Commercial Permits · Markham, York Region

Commercial Building Permits in Markham

Commercial building permits in Markham, beginning with a zoning check that tells you whether your use is allowed in the unit, then the occupancy classified under the Building Code and a set signed under our P.Eng licence and BCIN registration, fire alarm and exit layouts included.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lot
Reviewed for
Zoning + Ontario Building Code
Municipality
Markham, York Region
Permit office
City of Markham Building Standards Department
From our office
About 30 minutes
Fig. 01 · Single-storey retail plaza with black-framed storefronts between brick piers and a freshly striped parking lotRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Commercial work is judged on the code analysis before it is judged on the drawings. We classify the occupancy, confirm the zoning and work out the fire and exit requirements first, so the layout you commit to is one the city will approve. The Markham package is sent to the City of Markham Building Standards Department, and the drawings follow its checklist.

  • Commercial office fit-out with glass partitions

    Fit-outs & new builds

    Commercial building permits

    Tenant fit-outs, alterations and new commercial construction, drawn to scale with the designer’s credentials and signature the Ontario Building Code requires on commercial plans.

    • Tenant fit-outs & alterations
    • New commercial construction
    • Interior & exterior alterations
    • BCIN & P.Eng credentials on every sheet
  • Restaurant interior after a change of use

    New occupancy

    Change of use

    A residential unit that becomes a shop, an office that becomes a restaurant, a clinic that becomes a supermarket: any change in a building’s purpose requires it, built or not.

    • Occupancy classification review
    • Fire separations & exits
    • Plumbing, HVAC & sprinkler upgrades
    • Zoning confirmation
  • Restaurant storefront on a commercial street

    Opening the doors

    Business licences

    The approvals a new business needs beyond the building permit, worked out before the lease is signed so nothing surprises you at opening.

    • Zoning & minor variances
    • Sign permits
    • Fire & health inspections
    • Liquor licence drawings
  • Fire safety inspection in a commercial unit

    Occupant safety

    Fire & life-safety upgrades

    Drawn alongside the permit package, layouts for the fire alarm, sprinklers, exit signs and emergency lighting let fire and building officials work from one set.

    • Fire alarm layout
    • Sprinkler design
    • Emergency lighting & exit signs
    • Fire separation details

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Code analysisOccupancy, fire separations, exits, washrooms
  2. Floor plans & elevationsExisting, proposed and ceiling plans
  3. Structural drawingsOpenings, mezzanines, roof-top units
  4. Mechanical & electricalPlumbing too, drawn for the permit
  5. Fire & life safetyAlarm, sprinklers, emergency lighting
  6. Zoning reviewPlus variance drawings if needed
  7. Application & responsesEvery examiner comment answered

How it runs

Process: 4 steps from first call to sign-off.

Four steps, timed around your lease. We start with the code analysis so the layout you fall in love with is one the city will approve.

  1. Site visit & code analysis

    Once we confirm zoning allows your use, measure the unit and classify its occupancy by the Building Code, we know what the space needs. No layout gets drawn before that.

  2. Layout & coordination

    Kitchen, mechanical rooms, washrooms, exits and floor plan become one layout, built to standards from your designer or franchisor, so fit-out drawings and the permit set line up.

  3. Drawings & engineering

    Our P.Eng and our BCIN designers stamp sheets drawn in one office: structural, fire-safety, architectural and mechanical.

  4. Submission & approvals

    We file the building permit and support the sign permit, fire inspection and licence applications that follow, answering city comments at no extra charge.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Unit address and landlord base-building drawings
  • The space’s past use and what you plan
  • Your lease start date and any landlord deadlines
  • Franchise or brand design standards
  • Equipment lists for kitchens, clinics or workshops
  • Any city notices or orders on the unit

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: commercial permits in Markham, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • How far the new use sits from the old one sets most of it. A shop becoming another shop may need a floor plan and little else; a restaurant going into former office space brings kitchen exhaust, extra plumbing, rated separations and possibly sprinklers. A storefront inside a Markham heritage district adds approval for the exterior. The City’s fee is its own charge, and our quote follows a free first look at the space.

  • Ontario’s Building Code fixes review periods by building type, and the clock starts only on a complete file: for most commercial buildings it falls somewhere between a house’s 10 business days and a complex building’s 30. In Markham the whole exchange happens in ePLAN, so a round of comments lasts as long as it takes to revise and re-upload the sheets. We never promise an issue date.

  • Quite possibly. Ontario’s Building Code Act requires a permit for a change of use that raises the hazard, construction or not. Put a restaurant where an office was and the rules for fire separations, exits, plumbing and ventilation all change, though not one wall moves. Alterations and fit-outs need a permit regardless of use.

