The floor outside
Decks & railings
Pressure-treated and composite decks with guards that meet the code’s height and load rules.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches · Toronto
Deck builder for Toronto homes: decks, railings, covered porches and rear canopies on footings sized for the load, drawn and permitted by our own engineer and built by the same team.

What’s included
Footings heave in soil and ledgers rot at the house: that is where outdoor structures go wrong. We design both correctly and build what we drew. Toronto packages are filed with Toronto Building. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
In four steps, the pace follows the footing inspection.
We look at the grade, the wall the structure will attach to, the access for materials and how you want to use the space.
The structure is sized in-house and the drawings go to the city for the permit, with answers at no extra charge.
Locates come first, then footings and framing, each inspected, then decking or roof, stairs and guards.
Lighting, railings and finishes, then final inspection and permit closure.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Only above a certain height. Toronto asks for one once the deck stands more than 60 cm (24 in.) above the ground. Below that you can skip the permit but not the Zoning By-law, which still governs how close the deck comes to the lot lines and how much of the lot it covers.
The new roof is framed off the house on its own beam, posts and footings and tied into the existing roof so water runs off cleanly. Our engineer sizes those members, and the drawings go in for the permit. On a front porch in a Heritage Conservation District, extending the roofline is street-visible work, so it needs both a heritage permit and the building permit; a covered deck at the back, out of public view, does not.
It depends on the height, the size, the materials and the footings, so we quote from a design after a free first consultation. Height counts twice in Toronto: above 60 cm the deck needs permit drawings, and a raised deck needs taller posts, bracing and guards. A lot backing onto a ravine can add a permit for work in the protected area.
A low deck with no permit is mostly build time. A raised one adds the drawings and the City’s review before work starts. If a footing lands near a street tree, or a private tree 30 cm or more across, the tree permit comes before any digging, and a ravine lot adds its own permit ahead of the work. We give you the sequence with the quote.
Ours include a framing plan whose schedule sizes every post, beam and pier, down to the joist hangers; an elevation that sets the posts, bracing and piers against the existing house and the ground line; and a section with every connection called out. Together they show the examiner how the load gets from the decking to the ground.
Find out who designs the footings and framing, who draws the permit set for a raised deck, and whether anyone checks the lot for protected trees and ravine limits before the price is given. If one office can answer all three, you aren’t left coordinating a designer, an engineer and a crew yourself.
Yes. Front porches, covered porches and rear canopies are designed with footings and framing for the load, including the roof they carry, then permitted and built by the same team that drew them.
That comes down to the look, the budget and how much upkeep you want. The structure underneath is the same engineering question whichever decking you pick, and we design the framing and footings to suit it.
On a deck more than 60 cm up, the old footings go on the permit drawings just as new ones would, so we measure their size and depth, look at their condition and check them against the loads of the new design. Any that fall short are replaced. A low deck gets the same check, without the permit.
In Toronto the two numbers match: the City’s permit starts once a deck is more than 60 cm above ground, and the Building Code wants a guard on each open side once the deck surface is more than 600 mm above the ground beside it. So a deck high enough to need a guard usually needs a permit too, and the guard is drawn on the set: at least 900 mm tall on a house, or 1,070 mm where the deck is over 1.8 m high.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationLook at what holds it up: footings, posts, beams and the connection to the house. A deck that moves, posts that lean or a ledger pulling away are reasons to have it assessed, and our engineer can inspect it and say what needs repair.
Toronto’s permit trigger is a deck more than 60 cm above ground. Whether your change counts as building one, such as raising it or rebuilding the frame, is something we check against the work you plan before anything is ordered.
Ours does. Our engineer draws the footings and framing for the permit, we file it, and the same team builds the deck once the permit is issued.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
We design and build decks, covered porches and rear canopies in Toronto, and the footings and framing are designed before anything is built. Our deck sets carry a framing schedule for every post, beam and pier, show how deep the piers go and how the posts are braced, and detail each connection to the bracket and bolt.
Our engineer draws the deck, we file the permit where Toronto requires one, and our crew builds from those same drawings. If you would rather use a builder of your own, you can hire us for the drawings and the permit alone.
In Toronto a building permit is required to construct a deck more than 60 centimetres (24 inches) above ground. A lower deck doesn’t need one, but it still has to comply with the Zoning By-law, so its setbacks and lot coverage count either way.
For a raised deck, the permit drawings show the footings, the framing, the guards and how the deck connects to the house. We prepare and file them, and the City’s comments come back to us.
Toronto’s Ravine and Natural Feature Protection By-law covers ravines, forests, parks, golf courses and other identified natural features. On a lot backing onto one, tree work or grading in the protected area needs its own permit whatever the size of the tree, so the deck’s footings are placed to suit and that permit is lined up before work starts.
Contact us
Send photos of the yard and the house wall for a free first call on what the permit needs.
First consultation free(416) 990-9179