Commercial Permits · Toronto

Commercial Building Permits in Toronto

Commercial building permits in Toronto covering change of use, interior alterations and fit-outs: the use checked against the zoning before the layout is drawn, then plans drawn to scale to the Ontario Building Code with the designer’s credentials on the set.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lot
Reviewed for
Zoning + Ontario Building Code
Municipality
Toronto, Ontario
Permit office
Toronto Building
From our office
About 30 minutes
Fig. 01 · Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lotRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Commercial work is judged on the code analysis before it is judged on the drawings. We classify the occupancy, confirm the zoning and work out the fire and exit requirements first, so the layout you commit to is one the city will approve. The Toronto package is sent to Toronto Building, and the drawings follow its checklist.

  • Commercial office fit-out with glass partitions

    Fit-outs & new builds

    Commercial building permits

    New commercial construction, tenant fit-outs and alterations, drawn to scale and signed by a designer holding the credentials the Ontario Building Code asks of commercial plans.

    • Tenant fit-outs & alterations
    • New commercial construction
    • Interior & exterior alterations
    • BCIN & P.Eng credentials on every sheet
  • Restaurant interior after a change of use

    New occupancy

    Change of use

    Any time a building takes on a new purpose, this is required, construction or not: an office turned restaurant, a clinic turned supermarket, a residential unit turned shop.

    • Occupancy classification review
    • Fire separations & exits
    • Plumbing, HVAC & sprinkler upgrades
    • Zoning confirmation
  • Restaurant storefront on a commercial street

    Opening the doors

    Business licences

    Before you sign the lease, we find the approvals your new business needs past the building permit, so nothing catches you out at opening.

    • Zoning & minor variances
    • Sign permits
    • Fire & health inspections
    • Liquor licence drawings
  • Fire safety inspection in a commercial unit

    Occupant safety

    Fire & life-safety upgrades

    Building and fire departments get a single set, as the sprinkler, fire alarm, exit-sign and emergency lighting plans are worked into the permit package.

    • Fire alarm layout
    • Sprinkler design
    • Emergency lighting & exit signs
    • Fire separation details

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Code analysisOccupancy, fire separations, exits, washrooms
  2. Floor plans & elevationsExisting, proposed and ceiling plans
  3. Structural drawingsOpenings, mezzanines, roof-top units
  4. Mechanical & electricalPlumbing too, drawn for the permit
  5. Fire & life safetyAlarm, sprinklers, emergency lighting
  6. Zoning reviewPlus variance drawings if needed
  7. Application & responsesEvery examiner comment answered

How it runs

Process: 4 steps from first call to sign-off.

Starting with the code analysis means the layout you love is a layout the city will approve. All four steps fit around your lease.

  1. Site visit & code analysis

    Before anyone draws a layout, we find out what the space needs: we measure the unit, check that zoning allows your use and set its occupancy class under the Building Code.

  2. Layout & coordination

    We plan the exits, washrooms, kitchen, mechanical rooms and floor plan as one, to your designer’s or your franchisor’s standards. The fit-out drawings then match the permit set.

  3. Drawings & engineering

    Fire-safety, architectural, mechanical or structural, a sheet is made in one office. Our BCIN designers and P.Eng stamp it.

  4. Submission & approvals

    We support the fire inspection, sign permit and licence applications coming after the building permit we file, with no extra charge for city comments.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Unit address and landlord base-building drawings
  • The space’s past use and what you plan
  • Your lease start date and any landlord deadlines
  • Franchise or brand design standards
  • Equipment lists for kitchens, clinics or workshops
  • Any city notices or orders on the unit

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: commercial permits in Toronto, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • When it is built, altered or put to a new use. New buildings and additions need one, and interior alterations usually do, because Ontario’s Building Code Act counts a material alteration as construction. In Toronto a change of use needs a permit even when nothing is built. Signs, health approval and fire inspections are separate approvals, and we sort out which of them a business needs before drawing starts.

  • There are two parts: the City’s permit fee, and the drawings and engineering behind the application, which is what we quote. Our side grows with the change. A fit-out that keeps the same use is a lighter set than a change of use that brings fire separations, sprinklers, plumbing or structural work, and each added discipline adds sheets. We quote after a free first consultation.

