The way in
Separate entrance
The foundation gets a new outside door cut through it, with its drainage, stairwell and guard designed so the wall is no weaker.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Markham, York Region
Legal basement apartments in Markham, designed and built by one team: the separate entrance, fire separation, escape windows and heating for two units drawn in-house, taken through the City’s permit and built through every inspection to a closed file.

What’s included
Each item on a legal unit’s code list gets checked by the inspector. Our design and build follow that list, and the city’s sequence decides when we book inspections. In Markham the package goes to the City of Markham Building Standards Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
A bare basement gets to a closed permit in four steps, and the inspections are on the schedule.
We measure the ceiling, look at the windows, the entrance options and the mechanical room, and tell you whether the basement can be made legal and what it will take.
The municipality receives drawings from one office: HVAC, structural opening, separations and layout. City comments are answered without charging extra.
Entrance, framing and rough-ins, then insulation and rated assemblies, each stage inspected.
Floors, doors, kitchen and bathroom go in. The final inspection then closes the permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Part of the price is set by Markham’s own rules. A new basement entrance is a separate item on the City’s permit list, so the opening and its stair are drawn and inspected along with the unit, and the suite is finished only when it passes a registration inspection arranged with Markham Fire & Emergency Services, which sets the standard its separations and alarms are built to. In the Markham Village and Unionville study area, a March 2025 City presentation said the storm system lacks capacity in very large storms and surcharges into basements, so a suite there is designed with that in mind. Headroom and underpinning decide most of the rest, and design and permit fees are listed apart.
A building permit, a passed final inspection and, in Markham, a registration inspection with Markham Fire & Emergency Services. The unit has its own kitchen and bathroom and meets the Building Code on headroom, fire separation, alarms and exits. The Code’s name for it is a secondary suite; Ontario’s planning rules call it an additional residential unit.
Think of it in three parts: drawings and the City’s review, construction around the staged inspections, and the fire registration inspection at the end. Markham’s review only begins when nothing is missing from the file, and the City takes it only through ePLAN, so a set that answers the code list up front avoids extra rounds of comments. Underpinning or a new entrance lengthens construction. The quote comes with a schedule built around those stages.
A building permit that, in Markham, reaches past the apartment itself: installing a basement entrance is listed as permit work in its own right, and so is constructing separate rooms in a basement. The wiring takes a separate ESA permit. Once the suite is built, it is registered after its fire inspection.
A self-contained second unit below the main floor: its own kitchen, bathroom and living space, separated from the house by a fire separation, with its own way out. A basement finished for the same household, even with a bedroom and a bathroom, is not one, though in Markham its separate rooms still need a building permit.
Usually, on a serviced lot with a detached house, semi or rowhouse, since Ontario’s Planning Act stops zoning from prohibiting the unit there. What we confirm for your address is which Markham by-law governs the lot and whether anything in it, or on the site itself, such as the side yard an entrance needs, gets in the way.
Yes, if the basement is becoming a separate apartment. Installing an accessory apartment is one of the items on Markham’s building permit list, and Ontario’s Building Code Act can require a permit for a change of use even where nothing is built. A basement finished years ago and now rented out goes through much the same steps as a new file: drawings of the space as it is, the changes it needs, then inspections.
For a new suite, yes. It needs a registration inspection arranged with Markham Fire & Emergency Services, and City officials check both dwelling units for building and fire safety. We plan for that inspection on every suite from the first drawing.
Often it can, by lowering the floor, and Markham’s permit list names renovating a house to provide a full basement among the projects that need a permit. So the lowering is designed and drawn into the suite’s own set before any digging starts. Underpinning is the usual method, designed by our P.Eng, and we tell you at the site visit whether the height gained is worth what it costs.
Yes, and it gets its own place on the permit: Markham lists installing a basement entrance separately from installing the apartment, so the opening is drawn and inspected with the suite rather than added once the unit is finished. Our P.Eng works out how wide the opening can be while the foundation still holds up the house, and our crew cuts it and builds the stair.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA registration inspection arranged with Markham Fire & Emergency Services, on top of the building inspections under the permit. The fire separation, interconnected smoke alarms, carbon monoxide alarms where required and the exits have to be in place and working when it happens.
A minor variance is permission from the Committee of Adjustment to miss a zoning rule by a small amount. A Markham basement apartment needs one when the lot falls short of the governing by-law, for example a setback affected by a new side entrance; the application takes drawings, public notice and a hearing.
At least 1.95 m under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. A basement short of that can often be lowered by underpinning, which is structural work designed by an engineer and drawn into the same permit set.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Good to know
First a permit and a passed final inspection. Then the Building Code’s list for a second unit: headroom of 1.95 m, dropping to 1.85 m under beams and ducts; a fire separation between the suite and the floors above; smoke alarms linked so they sound together; carbon monoxide alarms where the code requires them; and an exit the occupants can use in a fire.
A kitchen and bathroom of its own, heating that serves two units (a shared furnace designed for both, or separate systems) and sound separation complete the list. We measure the basement against each item at the first visit and tell you what it is missing before any drawing starts.
Whether a lot may have a basement apartment is a zoning question first. The City’s interactive zoning map tells us whether your lot falls under By-law 2024-19 or under another by-law, because 2024-19 does not apply to every property, and the suite is checked against whichever one governs before anything is drawn.
A provincial floor sits under the City’s rules. Since November 2022, under the Planning Act, an Ontario zoning by-law may not forbid a detached, semi-detached or row house on a serviced urban residential lot from holding up to three units, and a by-law cannot ask for more than one parking space for the added unit. Where a lot misses a rule, a minor variance is the route.
Some items depend on where the house stands. According to a March 2025 City presentation on flood control, the Markham Village and Unionville study area was developed before 1978 to a drainage standard giving a 5-year level of service, and in very large storms its sewers lack capacity and surcharge into basements. A suite planned there takes that history into account in its design.
The rest of the list is measured in the basement: the ceiling height, where an entrance and exit can go, room for the fire separation, drain depth for a second kitchen and bathroom, and an electrical panel with capacity to spare. Every item a basement already meets keeps the scope smaller.
Markham lists installing a basement entrance as a project that needs a building permit, separately from installing the accessory apartment itself. So the entrance is drawn into the suite’s permit set from the start: the opening through the foundation wall, the stairwell beside the house, its guard and drainage, and a door that serves only the suite.
Where it can go depends on the side yard, the grade and what the zoning allows on that side of the house. A door is one of several ways to meet the exit rule, and we show you the other routes at the site visit before anyone cuts the foundation.
A suite is not finished when its permit is issued. In Markham, City officials inspect both units of a house with a second suite for building and fire safety, and a new suite needs a registration inspection arranged with Markham Fire & Emergency Services. The unit is done when it passes, so separations, alarms and exits are built to that standard from the start.
Before then the job runs in stages: drawings and the permit review, construction around the framing, plumbing, HVAC and fire separation inspections, then the final. Height that already meets the code and an exit that already works shorten the job; underpinning or a foundation opening lengthens it.
Markham’s permit page says outright that construction inside a dwelling earns no exemption from a building permit, and a basement apartment is the clearest case: new rooms, new plumbing and a fire separation, all inside the house and all on the permit. That holds for a unit finished years ago without one, too.
Our part runs from the first measurement to the closed permit: the site visit and code check, drawings for layout, separations, structure and HVAC, the filing and the replies to the City’s examiners at no added cost, then the build by our crew, inspected stage by stage.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179