Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes
Custom homes in York Region and across the GTA start with the lot, its servicing, the energy route and the builder we coordinate. Our Haldimand County house went from the client’s sketch to occupancy.

What’s included
A new house is the one project where every discipline is ours from the start. The structural sheet never fights the mechanical one, and the office that drew both coordinates the build.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We walk the lot, check the zoning and any conservation or servicing constraints, and turn your brief or sketch into a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A building permit from the municipality, and the lot can add approvals that come first. A design that breaks a zoning limit needs its variance before the permit is issued, and a lot in a TRCA Regulated Area needs the TRCA permit or clearance in hand. Richmond Hill wants its grading and servicing plan prepared by an Ontario Land Surveyor or a P.Eng. Electrical work has its own ESA notification.
When a span or a point load is more than dimensional lumber can carry. Our P.Eng sizes each member for the house, the soil and the site, and the structural sheet shows which ones are steel or engineered lumber. The mechanical layout is checked against it, so a duct run is not drawn through a beam.
Yes. Fine Engineering also designs and permits additions and interior renovations. A later addition can start from the structure and the heat-loss calculations already done for the house.
It depends on the layout, so we choose it with the layout: the route sets the insulation levels, the window ratings and whether energy modelling is needed. The routes SB-12 allows are set out under Good to know.
Only if the chief building official issues a conditional permit for that stage, and the footing design has to be settled before you ask. The Code ties footing depth to the type of soil, so on clay or soil that is not clearly identified a soil report or site check comes first. What an early start puts at risk is set out under Good to know.
With the layout, in the same office as the structure, because ducts and drains need room in the framing. The heat-loss calculation runs on the same drawings and goes in with the permit set. A furnace, A/C and ventilation design for a new house on our project list came with energy efficiency calculations to Ontario standards. On the electrical side, the utility’s service layout has to come before the panel and service equipment, and it adds lead time.
Yes. We check first that the zoning allows a house and how the lot gets water, sewage and road access, then coordinate the approvals each one needs. Which ones apply is read from the lot when we walk it, before the layout is fixed.
A lot that can take it, to start. Zoning, how the lot gets water, sewage and road access, and the energy route are settled before the layout is, and a builder we coordinate has to hold the licence and Tarion enrolment. Once a permit is issued, a material change to the permitted plans must be filed with the chief building official and authorized, so we draw the change and file it before it is built.
The last inspections the permit lists, then the occupancy permit. The electrical close-out is separate: ESA issues a Certificate of Acceptance to whoever filed the notification once the installation is reviewed and passed, and it goes into the project file. We coordinate the inspections with the builder.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe house and the lot set it. Size, soil and foundation, structure, the energy route, the heating system and the finishes all move it, and a lot that needs a well, a septic system or a conservation approval adds work. Fine Engineering quotes the design and permit after the free first consultation, and the builder prices the construction.
Design and the permit come before construction, so the build is the later part of the schedule. The Code’s review period starts only once a complete application is filed, so an incomplete package stalls the job before any approval does. Approvals from outside the building department add time on top of that.
Aepex Electric, writing about a new build permit in Haldimand County, gave five stars and said Alex "did an amazing job". The 1,750 sq ft custom home on our project list in the same county went from the client’s sketch to occupancy, with the builder we coordinate doing the construction.
A heat- or energy-recovery ventilator swaps stale indoor air for fresh outdoor air and passes heat between the two airstreams on the way. A new house, or a permit with HVAC work, usually needs a mechanical ventilation design, and Toronto Building asks for one with every HVAC permit application. An HRV or ERV is the usual way to meet it. Fine Engineering sizes them in its HVAC designs.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
A custom home in York Region starts with the lot, not the drawings. The zoning by-law, any conservation authority’s regulated area and the way the lot gets water, sewage and road access are read first, because a permit is not issued until a needed zoning change or minor variance has been obtained.
Once the permit is issued, the builder we coordinate works from the stamped set while our engineer visits at each structural stage. The house is finished when the final inspections pass and the occupancy permit is issued.
On a house, the chief building official may issue a conditional permit for a stage of construction, such as the excavation or the foundation, before every requirement is met. The owner has to agree in writing to assume the risk and to restore the site if the approvals are not obtained.
So an early start is a bet on whatever approvals are still open. If any of them could fail, waiting for the full permit is the safer order, because the site has to be restored if they are not obtained.
SB-12 gives three routes to the energy efficiency requirement for housing: a prescriptive package, the performance method, or Energy Star or R2000. A new house lived in through the winter has to comply with one.
SB-12 also calls for a drain water heat recovery unit on shower drains, which affects the plumbing and framing layout, since a vertical unit needs room.
We design the house and coordinate its construction, and the building itself is done by a builder we coordinate. Ontario states that all new home builders and vendors must be licensed by the Home Construction Regulatory Authority, and a permit is not issued to an unlicensed builder or vendor applicant, so check the licence before a construction contract is signed.
The builder also enrols the home with Tarion before construction begins, which is why warranty enrolment is raised while the drawings and permit are still in progress. New homes carry 1-year, 2-year and 7-year warranties. After that the work divides plainly: we draw the set and file the permit, the builder builds from it, and our engineer visits at each structural stage.