Site Engineering · Newmarket, York Region

Grading Plans and Site Engineering in Newmarket

Grading plans in Newmarket, prepared and stamped by our P.Eng: existing and proposed grades, swales, drainage and sediment control around a new house, an addition, a garden suite, a pool, a walkout or a wider driveway, with Committee of Adjustment packages when a lot needs relief.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sod
Deliverable
Grading & site plans
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
From our office
About 30 minutes
Fig. 01 · Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sodRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

Site plans are reviewed apart from the building permit, by another department with its own criteria. We make the lot design meet them first, then see it through with the reviewer who uses them. Newmarket packages are filed with the Town of Newmarket Building Division. We draw them to that department’s checklist.

  • Grading plan sheet for a site in Guelph

    Drainage & runoff

    Grading plan

    Lot elevations as they stand and as proposed, swales, the way water drains, runoff calculations and sediment controls, for a building permit, a pool or site alteration.

    • Lot grading & drainage design
    • Runoff analysis & calculations
    • Erosion & sediment control
    • Surface drainage details
  • Lakeside deck and walkout with landscaping

    Backyards

    Pool & landscape design

    Outdoor living areas, porches, pergolas and driveways that meet code, plus a pool’s permit and the grading it brings.

    • Pool enclosure permits
    • Backyard & landscape layouts
    • Driveways & hard surfaces
    • Pergolas, porches & lounge areas
  • New concrete driveway curving up to a house at dusk

    Earthworks

    Site alteration permits

    Approvals for excavation, cut and fill, major landscape changes and the accessory structures that go with them, under the municipal site alteration by-law.

    • Excavation & cut-and-fill plans
    • Major landscape changes
    • Garages & accessory structures
    • Demolition & site removal
  • New custom home on its lot

    Committee of Adjustment

    Zoning plan approval

    When a project asks for relief, it needs minor variance drawings and coordination with authorities. Either way, we run its site layout and development plans past the zoning by-law.

    • Site plans & development layouts
    • Zoning review & minor variances
    • Committee of Adjustment packages
    • Coordination with the city and the conservation authority

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Grading planElevations, swales and drainage
  2. Stormwater notesRunoff calculations for the city
  3. Erosion control planFor the construction period
  4. Site alteration permitDrawings and application
  5. Pool permit drawingsEnclosure and grading
  6. Site planSetbacks, coverage, variance sketches
  7. Committee of AdjustmentPackage, coordinated with the city and conservation authority

How it runs

Process: 4 steps from first call to sign-off.

Approval comes four steps after the survey. We plan the site to drain, then see it through the department doing the review.

  1. Survey & site review

    We begin with the lot’s topographic survey. Walking it, we note where water runs now: any catch basins, swales, downspouts and the neighbours’ grades.

  2. Zoning & by-law check

    We check setbacks, lot coverage, the by-law governing site alteration and hard-surface limits first, so our plan follows the rules it gets reviewed against.

  3. Grading & drainage design

    The proposed swales, elevations and slopes hold the runoff on the lot until it drains to the street or to a storm connection. If the city asks, calculations follow.

  4. Submission & approvals

    A building permit or a site alteration application carries the grading plan we file. Reviewer comments get answered at no extra charge. We coordinate with a conservation authority if one is involved.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Address and a current topographic survey
  • Your plans: building, paving or regrading
  • Another designer’s pool or architectural drawings
  • Photos of low spots and boundaries
  • City comments or conservation authority letters
  • Catch basins, downspouts, storm connection

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: site engineering in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • In Ontario, a Committee of Adjustment rules on minor variances under section 45 of the Planning Act. It can grant one only if the variance is minor, desirable for the proper use of the property, and in keeping with the general intent of both the zoning by-law and the official plan. A Newmarket lot ends up there when a project breaks a zoning limit, a setback for example. Before applying, we check whether Ontario’s newer reading of setbacks at 90 per cent on urban residential land already covers the shortfall.

  • The lot itself: its size and slope, how much of it the project regrades, whether runoff calculations are needed and whether a conservation authority is involved. The ground has a say too. Under Newmarket lies a deep blanket of glacial sand and gravel, and no bedrock comes to the surface anywhere in town, so excavation and drainage are designed for granular soil. Survey costs and the Town’s fees are not in our figure, which comes after a free first consultation.

  • It depends on which approvals travel with it. A grading plan filed with a building permit is reviewed with that application, while anything needing a variance waits for the Committee of Adjustment, and a regulated tree in the work area needs its own permit first. We map out which of these apply at the start and give a schedule with the quote.

  • A grading plan goes with most projects that change the footprint or the grades. A site alteration permit is a separate matter: Ontario’s Municipal Act lets each municipality require one for placing fill, removing topsoil or changing the grade, and each uses that power its own way. We check how Newmarket applies it to your project before any soil moves.

