Residential Permits · Newmarket, York Region

Permit Drawings in Newmarket

Permit drawings in Newmarket for houses and the work done to them: we measure the building, draw the architectural, structural and HVAC sheets under our BCIN and P.Eng credentials, file the set with the Town and reply to its examiner at no extra charge.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Flat-roofed rear addition clad in white boards, with a four-panel glass slider opening onto a new concrete patio
City requests
Handled at no extra charge
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
From our office
About 30 minutes
Fig. 01 · Flat-roofed rear addition clad in white boards, with a four-panel glass slider opening onto a new concrete patioRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Our most frequent residential jobs come in four kinds, and each gets one package: measured drawings, zoning and code checks, structural design when the job calls for it, and the submission, which we stand by until the permit issues. We draw Newmarket packages to the checklist of the Town of Newmarket Building Division, the office that receives them.

  • Open-plan kitchen and dining room after a renovation

    Interior & exterior

    Renovation & demolition permits

    Load-bearing wall removal, a more open floor plan, a new deck, porch or pool, or removal of a tree where by-law protection applies.

    • Load-bearing wall removal
    • Deck, porch & sunroom permits
    • Pool enclosure permits
    • Demolition & tree removal permits
  • Legal basement apartment with a kitchenette

    Rental income

    Legal basements & second units

    A basement unit the city signs off on needs the right ceiling height, fire separation and egress, HVAC for two units and its own entrance to code.

    • Separate entrance design
    • Fire separation & egress
    • Kitchen & bathroom layouts
    • HVAC for two units
  • Two-storey garden suite framed in a Toronto backyard

    New floor area

    Additions, garden suites & custom homes

    Rear and side additions, second storeys, detached garden suites and full custom homes, with the zoning check done before the first line is drawn.

    • Zoning & setback review
    • Rear, side & second-storey additions
    • One- & two-storey garden suites
    • Custom home permit sets
  • Vaulted addition with exposed timber rafters

    Stamped in-house

    Structural design for the permit

    The structural and architectural sheets go in one package, since a P.Eng of our own sizes the framing, posts, beams and footings and stamps them.

    • Wood framing design
    • Steel beam & post sizing
    • Foundation & underpinning
    • Site review letters

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Existing drawingsThe house measured as it stands
  2. Plans, elevations, sectionsThe proposed design
  3. Site planSetbacks and lot coverage
  4. Structural drawingsP.Eng stamped where required
  5. HVAC, plumbing, electricalWhere the scope needs them
  6. Permit applicationCompleted and submitted to the city
  7. City comments answeredUntil the permit is issued

How it runs

Process: 4 steps from first call to sign-off.

Four steps, one team. The engineer who measures the house is the one who signs the drawings.

  1. Consultation & site visit

    Your first consultation is free. We go through the house, measure what’s there, hear what you’re after and say which permits apply.

  2. Zoning & code review

    Before drawing, we check the lot against the zoning by-law and the plan against the Ontario Building Code, so nothing goes to the city that will bounce back.

  3. Drawings & engineering

    Architectural, structural and mechanical sheets are drawn in one office, cross-checked, and stamped by our P.Eng and BCIN designers.

  4. Submission & city comments

    Examiner comments cost you nothing extra. We file and track the application and answer each comment until the permit is issued to you. The same team builds it if you’d like.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address
  • What you want done, in your own words
  • A lot survey, if you have one
  • Any existing drawings or previous permits
  • Photos of the areas involved
  • Any letters or orders from the city

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: residential permits in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • There is no list price; we quote once the scope is clear, after a free first consultation. The figure moves with the number of sheets and disciplines, whether you already have a survey or old plans of the house, and how much zoning work comes before the drawing, such as a variance package when the design misses a setback. The Town’s own permit fee is separate.

  • The drawing time follows the size of the set, and the Town’s review starts only when the application is complete. Planning can add a step before that. If the design goes past a setback, height or coverage limit, Newmarket’s Committee of Adjustment has to grant a variance before the permit can be issued, and that decision comes ahead of the permit clock. We tell you at the zoning check whether your schedule includes it.

  • Most work that changes the house rather than its surfaces. Newmarket’s own list starts with a finished basement, an addition, a deck attached to the house and any detached building over 15 square metres. Each needs a different set: a basement apartment the fullest, with fire separations, exits and heating drawn; a wall removal the beam and its posts; a deck its footings and framing. Painting, flooring and cabinet swaps in the same layout need no permit.

  • Two names. Yours goes on the application as owner, and Newmarket checks it: a buyer can apply before taking possession, but the permit is only issued once a copy of the deed shows the house is theirs. Ours goes on the drawings, with the BCIN designer’s registration and the P.Eng seal on the structural sheets, and we upload the set through the Town’s Development Portal and answer the examiner from there.

  • Photos and a few lines on what you want are enough to book the site visit, where we measure the house ourselves, and old drawings or an earlier permit for the house save time. What the address adds is the zoning answer: which of Newmarket’s two by-laws governs the lot, and whether it is a Moraine-area lot that needs the Planning Department’s word before we design.

