Grading Plans and Site Engineering in Toronto

Grading plans in Toronto prepared and stamped by our P.Eng for new houses, additions, garden suites, pools and driveways: grading and drainage design, site alteration and Committee of Adjustment work, followed through to the final grades.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sod
Deliverable
Grading & site plans
Municipality
Toronto, Ontario
Permit office
Toronto Building
From our office
About 30 minutes
Fig. 01 · Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sodRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Building permits go to one department and site plans to another, which has criteria of its own. We fit the lot design to those first, then carry it through review with whoever applies them. In Toronto the package goes to Toronto Building, and it is drawn to that department’s checklist.

  • Grading plan sheet for a site in Guelph

    Drainage & runoff

    Grading plan

    For a pool, building permit or site alteration, we calculate runoff, plan sediment control and set out the lot’s swales, drainage and elevations, existing and proposed.

    • Lot grading & drainage design
    • Runoff analysis & calculations
    • Erosion & sediment control
    • Surface drainage details
  • Lakeside deck and walkout with landscaping

    Backyards

    Pool & landscape design

    Code-compliant design for driveways, porches, pergolas and outdoor living areas, plus pool permits with the grading they need.

    • Pool enclosure permits
    • Backyard & landscape layouts
    • Driveways & hard surfaces
    • Pergolas, porches & lounge areas
  • New concrete driveway curving up to a house at dusk

    Earthworks

    Site alteration permits

    Excavation, big landscape changes, cut and fill and their accessory structures, with approval sought under the municipality’s site alteration by-law.

    • Excavation & cut-and-fill plans
    • Major landscape changes
    • Garages & accessory structures
    • Demolition & site removal
  • New custom home on its lot

    Committee of Adjustment

    Zoning plan approval

    We hold development plans and site layouts up to the zoning by-law. Where a project seeks relief, we prepare minor variance drawings and handle coordination with the authorities.

    • Site plans & development layouts
    • Zoning review & minor variances
    • Committee of Adjustment packages
    • Coordination with the city and the conservation authority

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Grading planElevations, swales and drainage
  2. Stormwater notesRunoff calculations for the city
  3. Erosion control planFor the construction period
  4. Site alteration permitDrawings and application
  5. Pool permit drawingsEnclosure and grading
  6. Site planSetbacks, coverage, variance sketches
  7. Committee of AdjustmentPackage, coordinated with the city and conservation authority

How it runs

Process: 4 steps from first call to sign-off.

Four steps from the survey to the approval. We design the site so it drains, then take it through the department that reviews it.

  1. Survey & site review

    Where water goes now shows in the neighbours’ grades, downspouts, swales and any catch basins. We note them on a walk with a topographic survey.

  2. Zoning & by-law check

    Setbacks, lot coverage, hard-surface limits and site alteration by-law rules get checked before any design work, so the plan fits the rules its review will use.

  3. Grading & drainage design

    The proposed swales, elevations and slopes hold the runoff on the lot until it drains to the street or to a storm connection. If the city asks, calculations follow.

  4. Submission & approvals

    The grading plan goes in with the site alteration application or the building permit. We answer the reviewer’s comments for no extra charge, and if a conservation authority is involved, we coordinate with it.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Address and a current topographic survey
  • Your plans: building, paving or regrading
  • Another designer’s pool or architectural drawings
  • Photos of low spots and boundaries
  • City comments or conservation authority letters
  • Catch basins, downspouts, storm connection

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: site engineering in Toronto, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • It is the municipal body that decides minor variances, the small departures from a zoning by-law that an owner can ask for without a rezoning. The Planning Act sets its tests: the variance has to be minor, suit the development of the property, and keep to the intent of both the zoning by-law and the official plan. For a Toronto infill house the grading is caught up in it too: the plan prepared under the City’s lot grading requirements sits in the building permit set, so a variance that shifts the house shifts that plan as well. We draw the Committee package and the grading from one site plan.

  • In Toronto the City’s requirements set most of it. A new infill house outside subdivision or site plan approval needs a sealed plan, field review and, once final grades are in, a Lot Grading Certificate, which makes it the largest of these jobs. On a narrow lot, fitting side yards that drain at 1.5% or more takes more design, and a lot in a TRCA Regulated Area adds that authority’s review. A pool or a driveway is a smaller drawing, quoted after a free first consultation.

  • A new house that isn’t going through subdivision or site plan approval needs a grading plan with its building permit, under the City’s lot grading requirements. Inside the area covered by the Ravine and Natural Feature Protection By-law, grading needs its own permit. On a property in a TRCA Regulated Area, TRCA’s permit or clearance comes before the building permit. For smaller work, such as a pool or a regrade, we look at the drainage and tell you which approval applies.

  • For a new house the plan travels with the building permit, so its timing is the permit’s, plus whatever has to come first. A lot in a TRCA Regulated Area waits for TRCA’s permit or clearance, and grading inside the ravine protection area waits for that permit. The job also runs past the permit: the Lot Grading Certificate is issued only once final grades are in, near the end of construction.

  • A drawing of the lot showing the existing and proposed ground levels, the slopes and swales that carry water away from the house and off the property, where the downspouts discharge, and the sediment control used during construction. In Toronto it is drawn to the City’s infill grading criteria and stamped by the consultant who later certifies the final grades.

  • The building’s distances from the lot lines, the ground elevations at the corners of the house and along the property, the finished floor and finished grade, and the slopes between them. Read together, those numbers show the examiner where water runs once the house is built, and they are what the final grades are later checked against for the Lot Grading Certificate.

