Legal basement apartments in Newmarket built by the team that designs them: separate entrance, fire separation, exits and heating drawn in-house, the Town’s permit filed, and each inspection booked as its stage is ready.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them. We draw Newmarket packages to the checklist of the Town of Newmarket Building Division, the office that receives them.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
A bare basement gets to a closed permit in four steps, and the inspections are on the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
One office draws the layout, separations, structural opening and HVAC and files them with the municipality. Answering city comments costs nothing extra.
Inspected stage by stage: entrance and framing, rough-ins, insulation, then rated assemblies.
Last come kitchen, bathroom, floors, doors, then final inspection and permit closure.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179We price it after the site visit, and in Newmarket part of the price can sit upstairs. Postwar houses near the core often need work on the structure, wiring or heating before a unit can go in. And because registration needs an Electrical Safety Authority compliance report for the upper unit as well as the basement, faults in the main house’s wiring can end up in the budget too. Design and permit fees are listed apart from construction, and the first consultation is free.
It is a basement apartment that passes both the Building Code and the zoning: a self-contained second home with its own kitchen and bathroom, which Ontario’s planning rules call an additional residential unit. Newmarket adds one more condition, because every such unit must be registered with the Town. A registered unit is marked by a small N plate for the house and the letter B in its address.
The Town reviews the permit, and then the build moves stage by stage, each one inspected before the next. A basement that already has the height and a usable exit moves faster than one that needs underpinning and a new door through the foundation. In Newmarket the finish line is registration rather than the last inspection: the Town needs the final building inspection report and an ESA compliance report covering the upper and the lower unit before it registers the basement apartment. We give a schedule with the quote.
A building permit from the Town before any work starts, covering the layout, fire separations, exits, alarms, structure and heating, including any new entrance cut through the foundation. The wiring needs a separate electrical permit, and the Electrical Safety Authority inspects that work. Registration with the Town follows the final inspection.
An additional unit is a separate home: its own kitchen, bathroom and way out, divided from the main house by a fire separation, with interconnected alarms. A finished basement used by the same household is extra living space, not a unit. In Newmarket both need a building permit, since finishing a basement is on the Town’s list, but only the unit has to meet the second-dwelling rules and be registered.
Often, yes: Ontario’s Planning Act bars a zoning by-law from ruling out three units in total on a serviced urban residential lot. The details come from whichever Newmarket by-law governs your address: By-law 2010-40, the parent zoning by-law, or, in the Urban Centres, By-law 2019-06. If the lot is in the Oak Ridges Moraine area, its zoning comes from the Town’s Planning Department, and we make that call before anything is designed.
One, in addition to the two the house itself needs. It has to be outdoors, not in a garage, within the driveway width the Town permits and perpendicular to the street. That width is generally capped at 6.0 m on a single-detached lot, 5.2 m on a semi and 3.0 m on a townhouse, subject to confirmation by Planning, so a narrow lot can fail on parking alone.
Measure it properly before deciding. The code wants 1.95 m but accepts 1.85 m under beams and ducts, so a basement that feels low can pass once a duct is rerouted or boxed in tightly. If the clear height is genuinely short, the floor has to go down, with new footings designed by our P.Eng and drawn on the same permit set as the unit. In a postwar Newmarket house near the core, that work is planned together with any other structural upgrades the conversion needs.
It can, and on a Newmarket lot the harder question is where. The unit’s extra parking space has to sit outdoors, inside the Town’s maximum driveway width, so a stairwell dug on the driveway side can take the room that parking needs. We place the parking first and the entrance second, and the opening goes on the permit drawings with its structural details.
It can share it or have its own, and in Newmarket the choice reaches the electrical panel. Separate electric heat for the basement adds load to a service that, in a postwar house near the core, may already need upgrading, so our mechanical designer runs the electrical load alongside the heat loss before you choose. The permit set then shows whichever system you pick, with each household’s heating drawn.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationNot always. Where the house has stood for five years or more, the code accepts an exterior door used only by the suite, a shared exit behind a 30-minute fire separation, or a route through the other unit plus an escape window. Where a new door goes, front, side or rear, is checked against the zoning and the grade before it is drawn.
Floor plans of the basement as it is and as proposed, with the fire separations, exits, alarms, the structure for any new opening and the heating layout. A BCIN designer, an architect or an engineer prepares them unless the owner can; ours carry BCIN and P.Eng credentials. We upload them to the Town’s online Development Portal.
The Building Code’s rules for a second unit apply here as anywhere in Ontario, covering height, fire separation, alarms and a way out. A Newmarket house adds local ones: a third outdoor parking space inside the permitted driveway width, and registration with the Town, which needs the final inspection report and an ESA compliance report for both units.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Good to know
Legal comes down to code items an inspector can tick off: enough ceiling height, fire-rated separation between the two homes, smoke alarms wired to sound together, carbon monoxide alarms where the code calls for them, and a safe way out. The unit is drawn to that list, built on a building permit, and passes its final inspection before anyone moves in.
We cover the whole path: measuring the basement, checking the zoning, drawing the layout, separations, structure and heating, filing the permit and building the unit. Fine Engineering’s engineer designs any new opening in the foundation wall, and our mechanical designer draws the heating for both households.
Newmarket puts finishing a basement on its permit list, which makes a basement apartment a permit job from the first stud. The permit then carries everything that makes it a second unit: the fire separation, the exits, the alarms, any new entrance and the plumbing for a second kitchen and bathroom.
Ontario’s Planning Act already allows a second unit in principle on a serviced urban lot. What decides a Newmarket basement is practical: whether the lot can take the parking the Town requires, and whether the basement can be brought up to the code.
Postwar houses from Newmarket’s 1950s suburban boom, close to the core, often need work on the structure, the wiring and the mechanical systems before a basement can become a unit. So the checklist starts with the house: the ceiling height from floor to joist, the windows that could serve as escape routes, where an entrance could go, the drains and the electrical panel.
The code sets the numbers we measure against: a 1.95 m minimum ceiling, dropping to 1.85 m beneath beams and ducts, and escape windows that open without tools to at least 0.38 m², with no side under 460 mm. A basement that falls short on height is usually lowered by underpinning, which our P.Eng designs.
The driveway is measured before anything is priced. Newmarket wants an outdoor parking space for the unit on top of the house’s two, laid perpendicular to the street and inside the permitted driveway width, and a garage space doesn’t count. If the driveway can’t take it, the unit stops there, however good the basement is.
Inside the house, the price follows the work the basement needs: lowering the floor, an entrance cut through the foundation, a fire-rated ceiling, a larger window and well, or a bigger electrical service.
Cristian Chan’s Google review is about a Newmarket townhouse we turned into a duplex. The same renovation removed walls for an open-concept living room, with permit drawings from us, and he writes that Alex took him through the zoning bylaws and how construction would go while the work was under way.
A basement apartment that is already there but was never registered can still be registered, and its age decides the paperwork. For a unit built after 1995, the Town asks for a final building inspection report. One built before 1995 needs a letter from Central York Fire Services confirming it complies with the Fire Code. Either way the Town wants an Electrical Safety Authority compliance report covering both the upper and lower units.
The ESA report for a newer unit, and the Fire Services letter for an older one, must be dated within six months of the application. If a newer unit was built without a permit, getting that final inspection report means drawing what exists, correcting what falls short and taking it through inspection, which we prepare and coordinate.