
Your plan, drawn properly
Custom floor plans
Plans drawn for permit, starting from your brief or sketch, checked against the code and zoning.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Newmarket, York Region
Custom homes in Newmarket, drawn and engineered in our office from your sketch: floor plans, structure, heating and the energy design the permit asks for. We take the set through the Town’s permit and work alongside the licensed builder you choose, with the engineer who designed the frame on site at each structural stage.

What’s included
We hold every discipline from the outset on a new house and no other project. Structural never fights mechanical there, and the same office that drew both handles build coordination. In Newmarket the package goes to the Town of Newmarket Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps from the lot to the occupancy permit, with one office answering for every drawing.
We go over the lot and its zoning, conservation and servicing constraints, then use your brief or sketch for a first layout.
Architectural, structural and mechanical drawings developed together in one office, then filed for permit and followed through the city’s comments.
We coordinate a builder for excavation, foundation and framing, envelope, rough-ins, then finishes, and the engineer visits each structural stage.
The occupancy permit, final inspections and a house matching your approved drawings.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The house sets most of it: size, finishes, the systems chosen and the site work the lot needs. The ground under Newmarket is mostly sand and gravel left by the glaciers, deep and without rock outcrops, so the footings, any excavation support and the drainage are designed for granular soil. Our part, the design, engineering and permit, is quoted once there is a design to measure, after a free first consultation, and the builder you hire prices the construction.
Each lot and each house runs to its own schedule. Design and the permit come first, and the Building Code sets a review period for a house permit that starts once the application is complete. Anything that must be approved before that, such as a variance, a tree permit or heritage review, adds to the front of the schedule. We give a schedule with the quote and update it as the Town responds.
The house itself goes on a building permit, since the Town lists a new home among the projects that need one, and the drawings are filed through its Development Portal. The lot decides the rest: a removal permit and an arborist report for any regulated tree the footprint takes, heritage review on Lower Main Street South or a designated property, conservation-authority review near the East Holland River, and a variance if the design misses a zoning limit. Wiring is permitted separately by the Electrical Safety Authority.
Not if the design fits, and we find that out at the sketch stage. The new house’s height, footprint and coverage are tested against the governing by-law before floor plans are drawn, so a shortfall shows up as a choice: a smaller or reshaped house, or a Committee of Adjustment application. If you choose the variance, Newmarket can’t issue the building permit until the Committee grants it, so it moves to the front of the schedule.
They can. The East Holland River is Newmarket’s main river, and a lot beside it or one of its tributaries can fall under conservation authority rules. Land in the southwest of town lies in the Oak Ridges Moraine and can carry Moraine planning constraints instead. Both shape where the house can sit, so we check them before the footprint is fixed.
Yes, for exterior work. Lower Main Street South is Newmarket’s one heritage conservation district, and designated properties on the Town’s heritage registry also need permits for some kinds of work. A new house there goes through heritage review alongside the building permit, which can shape the materials, so we talk to the Planning Department before the design is drawn.
Mostly in who does the approvals. A subdivision house comes on a lot that was zoned, graded and serviced for it before you bought. A custom house on an existing Newmarket lot has to clear those questions itself: the by-law that governs the lot, any regulated tree, the driveway’s maximum width for the house type, and a variance if the design needs one. That front-end work is where most of our part of a custom home sits.
Often, yes. Provincial planning law allows three units on a serviced urban lot, one of them in a separate building, and planning the suite with the house means the services and grading are drawn once. In Newmarket the parking for the extra unit has to fit inside the maximum driveway width for the house type, so the site plan settles that early.
Not for a typical house, which Ontario lets a BCIN-qualified designer draw, so an architect is a choice rather than a requirement. Our set comes from a small team: Alexander Cardenas Fernandez, P.Eng, is responsible for the drawings and the structure under his BCIN, Mijal Artica prepares the heating, cooling and energy design, and Anton Reznikov checks the set against the Building Code. If you have hired an architect, we work from their drawings instead.
Yes. The foundation sheets are ours whatever the plans show, because the footings and any excavation support are designed for the ground Newmarket actually sits on, deep glacial sand and gravel with no bedrock. Above grade we test the plans against the by-law for your lot and lay the driveway inside the Town’s maximum width for the house type, then add the structural, heating and energy sheets the permit needs. Any change the lot forces is made with you.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationFor a new house, the design, engineering and permit are done in-house. Construction is coordinated with the builder, with the engineer on site at each structural stage. Fine Engineering’s full design-build model, one firm under one contract, applies to its renovations, additions and second units.
A survey and a zoning check for the lot, then a design drawn to the governing by-law and a building permit. Any house already standing there needs a demolition permit first. Then a builder licensed to build it, and inspections at each stage through to occupancy.
The municipality enforces the Building Code through the permit and its inspections, the HCRA licenses builders, and Tarion administers the new home warranty. A house built under contract by one builder doing all the work is covered by the 1-year, 2-year and 7-year warranties; one built on existing footings or foundations may not be.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
We take the house from your sketch to a permitted set, then stay with it while it is built. It starts with a walk of the lot and its zoning, then floor plans and elevations. Our P.Eng designs the foundations, framing and roof, our mechanical designer sizes the heating and cooling and prepares the energy efficiency design the permit needs, and the grading and servicing drawings go in with the set.
Once construction starts, we work alongside the builder, and our engineer, who designed the structure, visits at each structural stage through to occupancy. Whoever builds the house has to hold a licence from Ontario’s Home Construction Regulatory Authority and enrol the home with Tarion before construction begins, so ask for both before you sign.
A rebuild on a lot you own needs a demolition permit before the new house’s permit. The existing foundation is reused only when our P.Eng is satisfied it can carry the new house; otherwise a new one is designed with it. An infill lot also has to meet the neighbours’ grades at the lot lines, which can set the foundation height before the elevations are drawn.
Two Newmarket rules shape the site plan. Any private tree measuring 20 cm or more across at chest height (1.4 m) is regulated, so removing one for the footprint needs a permit and an arborist report, and the Town may take a deposit to protect the rest during construction. A new driveway has to stay within the maximum width for the house type, generally 6.0 m for a single-detached house.
Newmarket has two zoning by-laws, By-law 2010-40 as the parent and a second for the Urban Centres, 2019-06, and a new house follows whichever one applies to its lot. If the lot is in the Oak Ridges Moraine area, the Town refers zoning questions to its Planning Department, so that call comes before the design is fixed. Height, setbacks and lot coverage all follow from the answer.
Contact us
Free first call: bring the lot address and a sketch, and we go through what it needs.
First consultation free(416) 990-9179