
Ground floor and up
Rear & side additions
Behind or beside the house: bedrooms, family rooms and kitchens on new foundations keyed to old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Toronto
Home additions in Toronto from an office with more than 200 building designs since 2016: the engineer who checks what your framing and foundation can carry also draws the addition and files it with the City, and our own crew builds it.

What’s included
Where new meets old is where an addition gets judged: the beam through the wall, a roof joined to the old one, ducts run out to new rooms. Those joints come first in our design. In Toronto the package goes to Toronto Building, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
The city gets plans, elevations, structural, HVAC and electrical drawings from one office, which replies at no extra cost.
Each stage is inspected: excavation, foundation, framing, the opening to the existing house, rough-ins, the exterior and finishes.
Final inspection done, permit closed, and you get one building back.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179We price it from the design after a free first consultation, since size, storeys and what the existing structure needs drive most of it. One Toronto item belongs in every addition budget: downspouts have to be disconnected from the City’s sewer, so the new roof’s water is carried to the ground, away from the foundation and off the sidewalk, and the grading around the addition has to take it. New footings under a second storey, or a heritage permit on a street-facing addition, add further.
Begin with the lot, since in Toronto it decides which approvals the addition needs. We find which zoning by-law governs it, whether the street is in a Heritage Conservation District, and whether the lot is inside a TRCA Regulated Area. On such a lot TRCA gives its permit or clearance first, and only then can the City issue the building permit. Then our engineer checks what the existing framing and foundation can carry. The design, the permit and the build follow from those answers, and our team handles all of them.
Every addition needs a building permit. A variance comes in when the design misses a setback, height or coverage limit in the governing zoning by-law; the Committee of Adjustment then has to approve a minor variance before the permit can be issued. We draw the variance plans and the permit set from one design, so both reviews see the same addition.
The approvals before the permit account for most of the swing. New footings close to a City street tree, or to a private tree with a trunk 30 cm or more in diameter, mean a tree permit before excavation can start, and a heritage permit or a minor variance adds a step of its own. After the building permit is issued, construction runs in stages around the inspections, and the quote comes with a schedule.
It depends on what your lot allows and what moving would cost you, and our team can look at it from both sides. Our engineer can tell you what the house and the zoning will take, and Robert Grin, our Director and a real estate Broker of Record, can speak to what the addition would do to the property’s value.
The lot decides more than the house style does. A rear addition needs rear yard that the zoning by-law hasn’t already spent. Where the yard runs down to a ravine, Toronto’s Ravine and Natural Feature Protection By-law requires a permit before a tree of any size in the protected area is harmed or removed, which can make building up the simpler choice. Where neither the yard nor the side setbacks have room to give, a second storey is what remains, if the structure below can carry it.
A full second storey covers the whole footprint and puts new load on every bearing wall and footing. A partial one sits over part of the house, so less of the structure is affected and less of the roof comes off. Either way our engineer checks the existing framing and foundation first, and the lot’s zoning sets how high it can go.
Yes. Toronto’s multiplex rules allow residential buildings of up to four units anywhere in the city, so an addition can be designed as a unit of its own, with its own way out, a fire separation from the main house and its own services.
In Toronto the approvals can tip it. Going out spends rear yard and lot coverage, measured against 569-2013 or the former municipality’s by-law that still governs some lots. Going up keeps the yard, but in a Heritage Conservation District a storey that can be seen from the street needs a heritage permit, which a rear addition out of view avoids. Then our engineer checks whether the house can carry the extra storey.
It depends on the addition. A rear addition is mostly built outside until it is joined to the house, while a second storey means the roof comes off over the rooms below. We go through the stages with you when we quote, so you know when the house will be most disrupted.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA site plan, floor plans, elevations and sections, structural drawings for the new framing, beams and footings, and an HVAC design where the heating extends into the addition. The site plan shows setbacks measured against the governing zoning by-law.
Yes; the elevations are drawn to match. In a Heritage Conservation District, a street-facing addition goes through heritage review as well as the building permit, which shapes its design.
Mostly what the new work bears on: original framing and foundations that were never sized for an extra storey, and the joints between old structure and new. Our engineer checks both before the addition is designed.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
An addition starts with the house underneath it. We measure the building, look at the framing and foundation the new work will lean on, and settle the beams, columns and mechanical tie-ins before the addition itself is drawn. Rear, side and second-storey additions all begin there, and the same team then takes the drawings through the permit and builds.
Since May 2023, when Toronto City Council adopted its multiplex amendments, a house anywhere in the city can hold up to four units as of right. An addition can therefore be planned as a second or third unit, which brings separations, exits and servicing into its drawings from the start.
On a house that will hold two units or less, a second storey may qualify for the City’s Reliance on Professional Engineer’s Seal Program. Under it our P.Eng answers for the work the program covers and the City expedites its review, which shortens the City’s part of the schedule, not the design. Eligibility is the City’s call, so we never count on it. How tall the addition can go is set by the lot’s zoning.
Before the upstairs is laid out, our P.Eng checks the existing framing and foundation, and where they fall short, the reinforcement or new footings go on the drawings first. You see that result before committing to a design, because it sets what the addition can be.
The addition’s setbacks, height and lot coverage are checked against whichever by-law governs the lot. That is 569-2013 for most lots, but where a property is still under its former municipality’s zoning, the addition is measured against that by-law’s numbers instead. We confirm which applies before the first sketch.
In a Heritage Conservation District, an addition needs a heritage permit as well as the building permit, and the heritage permit does not replace it. An alteration not visible from the street or other public space doesn’t need one, so a rear addition out of view can avoid it.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.
First consultation free(416) 990-9179