  • Because the roof water has to be handled on the lot. Toronto requires downspouts to be disconnected from the City’s sewer and pointed away from the foundation, and its infill rules forbid sending storm drainage to the sanitary sewer. The ground itself has to carry that water away from your basement, along slopes the City sets, without dumping it on a neighbour.

  • For a new infill house outside subdivision or site plan approval, yes: it is part of the building permit set. An addition is judged by what it changes. New roof area adds water to manage, and a bigger footprint can alter how the lot drains, so we look at both during the site visit and tell you whether a plan is needed.

  • Two kinds of Toronto lot do. Inside the area covered by the Ravine and Natural Feature Protection By-law, grading needs a permit whatever the size of the trees there, and on a lot in a TRCA Regulated Area, TRCA’s permit or clearance comes before anything at the City. For any other backyard, tell us what you want to change and we check whether it alters the drainage enough to need a plan and an approval.

  • Cutting the ground down to a basement door means the grade must still fall away from the house everywhere else, and the water that collects at the foot of the walkout needs a route that isn’t the sanitary sewer, which Toronto’s infill rules rule out. We design the retaining walls, the slopes and the drainage together and draw them on one plan.

Searched & answered

People Also Ask: what Toronto searches about site engineering.

Short answers to the site engineering questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • A grading consultant, such as an Ontario Land Surveyor or a professional engineer, under the City’s lot grading requirements for infill housing. The same consultant issues the Lot Grading Certificate once final grades are in. Fine Engineering’s plans are stamped by our P.Eng.

  • For a new infill house, the City expects a grading consultant, such as an Ontario Land Surveyor or a professional engineer, to prepare the plan and certify the final grades. That consultant’s signature is what the Lot Grading Certificate rests on.

  • Usually. A grading plan compares existing and proposed elevations, and the existing ones have to be measured. A current survey also fixes the lot lines the setbacks are taken from.

  • Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.

  • Permission from the municipality’s Committee of Adjustment to depart slightly from the zoning by-law, for example a smaller side yard or a little more lot coverage, without rezoning the property. The Committee has to be satisfied that the change is minor and meets the other tests the law sets, and a bigger change needs a rezoning instead. Fine Engineering draws the plans and handles the application.

  • On most serviced urban residential lots in Ontario, yes. Since Bill 23, the Planning Act stops a zoning by-law from prohibiting up to three units there, which can be the house, a basement unit and a unit in a backyard building. Lot size, setbacks and servicing still decide whether both fit, and each unit needs a permit. Fine Engineering designs both units and confirms the zoning allows the pair.

Good to know

Grading plans in Toronto: when the City asks

We draw grading and drainage plans for Toronto lots: new infill houses, additions and garden suites, pools, driveways and backyard regrades. The plan shows existing and proposed grades, how surface water leaves the lot and the sediment control during construction, with runoff calculated where the design needs it. Our P.Eng prepares and stamps it.

For work other than a new house, such as a pool, a walkout or a regrade, we look at how the change alters the drainage and tell you at the site visit whether a plan is needed and which approval it belongs to.

Lot grading certificates and TRCA approval in Toronto

Toronto’s lot grading requirements apply to permits for new housing that isn’t subject to subdivision or site plan approval. The plan is prepared by a grading consultant, such as an Ontario Land Surveyor or a professional engineer, who also issues a Lot Grading Certificate once final grades are in. Our part runs from the design, through field review, to that certificate.

Before any grades are set, the lot is checked against TRCA’s regulation mapping. If the property is inside a TRCA Regulated Area, nothing moves at the City until TRCA has issued a permit or clearance, because the City cannot legally issue the building permit before then.

Slopes and storm water on a Toronto infill lot

Toronto’s infill grading rules give us the numbers. Side yards drain at a slope of at least 1.5%. Where grades are altered, rear yard slopes should not exceed 10%. And storm drainage may never be directed to a sanitary sewer. Those limits decide where the swales run and what the finished grades around the house can be.

On a narrow lot the side yard is where those slopes are hardest to fit, so we design it first and work outward from there.

What moves the grading cost in Toronto

Every Toronto property owner must have their downspouts disconnected from the City’s sewer system, with the water directed away from the foundation walls and not onto a City sidewalk. On a new house or an addition, the roof water therefore has to be carried to grade and away from the building on the lot itself. Finding where it can go on a tight lot is much of the design work.

That is why two Toronto lots of the same area can price differently: a narrow infill lot has to fit the roof water, the side-yard drainage and the neighbours’ grades at the lot lines into much less room than a wide one.

Ravine lots: a permit before any grading

Toronto’s Ravine and Natural Feature Protection By-law covers ravines, forests, public parks, golf courses and other identified natural features. On a lot inside that area, grading or tree work in the protected part needs its own permit regardless of tree size, so the grading plan is drawn around it and that approval is in place before the grading begins.

Lot grading and drainage on Toronto lots

The plan starts from surveyed grades, so the existing ground is measured rather than assumed. We then design the proposed grades and the drainage: swales, slopes away from the house, where the downspouts discharge, and runoff calculations where the site calls for them. The stamped plan goes in with the permit, and we answer the City’s grading comments along with the rest of the set.

Commercial sites get the same treatment: the grading and drainage are drawn into the site layout and development plans we prepare for them.

Contact us

Survey in. Grades set. Water where it belongs.

Send the survey and your plans and we will say what the city needs, on a free first call.

First consultation free(416) 990-9179