Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Markham, York Region
Home additions in Markham, drawn in one office under a P.Eng seal and a BCIN: the structure, the plans and the mechanical sheets as one set. We file the permit, answer the City’s examiners at no extra charge and build the addition with our own crew.

What’s included
Seams with the old house are what an addition is judged on. The wall opens for a beam, the new roof joins the old one and ducts must reach the new rooms. Our design starts with those seams. Markham packages are filed with the City of Markham Building Standards Department. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
The tie-in takes the longest of four steps, planned around you because you keep living there.
We take measurements of the house and lot, read what the by-law permits and look over the framing and foundation being joined.
A single office makes plans, elevations, structure, electrical and HVAC, files them and answers the city at no added cost.
Digging, foundation and framing, then opening up the existing house before rough-ins, exterior work and finishes, each stage inspected.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Any number given before a design exists is a guess, which is why our itemized price comes after the site visit. Size, one storey or two, how much of the existing house is opened and the finishes drive it. On a Markham lot, the footprint can bring a grading plan, a heritage district brings an approval, and a missed zoning rule brings a variance. Design and permit fees are listed apart from construction.
In order: survey the house and lot, check the zoning by-law that governs it and any heritage or conservation limits, design the addition with its structure and mechanical tie-ins, file the permit, then build. Building then goes from digging and the new foundation, through framing and breaking into the old house, to rough-ins, the exterior and finishes, with an inspection at each stage.
The approvals take the first stretch: zoning check and drawings, any minor variance, then the permit review. In Markham a protected tree (a trunk diameter of 20 cm or more) beside the new footings adds a step, since injuring it needs a tree permit unless the design keeps out of its root zone. The slowest part of construction is joining the new rooms to the old ones, because the family is living on the other side of that wall. Your quote carries a schedule, revised as the City’s comments come in.
A permit always; a variance only when the addition misses a zoning rule. The governing by-law sets the setbacks, coverage and height, and a shortfall goes to the Committee of Adjustment before the permit. On a lot inside a TRCA Regulated Area, the conservation authority’s permit or clearance must be in hand before the City can legally issue the addition’s building permit.
Ground-floor additions at the back or side, second storeys, sunrooms and covered porches, and additions that hold a separate unit. Which of them a Markham lot can take is a zoning question first: the setbacks in the governing by-law limit how far out you go, and its height limit how far up. A house in one of the four heritage districts adds that district’s guidelines to the list, and the addition is drawn to them from the first sketch.
No. Markham exempts residential additions on a single family lot from the Site Alteration Permit and sends them through its Residential Infill Grading and Servicing process instead. The City’s engineering staff review that as a submission separate from the building permit drawings, so the grading has its own place in the schedule and its own set of comments to answer.
Plans, elevations and sections, a site plan with setbacks and coverage, structural drawings stamped by a P.Eng, and HVAC and electrical sheets where the new rooms are heated and wired. A sunroom still needs its foundation and framing drawn. A second floor adds a structural review of everything underneath it, and a large footprint in Markham adds a grading plan.
Put Markham questions to them before asking for a price: which zoning by-law governs your lot, since By-law 2024-19 does not cover every property; whether the footprint reaches the 50 square metres of ground that brings a grading plan; and whether the house is inside one of the four heritage conservation districts. A contractor who answers those from your address has started on the work the permit depends on. We answer them at the first visit, and our P.Eng stamps the structure we then build.
Check Markham’s rules first, since they treat up and out differently. A ground-floor addition of 50 square metres or more needs a grading plan through the City’s grading and servicing process, and new footings beside a protected tree (on private land, a trunk of 20 cm or wider) need a tree permit or a layout that keeps off its roots. A second storey adds no ground footprint, so the grading plan drops out; instead it has to fit the governing by-law’s height limit, and our P.Eng has to confirm the house can carry another floor.
No. Markham no longer accepts paper applications; building permits go in online through ePLAN, so the addition’s plans, structural sheets and site plan are uploaded as digital files. Plan review happens in the portal, and when the examiner marks up a sheet, the revision and the resubmission go back the same way. We look after the uploads and the replies, and you sign the application as owner.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationSometimes as it stands, sometimes only with reinforcement. An engineer checks the footings, the foundation walls and the beams that would take the new load, and where they fall short, new posts and beams or a strengthened foundation are designed into the permit set.
They add an approval. Owners of every property in Markham’s heritage conservation districts (Thornhill, Markham Village, Buttonville and Unionville) must obtain approval for exterior alterations and new construction, so an addition there is designed to the district’s guidelines and approved before the permit proceeds.
In Markham, the backyard’s limits come before the structure. The rear setback and lot coverage come from the by-law that governs the lot, a private tree of 20 cm or more near the new footings needs a tree permit or a layout that keeps off its roots, and a lot backing onto a valley or creek may need TRCA clearance before the City permit can be issued.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
An addition is judged where it meets the old house. Before anything is drawn we measure the house and the lot, check what room the governing by-law leaves, and inspect the foundation and framing that the new work will lean on. Out means a new foundation beside the old one; up means the existing walls and footings carry a new floor.
The joints are designed first: the beam that opens the old wall, the roof that ties into the existing one, the ducts and circuits that have to reach the new rooms. Our P.Eng stamps the structure, the same office draws the plans and mechanical sheets, and our crew builds it.
The answer sits in the foundation, the walls and beams that will take the new floor, and the roof that comes off to make room. Joists that were only ever meant to hold up a ceiling cannot carry people and furniture, so a second storey usually needs a new floor structure, and some houses then need new posts and beams or part of the foundation reinforced. Our P.Eng settles which at the site visit.
Height is the other limit. The governing by-law sets how tall the house can go, and a second storey that would break that limit needs a design change or a minor variance before the permit.
An addition has to fit the setbacks, coverage and height of the by-law that governs its lot, and in Markham that is not always By-law 2024-19, which does not cover every property. We read the lot on the City’s interactive zoning map first. If the addition misses a rule, it goes to the Committee of Adjustment, and the variance drawings and permit set come from one design.
In a heritage conservation district, every property needs approval for exterior alterations and new construction, so an addition there adds a heritage step before the permit can proceed. Matching roof pitch, cladding and window proportions is design work we do routinely, and in a district the addition is drawn to that district’s guidelines.
Size, storeys, how much of the old house is opened and the finishes set most of the price. The structure and foundation follow from the design and the Code, while the finishes are yours to choose. A minor variance, a new heating system or a separate unit each adds a line of its own.
Markham adds a line that depends on the footprint: an addition of 50 square metres or more to the existing ground surface needs a grading plan through the City’s residential grading and servicing process. After grading, the lot grading undertaking is released only once a grading certificate sealed by a P.Eng or an Ontario Land Surveyor is submitted.