one in.

  • Yes, for any part of the refit that alters the building; keeping the use doesn’t exempt it. Ontario’s Building Code Act counts a material alteration as construction, so a new wall, washroom or exit is permit work and fresh paint isn’t.

  • Yes. An AGCO liquor licence application generally needs a floor plan of the licensed area showing its occupant load, and a sign permit needs a dimensioned elevation of the sign on the building. We draw both from the permit set so the numbers match. Which licences your business needs depends on what it does, and we check that for the address before you sign a lease.

  • Yes. Newmarket decides variances from its zoning by-law through the Committee of Adjustment, and the building permit for your unit waits until one is granted, so that application goes first. We check the plans against whichever by-law governs the unit, 2010-40 or the Urban Centres by-law 2019-06, prepare the drawings the Committee needs from the same layout as the permit set, and deal with the Town until the decision.

  • Typically a fire alarm layout, emergency lighting and exit signs, plus sprinklers where the occupancy or the building calls for them. Under the Ontario Fire Code the owner is responsible for fire safety in an existing building and the fire department enforces it, so we draw the life-safety layouts into the permit set and both departments work from one drawing. Upgraded fire separations were part of our dental-office-to-supermarket conversion.

Searched & answered

People Also Ask: what Newmarket searches about commercial permits.

Short answers to the commercial permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Putting a building or unit to a new purpose that the Building Code treats as more hazardous than the old one. It needs a permit even with no construction, and the zoning has to allow the new use too.

  • No, and neither can make a use legal that the zoning does not allow. On the Yonge Street and Davis Drive corridors that question is answered under the Urban Centres zoning, so we settle it before either application. The permit then covers the construction or change of use; any licence the business needs is a separate permission to operate, and we draw its plans from the permit set.

  • It is the number of people the Building Code expects a space to hold, worked out from its floor area and its use. Turning a Newmarket office into a restaurant raises it sharply, and the exits and washrooms in the permit set are sized to the new number.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

What a commercial building permit in Newmarket covers

Before any layout is drawn, we confirm the use is allowed at the address, and in Newmarket that depends on which by-law the unit sits under: By-law 2010-40, the Town’s parent zoning by-law, or the Urban Centres by-law, number 2019-06. If the governing by-law does not list your use, a planning approval such as a Committee of Adjustment variance comes first, and only then the building permit.

The package starts with a code analysis of the occupancy, fire separations, exits and washrooms. Then come existing and proposed floor plans, structural drawings for any new opening, mezzanine or rooftop unit, the mechanical, plumbing and electrical sheets, and the fire alarm, sprinkler and emergency lighting layouts. Every sheet carries the credentials and signature the Ontario Building Code requires on commercial plans.

Commercial permits on Newmarket’s Yonge and Davis corridors

Newmarket’s Urban Centres Secondary Plan sends most of the growth in the Yonge and Davis urban growth centre to redevelopment along Davis Drive and Yonge Street. A business on either corridor is reviewed under that plan and the Urban Centres zoning, which can change the uses allowed, the built form and the approvals needed before a permit. We read both before you sign a lease there.

From upload to sign permit: a Newmarket commercial file

The application and all of its documents go to the Town through its online Development Portal, and the file is tracked there until it is issued. We put the set in, follow its progress and answer every examiner comment at no extra charge. We also support the sign permit, fire inspection and licence applications that follow, working from the same drawings so they match what the Town approved.

Contact us

Lease signed. Layout drawn. Permit filed.

Tell us the address and the use, and we’ll tell you what the city will ask for, on a free first call.

First consultation free(416) 990-9179