Home Additions · Newmarket, York Region

Home Additions in Newmarket

Home additions in Newmarket, from one more room at the back to a full second storey or a separate unit to rent out, with the structure designed and stamped by our P.Eng and the build done by our own crew.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Two-storey rear addition clad in pale grey boards and joined to the original red brick, a sliding door onto a patio
Recent project
London · duplex unit
Municipality
Newmarket, York Region
Permit office
Town of Newmarket Building Division
From our office
About 30 minutes
Fig. 01 · Two-storey rear addition clad in pale grey boards and joined to the original red brick, a sliding door onto a patioRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

We design the joints between old and new first, since that is where an addition is judged: the beam opening the wall, the roof tied into the old one, the ducts reaching new rooms. Newmarket packages are filed with the Town of Newmarket Building Division. We draw them to that department’s checklist.

  • Cedar-clad entry addition with a standing-seam roof

    Ground floor and up

    Rear & side additions

    Bedrooms, kitchens and family rooms built at the rear or side, with new foundations joined to old.

    • Foundation & footings
    • Tie-in to existing structure
    • Roof junctions
    • Matching or contrasting exterior
  • Wood-framed addition going up against a house

    A second home in the house

    New duplex units

    An addition built as its own unit, with the separations, services and entrance a second dwelling requires.

    • Unit layout & entrance
    • Fire separation
    • Second kitchen & bath
    • Separate metering options
  • Vaulted addition with exposed timber rafters

    Opening the old wall

    Beams & columns

    Our P.Eng designs and stamps the beams, posts and footings: the structure that joins new space to old.

    • Beam & column design
    • Foundation design
    • Second-storey load checks
    • Temporary shoring
  • Ductwork run across a ceiling

    Reaching the new rooms

    Mechanical tie-ins

    The addition is served on par with the house, its electrical, plumbing, heating and cooling extended or upgraded.

    • Heat-loss check for the larger house
    • Duct extensions or a second system
    • Plumbing & DWV extensions
    • Panel capacity & circuits

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

05 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Site visitThe house measured and drawn
  2. Zoning checkSetbacks, coverage and height
  3. Permit drawingsArchitectural, structural, HVAC, electrical
  4. Grading planWhere the City asks for one
  5. Building permitFiled and followed to issue
  6. ConstructionOur crew, foundation to finishes
  7. Inspections & close-outThe permit closed when it’s done

How it runs

Process: 4 steps from first call to sign-off.

Of four steps, the slowest is the tie-in to your occupied home, and it is planned around you.

  1. Site visit & zoning

    We cover the by-law’s allowances, the house and lot measurements, and the foundation and framing that the addition ties into.

  2. Design & permit

    Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.

  3. Build

    Excavation, foundation and framing go in, the existing house is opened, then rough-ins and the exterior, then finishes, all inspected.

  4. Close out

    Permit closed after final inspection, house returned as one building.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Address, plus a survey if you have one
  • What you want to add and where
  • Photos of the wall and yard it joins
  • Any existing drawings or previous permits
  • Whether it is for you or a rental

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: home additions in Newmarket, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Size, the number of storeys, how much of the house is opened and the finishes set it. The foundation is the part your choices change least, and Newmarket stands on deep glacial sand and gravel without rock outcrops, so the footings and the excavation are designed for granular soil. A variance or a new heating system adds its own line. We itemize the addition after the site visit.

  • First we measure the house and lot, read the zoning and look over the foundation and framing the addition will join. Then the plans, structure, HVAC and electrical are drawn and filed for permit. The build runs from excavation and foundation to framing, the opening into the house, rough-ins and finishes, with inspections throughout, and ends with the permit closed.

  • The lot decides how much comes before the permit. A Moraine-area lot waits for the Planning Department’s zoning answer, a heritage property for its review, a design past a setback for the Committee of Adjustment, and a regulated tree of 20 cm or more near the footprint for a removal permit and an arborist report, sometimes with a deposit. Then the set goes in through the Town’s Development Portal. On site, the size of the addition and whether it goes up or out set the pace, and the dated schedule comes with the quote.

  • Newmarket puts additions on its list of projects that need a building permit, so yours will need one. A variance comes in only if the design breaks a limit in the by-law for your lot, a side setback or the height cap for instance; the Committee of Adjustment then has to grant it before the Town issues the permit, and the zoning check tells you which case you’re in before the drawings are finished.