  • Mostly it depends on what must be approved before the permit. A use the governing by-law doesn’t allow needs a variance first, and a storefront change in a Heritage Conservation District needs a heritage permit as well. After that, the review turns on how complete the set is and how many comment rounds follow, and we answer those at no extra charge.

  • It does, and the City wants a building permit for it even if nothing is built. The first check, though, is whether a restaurant may operate at that address at all: Toronto reads permitted uses from Zoning By-law 569-2013 or, for some properties, a former municipality’s by-law, and we confirm which one governs before drawing the kitchen. Health approval and any liquor licence are separate from the permit.

  • Yes. A new storefront is an exterior alteration that can be seen from the street, and in a Toronto Heritage Conservation District that calls for a heritage permit on top of the building permit, which it does not replace. Heritage review can shape what the front looks like, so we check the address against the districts before the front is designed.

  • Yes. Send us the set on file and the City’s letter. Replies to city letters are part of our structural consulting, so our P.Eng answers the structural comments, and our mechanical and electrical designer takes the HVAC, plumbing and fire safety ones. Where a sheet has to change, we revise it and resubmit.

  • Toronto’s change-of-use rule doesn’t come into it when the business stays the same, so the work alone decides. New walls, washrooms, structure, plumbing or HVAC count as construction under Ontario’s Building Code Act, and they need the permit before they start. Send us the floor plan and we will mark which parts of the job it covers.

  • Depending on the business and where it is, starting up can involve business registration, sign permits, building permits, health approval, fire inspections and a liquor licence. We help you work out which apply and prepare the building permit set to match.

  • Yes. The change is designed from the space as it stands, so we measure the unit and draw what is there, including walls, exits and washrooms. The new layout, the fire separations and any new plumbing or HVAC are designed against that drawing.

  • If the application falls under the City’s permit guide for large residential and non-residential buildings, yes: the guide asks for a Vibration Control Form on every project except Part 9 residential. The form sets out the construction activities that may cause vibration and the pre-construction and preventative measures to be taken. For a commercial building or an addition to one, we include it in the package from the start.

Searched & answered

People Also Ask: what Toronto searches about commercial permits.

Short answers to the commercial permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Whenever a building or unit takes on a different use, residential to office for example, even if no construction is proposed. The new use is checked against zoning and the Building Code, and any work it triggers goes into the same application.

  • Not when the alteration can’t be seen from the street or another public space. The heritage permit is for new construction, exterior alterations and additions, so an interior fit-out goes ahead on the building permit alone.

  • When the use or the layout doesn’t meet the zoning by-law that governs the property. Local by-laws can restrict some business activities, and a variance from the Committee of Adjustment is how an exception is sought. In Toronto that starts by confirming whether 569-2013 or a former municipality’s by-law applies.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

Commercial building permits in Toronto

A commercial file from us covers change of use, interior alterations and fit-outs, plus the fire and life-safety work that often comes with them: fire alarm layout, sprinklers, emergency lighting and exit signs. Zoning is read before the layout is drawn, and the plans go to the City to scale, in detail, with the designer’s credentials on them.

The fire and life-safety sheets come from our mechanical and electrical designer, drawn over the same floor plan as the new walls together with any HVAC and plumbing changes, while our P.Eng designs whatever structure the layout alters. What the examiner sees is one set in which the alarms, the exits and the walls agree.

Permitted uses under 569-2013 or a former by-law

For a commercial unit, the first question is whether the business is allowed at the address at all, and in Toronto that turns on which zoning by-law governs the property. Zoning By-law 569-2013 covers the city as a whole, yet some addresses remain under their former municipality’s zoning, and the permitted uses can differ. We check the proposed use against the right one before laying out the space.

Local by-laws can also restrict certain business activities or call for a variance before a use is allowed. When that happens, the variance comes first and the permit drawings follow it.

Change of use: a permit with no construction

Changing a building’s use, residential to office in the City’s own example, needs a building permit in Toronto even when no construction is proposed. So a change of use file starts with the permit, not with a contractor. In practice the new use often brings work with it, such as sprinklers, a fire plan, plumbing, HVAC or structural changes, and all of it is drawn into the same application.

Contact us

Lease signed. Layout drawn. Permit filed.

Tell us the address and the use, and we’ll tell you what the city will ask for, on a free first call.

First consultation free(416) 990-9179