Legal Basements · Aurora, York Region

Legal Basement Apartments in Aurora

Legal basement apartments in Aurora, for owners who want to rent out the lower floor. One office measures the basement, draws and engineers the unit and files the permit, then we build it through to final inspection.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Walk-down stair with galvanized railings to a navy basement door, and an enlarged window in a concrete well beyond
Recent project
Vaughan · 1,100 sq ft
Municipality
Aurora, York Region
Permit office
Town of Aurora Building Division
From our office
About 30 minutes
Fig. 01 · Walk-down stair with galvanized railings to a navy basement door, and an enlarged window in a concrete well beyondRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

A unit is legal once it meets its list of code items, each checked by the inspector. We design and build to that list, and we schedule inspections in the city’s order. We draw Aurora packages to the checklist of the Town of Aurora Building Division, the office that receives them.

  • Finished legal basement apartment in Vaughan

    The way in

    Separate entrance

    A door to the outside is cut into the foundation, and its stairwell, guard and drainage are designed so the wall keeps its strength.

    • Foundation opening design
    • Stairwell & drainage
    • Guards & lighting
    • Frost & waterproofing
  • Basement conversion with exposed steel beams

    What the inspector checks first

    Fire separation & egress

    A bedroom window or door big enough to exit through, rated ceilings and walls dividing the units, and interconnected smoke alarms.

    • Fire-rated assemblies
    • Egress windows
    • Interconnected alarms
    • Sound separation
  • Kitchenette in a legal basement unit

    The wet side

    Kitchen & bathroom

    The second kitchen and bath get plumbed into drains never designed for them, and the venting and hot water are sized for two units.

    • Kitchen & bath layouts
    • Drain & vent tie-ins
    • Hot water for two units
    • Bathroom ventilation
  • Basement suite with a kitchenette and a living area

    Through to occupancy

    Inspection scheduling

    When a stage is ready we book the inspection the permit calls for, then close the file at the end, so on paper the unit is legal too.

    • Framing & insulation inspections
    • Plumbing & electrical inspections
    • HVAC & final
    • Permit close-out

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

06 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Site visitHeight, egress and entrance checked
  2. Permit drawingsLayout, fire separations, structure, HVAC
  3. Building permitFiled and followed to issue
  4. Entrance & fire assembliesFramed, insulated and fire-rated
  5. Plumbing, electrical, HVACInstalled and inspected
  6. Kitchen & bathroomAnd the finishes
  7. A legal unitPermit closed, ready to list and insure

How it runs

Process: 4 steps from first call to sign-off.

Four steps from a bare basement to a closed permit, with the inspections built into the schedule.

  1. Site visit & code check

    A visit lets us measure the ceiling and look at the entrance options, windows and mechanical room. You hear whether legalization is possible and what it would take.

  2. Design & permit

    The municipality receives drawings from one office: HVAC, structural opening, separations and layout. City comments are answered without charging extra.

  3. Build

    Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.

  4. Finish & close out

    Last come kitchen, bathroom, floors, doors, then final inspection and permit closure.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address
  • Basement ceiling height, measured floor to joist
  • Photos of basement, furnace room, entrance wall
  • Any existing drawings or a previous permit
  • Whether it is for family or rent

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: legal basements in Aurora, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • A self-contained second unit in the basement, with its own kitchen and bathroom, that meets the Building Code and the zoning and has passed its final inspection. In Aurora it is one of the additional residential units that By-law 6660-24 counts toward the three-unit limit.

  • In Aurora the entrance can decide a large part of the price. By-law 6660-24 wants a clear path at least 1.2 m wide from the unit's door to a street, driveway or parking area, so if the existing side or rear door can't keep that width past fences and steps, a new opening goes through another wall, with its own structural design. Underpinning, where headroom is short, is the other large item. We price it after a free first visit.

  • Drawings and the Town's review come first, then construction in stages around the inspections. Height already at code and a workable entrance keep it short; underpinning and a new door through the foundation lengthen it. In Aurora the building permit is not the last step either: each additional unit is registered with the Town separately, with any plans the Registrar asks for.