  • Look at the back yard first. A regulated tree, 20 cm or more across at 1.4 m, where a ground-floor addition would go, or a lot by the East Holland River or one of its tributaries with conservation-authority limits, can shrink the footprint or rule it out. Going up spares the yard but loads the house you have, and postwar houses near Newmarket’s core often need their structure strengthened before a storey goes on.

  • The schedule marks the stages that are hard to live through. In a postwar house near Newmarket’s core, one of them is the tie-in: if the old panel or ducts have to be upgraded to serve the new rooms, the heat or power is off while that is done. A second storey adds a stretch with the roof open, when staying elsewhere is worth discussing.

  • Yes. Concrete can go in during cold weather if it is protected while it cures, and framing is not held up by the season. Digging and exterior work are easier outside winter, so the schedule puts them there where it can.

  • First we check whether it really misses: on urban residential land Ontario now reads minimum setbacks at 90 per cent of the stated distance. If it still does, the addition goes to Newmarket’s Committee of Adjustment for a variance, which has to be granted before the permit. One design feeds both the variance drawings and the permit set, so anything the Committee changes is carried onto each.

  • That is your choice. We can match the roof slope, exterior cladding and window sizes of the house, or design something that contrasts with it on purpose. The detail that matters either way is the seam with the old roof and walls, which is drawn to keep water out.

  • We calculate the heat loss of the whole house with the addition, which shows whether the furnace and air conditioner have the capacity and whether the ducts can be extended or a second system is needed. Plumbing is drawn on the same permit, and an electrical load calculation shows whether the panel can take the new circuits.

Searched & answered

People Also Ask: what Newmarket searches about home additions.

Short answers to the home additions questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Most of the early work happens in the back yard. The footprint has to clear the rear setback in the by-law for the lot and stay clear of any regulated tree, or carry a removal permit and arborist report if it can’t. Its footings go into Newmarket’s deep sand and gravel, designed for granular soil, and on a heritage property the back elevation can still need heritage review.

  • Often a main-floor bedroom, a larger kitchen or a separate rental unit. The last can bring in income, since Ontario’s planning law allows up to three homes on a serviced urban lot. The firm’s Director, a Broker of Record, can say what the new space may be worth at resale.

  • The foundation, plus the walls and beams that will carry the new floor. The ceiling joists in place now were sized to hold up a ceiling, not people and furniture, so a new floor structure usually goes above them. Some houses carry the storey on new posts and beams; others need part of the foundation reinforced first.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

Good to know

What a home addition in Newmarket includes

Rear and side additions go on new foundations tied to the old house; a second storey sits on the existing structure, usually after reinforcing it. Either way, most of the engineering is at the seam between new and old: the beam that opens the existing wall, the roof that joins the old one and the ducts that reach the new rooms. We design those joints first.

Some additions add a second home rather than more rooms: a rental unit with its own entrance and the fire separation and exits the Building Code asks of a dwelling. We design that with the addition, so the structure and the unit are drawn together.

Second storey additions on postwar Newmarket houses

Newmarket was in a suburban building boom by the 1950s, and the postwar houses near its core often need their structure strengthened before they can carry another floor. Our engineer checks the foundation, the bearing walls and the beams before a second storey is drawn, and the roof comes off only once that design is settled.

Building up also has to clear the zoning: the height limit in the governing by-law caps the new storey, and we check it alongside the structure.

Zoning, Moraine lots and heritage review for Newmarket additions

An addition is checked against whichever by-law applies to the address: the parent zoning by-law, 2010-40, or the 2019-06 by-law covering the Urban Centres. On land in the Oak Ridges Moraine area, the Town refers zoning questions to its Planning Department, so we make that call before the footprint is fixed.

In the Lower Main Street South heritage conservation district, Newmarket’s only one, or on a designated property, an addition that changes the exterior needs heritage review alongside the permit. We contact Planning before drawing, because the review can shape the materials as well as the size.

Contact us

Zoning checked. Beam sized. Room to grow.

Send us the address and what you want to add and we’ll tell you what fits, on a free first call.

First consultation free(416) 990-9179