
Your plan, drawn properly
Custom floor plans
Layouts developed from your sketch or brief, checked against zoning and the code, and drawn for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Vaughan, York Region
Custom homes in Vaughan, taken from a lot review to an issued permit by one P.Eng and BCIN office: the architecture, structure and HVAC drawn together, and construction coordinated with the licensed builder you hire.

What’s included
We hold every discipline from the outset on a new house and no other project. Structural never fights mechanical there, and the same office that drew both handles build coordination. In Vaughan the package goes to the City of Vaughan Building Standards Department, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps get the lot to an occupancy permit, and one office is answerable for each drawing.
Walking the lot, we look at zoning and at servicing or conservation limits, then draw a first layout from your brief or sketch.
Architecture, structure and mechanical systems are worked out together by one office, which files for permit and answers the city’s comments.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
Final inspections, the occupancy permit, and a house built to the drawings you approved.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179We won't give a per-square-foot figure without the lot, because in Vaughan the lot shapes it: taking down the old house, a grading permit, protected trees, heritage guidelines or a conservation-land check can all add design and site cost before construction begins. Then come the size, the structure, the systems and the finishes. Our design and permit work is quoted on its own, after a free consultation.
Construction length depends on the house and its builder, so it isn't fixed before design. The approvals in front of it are where Vaughan differs: the grading permit has to be obtained before the building permit application, and any Committee of Adjustment decision or Heritage Permit has to be settled earlier still. Once everything is in, the City's stated target for a house is 10 business days.
A demolition permit if a house is coming down, a grading permit from Development Engineering, and the building permit from Building Standards, which covers the plumbing and HVAC drawn into the set. Depending on the lot, a tree permit, a Heritage Permit or a Committee of Adjustment decision comes first. We prepare the drawings for each and file them in the right order.
Only if it sits inside the Kleinburg-Nashville Heritage Conservation District; a Kleinburg address alone doesn't settle it. Inside the district, a new house needs a Heritage Permit and is designed to the district guidelines, and Heritage Review may sit ahead of the building permit or beside it, with some files going to Council.
It can; the slope is what makes a walkout possible. The design question is grading: where water goes around the new opening, and how the finished grades meet the neighbours' lots. Vaughan reviews that through the grading permit, which comes before the house permit on a new home, so the walkout is settled on the grading plan first.
It can. Vaughan refers owners whose property abuts open space conservation lands to the Toronto and Region Conservation Authority for any additional restrictions, and a compliance letter from the City lists any TRCA or Oak Ridges Moraine conditions. Before the design is set, the lot is checked against TRCA mapping, since a restriction can move the footprint.
Design and approvals can run through any season, so the useful aim is to have the permits in hand when the ground can be excavated and the foundation poured. The grading permit and any tree permit come first on a Vaughan lot, which makes them worth starting early.
Not for a house. A designer with a BCIN in the right category is allowed to prepare a house's architectural drawings, and our engineer, who holds BCIN qualifications and a P.Eng licence, also prepares and stamps the structure and HVAC. You can still bring in an architect if you want one; we'll engineer and permit their drawings.
Yes. We check them against the zoning for the lot, the City's grading requirements and the Building Code, add the structural and mechanical design, and revise whatever doesn't fit. Plans drawn for another lot need the closest look at setbacks and grading.
Yes. Planning a second unit into a new house is simpler than adding one later: ceiling height, a separate entrance, the fire separation and HVAC for two units are designed from the start. Whether the City allows a suite on the lot is checked at the lot review, before the plan depends on it.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA production home is built from a builder's set plans, usually in a new subdivision. A custom home is designed for one owner and one lot, which in Vaughan can be an infill lot where an older house comes down first.
Owners can, by arrangement with the builder and under the site's safety rules. Fine Engineering's engineer also returns at the stages the permit sets where general review is required, so questions raised on those visits go to the person who designed the work.
Either can be used; it is a term of the construction contract with whoever builds the house. On the design side, Fine Engineering quotes the drawings, engineering and permit as a defined scope, and any change during construction gets a price and a drawing before anyone builds it.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
A new house in Vaughan runs on approvals as much as on construction: lot and zoning review, a grading permit, then the building permit, with tree, heritage and conservation checks where the lot has them. Fine Engineering does the design side in one office (architecture, structure, HVAC and energy calculations, the permit drawings and the application) and coordinates construction with your builder to the plan you approved.
Whoever builds the house needs a licence from the Home Construction Regulatory Authority, so check it before signing a construction contract. Ontario requires one of every new home builder, and the home has to be enrolled with Tarion before construction begins. If you'd rather, you can hire us for the design and the permit alone.
On an infill lot, the existing site sets the brief: where the old foundation sits, the trees, the grades, and the setbacks the new footprint must keep. We start from a survey and a zoning read, then design the house to fit the lot rather than forcing a stock plan onto it.
One point to settle early on a teardown: Ontario warns that a new home sitting on old footings or an old foundation may fall outside the new home warranty, so whether the old foundation stays is decided before the design depends on it.
For a new home on an existing lot, Vaughan wants the grading permit from Development Engineering in hand before the building permit application is submitted to Building Standards. The site grading plan therefore leads the schedule: once the footprint and the height of the ground floor are fixed, it is the first sheet we finish.
Once the grading permit and the rest of the set are in, the City's stated target for a complete single-family application is 10 business days. The count waits for completeness, so the order runs lot review, grading plan, then the full house set.
A new house that misses a required setback can't get its building permit until the Committee of Adjustment has amended the zoning for the lot, with the application going in through the City Clerk's office. We look for the shortfall at the lot review and design around it, but where relief is worth seeking, the drawings are prepared for the Committee first.
In Kleinburg-Nashville, Maple, Thornhill and Woodbridge, a lot inside the Heritage Conservation District needs a Heritage Permit, and the new house follows the district guidelines on its garage doors, brick colour, windows and similar details.
Trees with a diameter of 20 cm or more are protected in Vaughan, and a new house that would injure or remove one needs a Construction (or Infill) Permit first. The arborist report, the tree protection kept up through construction and any design changes to keep the footprint clear of roots all land in the budget, so we map the trees from the survey at the lot review.
Contact us
Free first call: bring the lot address and a sketch, and we go through what it needs.
First consultation free(416) 990-9179