  • Yes, and the examiner’s comments tell us what kind of job it is. A Building Code comment is fixed on the sheets and answered in the same Development Portal file. A zoning comment can mean the design needs a variance from Newmarket’s Committee of Adjustment, a separate planning application that has to be decided before the Town can issue the permit, so we read the lot’s by-law before replying.

  • They can. Along those two corridors the Town works from its Urban Centres Secondary Plan, under which most new development in the Yonge and Davis growth centre comes through redevelopment of the corridors, and from Urban Centres Zoning By-law 2019-06. Between them they govern what a property there may be used for and the form a building can take, and they can add an approval ahead of the permit, so we check both before drawing an addition or a second unit.

  • On a lot near the East Holland River or one of its tributaries, or in the Oak Ridges Moraine in the southwest of town, yes: the survey shows how close the work comes to land that can carry conservation-authority or Moraine planning limits, and we check those before fixing the footprint. Elsewhere it’s needed when the footprint or the setbacks change, and work inside the house is drawn from our own measurements.

  • For an unpermitted second unit in Newmarket, the site plan decides whether the rest is worth drawing: the Town wants one outdoor parking space for the unit on top of the house’s two, inside the permitted driveway width and perpendicular to the street. If the driveway can take it, we draw the unit as built, mark the corrections the Building Code needs on the same sheets, and upload the set through the Development Portal.

  • The gap is widest on Lower Main Street South, the Town’s one heritage conservation district, and on designated properties. There the architectural side of an exterior change, its elevations and materials, goes through heritage review alongside the building permit, and the Town asks owners to talk to its Planning Department before making changes. Elsewhere in Newmarket the architectural sheets are simply part of the permit set, which the examiner reads together with the site plan and any engineering.

Searched & answered

People Also Ask: what Newmarket searches about residential permits.

Short answers to the residential permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Whenever the permit drawings are not prepared by the owner, an architect or an engineer. A BCIN is Ontario’s Building Code Identification Number, the registration for designers qualified to prepare permit drawings, granted one category at a time. Fine Engineering’s engineer is BCIN-qualified for Small Buildings, Structural and HVAC work as well as being a P.Eng.

  • A completed application form, the permit drawings, any engineering and the supporting documents the project relies on. All of it is submitted through the Town’s online Development Portal, which is also where the application is tracked until the permit is issued. We put the package together and upload it.

  • The owner, if they have the skills and know the Building Code. Otherwise, a BCIN-registered designer, or a member of the Ontario Association of Architects or of Professional Engineers Ontario. To check a designer, look them up on the province’s QuARTS public registry, which lists each one’s categories. Engineers are listed on the PEO register.

  • Often, yes. The opening needs a beam sized for the load above, posts under each end and a path that carries the load down to the foundation. The Building Code’s span tables cover some simple cases, but once the beam falls outside them, a licensed P.Eng has to design and stamp it. Fine Engineering prepares the engineering and the permit drawings together.

  • Not reliably by looking at it. A wall that runs across the floor joists, sits over a beam or another wall below, or stands near the middle of the house is more likely to carry load. Only the framing above and below confirms it, which is why Fine Engineering checks the structure on site before designing any removal.

  • That depends on the span and the load above. Engineered wood handles many household openings and is simpler to install, while steel carries a longer span in a shallower depth, which helps when the owner wants a flush ceiling. Fine Engineering sizes both options and recommends the one that suits the opening, the ceiling and the budget.

Good to know

Permit drawings in Newmarket: what the set holds

The jobs the Town of Newmarket names as needing a permit are the ones a house set is drawn for: a basement being finished, an addition or a whole new house, an attached deck, and any detached structure over 15 square metres. Wall removals, basement apartments and garden suites join them, since each changes the structure or adds a dwelling.

Every set begins with the house measured as it stands, then plans of it now and as proposed, elevations, sections and a site plan of setbacks and coverage. Structural sheets follow wherever a beam, footing or opening changes, and HVAC and plumbing sheets wherever the layout moves them. The structure is sealed by our engineer, who is licensed as a P.Eng and BCIN-qualified for Small Buildings, Structural and HVAC work.

Architectural drawings for a Newmarket townhouse duplex

The Newmarket review on our site is from Cristian Chan, whose townhouse we converted into a duplex. Our permit drawings for that job also covered taking down walls so the living room could open up, and he notes that Alex walked him through the zoning bylaws and the construction process during the renovation.

A conversion like his puts two kinds of drawing into one set: the layout for a second home inside the building, and the structure that replaces the walls coming out. We draw both in one office, so the examiner reviews them as one application.

Newmarket permit drawings and the two zoning by-laws

Every set is drawn to one of two zoning by-laws. By-law 2010-40 is Newmarket’s parent zoning by-law, By-law 2019-06 governs the Urban Centres, and a property in the Oak Ridges Moraine area goes to the Town’s Planning Department for its zoning. The site plan in your set is checked against whichever applies, so we confirm it before measuring a single setback.

Contact us

Measured. Drawn. Submitted.

Tell us what you’re planning at home and we’ll tell you which permits apply, on a free first call.

First consultation free(416) 990-9179