  • Yes, but in Markham the first question is whether a restaurant may operate in the unit at all. It has to be a permitted use under the by-law covering the lot, and 2024-19 is not the only zoning by-law in force, so the City’s map is checked to see which one covers your unit before anything is drawn. Once the use is confirmed, the change of use and the kitchen fit-out go in as one permit application, with the exhaust, plumbing and fire separations drawn together.

  • Yes. In Kitchener we designed the change of use from a dental office to a supermarket: an interior renovation with a new plumbing system, and fire separations upgraded for Ontario Fire Code compliance. A Markham conversion is drawn the same way, with the City’s zoning check in front of it and the set filed through ePLAN.

  • Yes, where the building falls within our registration. Commercial plans have to carry the designer’s credentials and signature, and ours are a BCIN covering the Small Buildings, Structural and HVAC categories plus a P.Eng licence for the engineered sheets. If a building calls for an architect, we bring one in and tell you before the scope is set.

  • Inside, a building permit; outside, in four Markham districts, heritage approval as well. If the building sits in one of the heritage conservation districts (Unionville, Markham Village, Thornhill or Buttonville), its owner needs approval for any exterior alteration, so new glazing or cladding out front goes through that step before the permit proceeds. Inside, new partitions, washrooms, plumbing or structure need a building permit whatever the use, while paint and flooring on the same layout generally do not.

  • Yes. If the building is in one of Markham’s four heritage conservation districts, we first ask the City whether the sign counts as an exterior alteration, which there needs heritage approval. The drawings are a dimensioned elevation of the sign and, for a licensed restaurant or bar, a plan of the licensed area with its occupant load marked, both taken from the permit set so the figures match.

  • The request arrives as a comment in ePLAN, and the answer goes back the same way. If the doubt is structural, whether an old floor or roof can carry the new loads, our P.Eng inspects the framing and replies in a sealed letter, with any reinforcing drawn. If it concerns fire separations or exits, the code analysis sheet is revised to show the upgrades, and they go on the drawings before the set is resubmitted.

  • It turns on the occupancy and the building. Typically that means where the alarm devices go, the emergency lights, the exit signs, and sprinklers if the code calls for them. Those pages are drawn with the architectural and mechanical ones, so fire and building reviewers look at a single coordinated package.

Searched & answered

People Also Ask: what Markham searches about commercial permits.

Short answers to the commercial permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • It is the building permit for moving a building, or part of one, into a use with a higher hazard under the Building Code. It applies even when nothing is built. In Markham it starts with zoning, since a permit can be issued only for a use the governing by-law allows.

  • No. Paper applications are no longer accepted, and Markham now takes them only through its online ePLAN portal, so the sealed drawings, the code analysis and the forms are uploaded as digital files. Plan review runs in the portal, and when the examiner marks up a sheet, the corrected sheet and a reply go back the same way. We prepare the files and handle each resubmission.

  • Then the zoning has to change before a building permit can be issued. A small departure from the by-law’s standards can go to the Committee of Adjustment as a minor variance, while a use the zone doesn’t permit at all usually needs a zoning by-law amendment from Council. We prepare the drawings for a variance and coordinate with the City on a rezoning.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

Inside a Markham commercial building permit package

Examiners look at the code analysis before the drawings, so we do too. The unit is measured, the zoning is checked against your use, and the occupancy is classified under the Building Code, which fixes the fire separations, exits and washrooms. Only then do the floor plan, structural changes, mechanical and plumbing pages and the fire alarm, lighting and exit layouts get drawn.

Storefronts in Markham’s heritage conservation districts carry an extra step. Owners of every property in a district must obtain approval for exterior alterations, new construction or demolition, commercial buildings included, so a new storefront, new cladding or a changed facade there needs heritage approval before the permit can proceed.

Commercial permit rules in Markham: which by-law governs the unit

Whether your business may operate in a unit is a zoning question, and in Markham the first part of it is which by-law applies. The uses permitted in your unit are read from the by-law the City’s interactive zoning map assigns to that lot, which is not always Zoning By-law 2024-19, since that by-law does not reach every property. We confirm it before you sign a lease.

If the governing by-law does not list your use, a minor variance or a rezoning has to come first, since zoning is part of the law the permit is checked against.

Our drawing set carrying the City of Markham review stamp

One of the sets in our drawing samples is a Markham commercial project: an exterior cladding alteration on a church building. Its south elevation marks 967.66 m² of stucco for removal and replacement, and the City of Markham review stamp sits in the top right corner of that sheet.

The west elevation and wall section that go with it list the new EIFS assembly layer by layer, from the adhesive to the finish coat, so the installer builds and the examiner checks the same wall.

Contact us

Lease signed. Layout drawn. Permit filed.

Tell us the address and the use, and we’ll tell you what the city will ask for, on a free first call.

First consultation free(416) 990-9179