  • A building permit from the Town for the unit itself, covering the layout, separations, entrance, structure and heating. The new wiring goes through the Electrical Safety Authority, which issues its own permit and inspects. Registration of the unit with the Town follows, as an application of its own.

  • Yes, as long as the lot has no unit in the yard. By-law 6660-24 allows an Aurora house two integrated units only where there is no ancillary unit, so a second unit indoors also rules out a backyard one later. The basement unit is then registered with the Town as a separate application from the first.

  • Yes, on a wall where the door can keep a clear path at least 1.2 m wide to a street, driveway or parking area, which Aurora's by-law requires of every unit entrance. We check the side and rear yards against that before any structural design starts. Then our P.Eng designs the opening so the foundation still carries the house.

  • That depends on what the existing system can carry. With a second unit, our mechanical designer runs a heat loss for each unit and checks whether the furnace and ducts already in the house can take the added load. The answer, shared equipment or new equipment for the unit, goes on the permit drawings with the heating for both.

  • Usually. It goes in as a new application: drawings of what exists and what has to change, then inspections that may mean opening walls or ceilings. Once it passes, the unit is registered with the Town like any other added unit. We prepare the drawings and coordinate the corrective work.

  • Yes. A legal second unit can be rented once it has passed its final inspection, and the person living there does not have to be related to you. In Aurora, finish the unit's registration with the Town as well, because the by-law requires it for every added unit.

  • With rated assemblies between the units, in the ceiling between them and any wall they share. In a house at least five years old, the Code's renovation rules accept a 30-minute separation, or 15 minutes for the floor between units where interconnected smoke alarms are in every unit and common area. Sound separation is designed into the same assemblies.

Searched & answered

People Also Ask: what Aurora searches about legal basements.

Short answers to the legal basements questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Headroom first: 1.95 m, or 1.85 m beneath beams and ducts. Then a fire separation from the main house, smoke alarms that set each other off, carbon monoxide alarms where the Code calls for them, and a safe way out. Aurora's zoning and its registration by-law sit on top of those.

  • The Code's renovation rules give three options in a house at least five years old. The unit can have its own exterior door, share an exit protected by a 30-minute fire separation, or exit through the other unit with an added escape window. An exterior door in Aurora also needs its clear path out to the street, driveway or parking.

  • Yes. The alarms have to be linked, by wire or wirelessly, so one going off sets off the rest, and shared spaces outside the units need them too. Carbon monoxide alarms are needed as well where the unit has a fuel-burning appliance or takes heated air from one.

  • At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.

  • It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.

  • Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.

Good to know

Legal basement apartments in Aurora, start to finish

A legal unit meets the Building Code and the zoning, and it has passed final inspection. The Code items come from the province: headroom has to reach 1.95 m, easing to 1.85 m beneath beams and ducts, and the unit needs a fire separation from the floor above, smoke alarms tied together and a safe way out.

We measure against that list at the first visit, then draw the layout, the separations, the entrance and the heating for both units in one office, file the permit, build the unit and call for each inspection when its stage is done.

Basement apartment math under Aurora's three-unit cap

Under Aurora's ARU Registration By-law 6660-24, a residential parcel tops out at three units with the principal house counted as one. A basement apartment sits inside the house as an integrated unit, so a lot can hold the house plus two such units, or the house, one integrated unit and one ancillary unit out in the yard.

That makes the order of projects matter. If a garden suite might come later, the basement apartment is planned knowing it uses one of the lot's two remaining units.

A clear path from an Aurora basement entrance

By-law 6660-24 also requires a clear path at least 1.2 m wide from every unit's entrance out to a street, driveway or parking area, and nothing may encroach on that path.

For a side or rear basement entrance, that path often decides the design. The stairwell, its guard, steps or a fence can pinch it, so we place the door where the full width carries through to the driveway.

Contact us

Entrance cut. Separation rated. Permit closed.

Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.

First consultation free(416) 990-9179