
The floor outside
Decks & railings
Pressure-treated and composite decks with guards that meet the code’s height and load rules.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches · Aurora, York Region
Deck builder in Aurora with engineering in-house: decks, covered porches and rear canopies on footings and framing we size ourselves, a permit set drawn and filed when the height calls for one, and our own crew on the build.

What’s included
Outdoor structures fail at the ground and at the house: footings that heave and ledgers that rot. We design both properly, then build what we drew. Aurora packages are filed with the Town of Aurora Building Division. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the footing inspection setting the pace.
Our visit covers the wall the structure attaches to, the grade, how materials get in and what you want the space for.
Permit drawings come with in-house structural sizing. Filing them and answering the city costs nothing extra.
Locates come first, then footings and framing, each inspected, then decking or roof, stairs and guards.
Railings, lighting and finishes, the final inspection, and the permit closed.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Only once the deck is 2 feet or more above finished grade. Aurora lets a lower deck go ahead without one, though it still has to meet zoning. On a sloping yard the height changes from one side to the other, so we measure it at the site visit before anyone assumes the deck is exempt.
On an Aurora lot zoned ORM, the roofline starts as a size limit. An open-sided roofed porch counts there as a minor addition, held to 25% of the house's ground floor area and no more than 50 sq. m on that floor, so its footprint is fixed against those caps before the roof is shaped. Where the new roof meets the house, our P.Eng checks the wall it will bear on. At its outer edge it rests on posts, and the piers under them are inspected open before backfilling, so their size is set by the roof above them and not by the deck alone.
Height comes first in Aurora. Below 2 feet above finished grade there is no permit set to draw and no inspection to book; above it, the plotted site plan, the construction drawings and the Town's two inspections are part of the job. A regulated tree where the piers would go adds a tree permit, or a layout moved clear of its roots. Size, a roof, the decking and railing you choose and the footings set the rest. The Town's permit fee sits on a line of its own, and we price the deck in a written scope after the first visit.
For a deck that needs a permit, the Town's review comes first. The build then runs around Aurora's footing inspection, which happens with the pier holes open and before backfilling, so footings are dug, inspected and only then filled. Size and whether the deck has a roof decide the rest of the schedule, which we give you with the quote.
Because the parts most likely to go wrong end up buried or covered once the deck is built. Footings that are too shallow heave, a ledger that is not flashed lets water into the house, and guards that are too low fail inspection. We design those details, draw them for the permit and build to the drawings.
The structure under them is the same, so the choice comes down to upkeep and budget. Pressure-treated wood is cheaper at the start and wants staining and sealing every so often; composite costs more up front and skips that maintenance. Both can be priced side by side in the written scope.
Yes. The posts, beams and footings are designed for the roof and its snow load as well as the floor, and the roof is tied into the house. A 570 sq ft porch addition and a 12 by 12 foot rear canopy are two examples on our project list.
In most cases. A ledger bolted into the house framing is the usual connection, but brick veneer and a cantilevered floor each need a different detail, and some decks are better on their own beam beside the wall. We design the connection after seeing the wall.
Possibly the permits, and possibly where the piers sit. Under Aurora's Private Tree Protection By-law, a building permit application does not cover a regulated tree: if digging a pier hole would injure or remove one, that needs a separate tree permit. The other route is to keep the piers out of the root zone and let a beam carry the deck across it. We choose between the two once we have seen the tree and where the deck has to land.
Yes, once the deck surface sits more than 600 mm above the ground within 1.2 m of its edge. From that height the 2024 Building Code wants a guard along every open side, at least 900 mm tall for a house, and 1,070 mm tall where the deck stands more than 1.8 m up. We draw and build guards to those figures.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationPosts, beams and footings sized for the roof and its snow load as well as the floor. It also needs a tie-in to the house that the existing wall and roof framing can carry.
One who designs the footings and framing before building, knows the Town's 2-foot permit line and handles the permit when it applies, and books the footing inspection before backfilling. Ask to see the drawings the deck will be built from.
As part of the deck, on the same drawings, with the stair framed and fastened to the deck structure. Where the yard slopes, its height is taken from the finished grade at the foot of the stair, which we measure at the site visit.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
An Aurora deck job begins with a reading of the yard. We measure how high the finished deck will stand above grade, note any regulated tree near where the piers would go, and check whether the lot is zoned ORM or the house is a heritage property. Those answers decide whether a permit set is drawn and where the footings can sit, and only then do we design the framing in our office.
Then come the permit drawings, and then our own crew on the footings, framing, decking, guards and stairs, with the permit closed at the end. Covered porches and rear canopies follow the same order, with the roof added to the loads.
A deck low enough to skip the permit still has to meet zoning, and two Aurora rules can matter more than height. On an ORM-zoned lot the zone allows uncovered decks and patios on an existing residential lot, but a roofed porch counts as a minor addition and has to fit the zone's caps on size.
If the house is designated or sits in a Heritage Conservation District, a porch or deck that needs a building permit needs its heritage permit first, and a front porch the street can see is reviewed for how it changes the elevation.
Above the 2-foot line the Town wants a site plan with the deck plotted against the property lines, plus construction drawings: framing in plan, an elevation, and a section through the ledger and piers. Ours carry the post, beam and pier sizes and the guard details, so the examiner and the crew read the same sheets.
Two Town inspections follow: one with the pier holes dug, before they are backfilled, and one when the deck is complete. We schedule the first so the footings are seen open, which means they are never poured and buried in a single day.
Contact us
Send photos of the yard and the house wall for a free first call on what the permit needs.
First consultation free(416) 990-9179