  • Possibly, even with nothing being built. Whether yours does depends on how the Town applies its powers over fill and grade changes to backyard work, which we check for the address. A recent survey and photos of the low spots and the boundaries with your neighbours are enough for us to tell you what the job involves.

  • A walkout means grading the yard down to the basement floor so a full-height door can open onto it. That changes how the lot drains, so municipalities generally want a grading plan with it, and some also want a site alteration permit. We design the walkout’s grading together with the structure of the new opening and the permit drawings.

  • Up to the Town’s maximum for your house type. Newmarket’s general limit is 6.0 m for a single-detached house, 5.2 m for a semi-detached one and 3.0 m for a townhouse, and Planning confirms it for each property. A wider driveway also sheds more water, so our drainage design shows where the extra runoff goes, toward the street or a swale rather than the house.

  • The Town’s comments vary from lot to lot, so we file plans that already meet its published rules. In Newmarket that means three checks before the plan is uploaded through the Development Portal: downspouts and yard catch basins discharge to the surface or a storm connection, never the sanitary sewer, which the Town links to basement flooding; a new or wider driveway stays inside the maximum width for the house type; and regulated trees near a grade change are shown. Comments that come anyway are revised and answered at no extra charge.

  • Start with where it sits. Lots near the East Holland River, Newmarket’s main river, or one of its tributaries, and land in the southwest of town, which lies in the Oak Ridges Moraine, can carry conservation authority or Moraine planning constraints. We check the authority’s regulated-area mapping and the Moraine rules before any grade is fixed.

  • Often. A pool changes the grades around it, so a grading plan commonly travels with the pool permit. We confirm what the Town wants for your address, then design the pool’s grading with the rest of the yard so runoff stays on your lot or reaches the street.

Searched & answered

People Also Ask: what Newmarket searches about site engineering.

Short answers to the site engineering questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • It is the shape given to the ground around a house so that water leaves it. On a Newmarket lot the grading also decides where that water ends up: a swale, the street or a storm connection, but never the sanitary sewer, which the Town says is put at risk of overloading when downspouts or catch basins are tied into it.

  • The levels, the swales and the outlet of every downspout and catch basin, drawn over the survey. On a Newmarket lot taking a second unit there is one more item: the extra outdoor parking space, which has to fit inside the maximum driveway width, and where the runoff from that added hard surface goes.

  • Placement is the site plan’s job: the building footprint, setbacks, lot coverage, parking and the driveway. Levels and drainage belong on the grading plan. On the Yonge Street and Davis Drive corridors, a site plan is also read against the Urban Centres Secondary Plan and zoning, which can change what the lot may hold.

  • Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.

  • Permission from the municipality’s Committee of Adjustment to depart slightly from the zoning by-law, for example a smaller side yard or a little more lot coverage, without rezoning the property. The Committee has to be satisfied that the change is minor and meets the other tests the law sets, and a bigger change needs a rezoning instead. Fine Engineering draws the plans and handles the application.

  • On most serviced urban residential lots in Ontario, yes. Since Bill 23, the Planning Act stops a zoning by-law from prohibiting up to three units there, which can be the house, a basement unit and a unit in a backyard building. Lot size, setbacks and servicing still decide whether both fit, and each unit needs a permit. Fine Engineering designs both units and confirms the zoning allows the pair.

Good to know

Grading plans in Newmarket: when one is needed

A grading plan usually comes into a Newmarket job when the footprint or the ground changes: a new house, an addition, a garden suite, a pool, a walkout or a wider driveway. It shows existing grades from the survey, the proposed ones, the swales, sediment control and, where asked, runoff calculations. A detached second unit adds servicing, because the Town allows one subject to its servicing standards for water and sewer.

Every plan answers one Ontario Building Code test: water must not collect at or near the building or harm the properties next door. Our P.Eng prepares and stamps the plan, and we confirm with the Town what it needs for your kind of project before starting.

Driveways and downspouts on a Newmarket grading job

Newmarket caps driveway width by house type: a single-detached lot generally gets 6.0 m of driveway, a semi 5.2 m and a townhouse 3.0 m, with Planning confirming the figure for each property. Added parking, such as the outdoor space each additional unit needs on top of the house’s two, has to fit inside that width and run perpendicular to the street.

Downspouts get the same attention. The Town counts catch basins or roof downspouts connected to the sanitary sewer as inappropriate connections that overload the pipes and raise the risk of basement flooding, so our drainage design sends roof water to the surface or a storm connection and keeps it off the sanitary line.

Regulated trees and the grading schedule in Newmarket

A tree in Newmarket is regulated once its trunk reaches 20 cm in diameter at 1.4 metres above the ground. If a grade change or an excavation means removing one, a Town permit backed by an arborist report comes first, and the Town may hold a deposit to protect the trees that stay while construction goes on. We plot the trees from the survey before setting grades, so the plan can work around them.

Contact us

Survey in. Grades set. Water where it belongs.

Send the survey and your plans and we will say what the city needs, on a free first call.