
The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Richmond Hill, York Region
Legal basement apartments in Richmond Hill with the entrance, fire separation, egress and heating worked out by our P.Eng and BCIN designers, the permit filed and followed for you, and the unit built by the crew that works from those drawings.

What’s included
Each item on a legal unit’s code list gets checked by the inspector. Our design and build follow that list, and the city’s sequence decides when we book inspections. In Richmond Hill the package goes to the City of Richmond Hill Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Inspections are in the schedule across four steps, from bare basement through to closed permit.
After measuring the ceiling and checking the windows, mechanical room and entrance options, we say whether this basement can become legal and what that involves.
Layout, separations, the structural opening and HVAC are drawn in one office and filed with the municipality. City comments are answered at no extra charge.
Entrance, framing, rough-ins, insulation and rated assemblies go in, inspected at each stage.
With bathroom, kitchen, doors and flooring done, a final inspection closes the permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The price depends on the gap between your basement as it is and the unit standard, and we set it after the first site visit. Many basements here start out finished: the City's 2021 Census release puts 44.4% of Richmond Hill homes as built since 2001, so the job often means opening up an existing finished basement to add fire-rated assemblies, linked alarms and an exit, rather than replacing old systems. Underpinning to gain height, cutting a new entrance through the foundation or upgrading the electrical service each push it up.
A separate dwelling unit in the basement that has an issued building permit and has passed its final inspection. The permit is what shows the unit meets the zoning on the lot and the Building Code inside it. Without one, a rented basement is a finished basement with a tenant, whatever has been built down there.
We give you a schedule with the quote rather than a number up front. The drawings follow the site visit, the City's review starts when the application is complete and pauses for any comments, and the build then runs through the inspections the permit lists. Underpinning to gain ceiling height, or a new entrance dug beside the house, lengthens the build the most.
A building permit from the City for the unit, with drawings covering the layout, fire separation, exits, alarms, heating and ventilation, and any structural work such as a new entrance or underpinning. The unit's wiring is permitted and inspected separately by the Electrical Safety Authority. If a new entrance or window well changes the ground around the house, the grading goes on the set too.
The City's ceiling is the house plus three additional units, but your lot's zoning, its servicing and the parking it can provide decide how many it can take in practice. We check those from the address before drawing the basement, so you know whether a later backyard suite would still fit alongside it.
Ontario's 2024 Building Code sets it at 1.95 m for a secondary suite, and lets beams and ducts bring the clear height down to 1.85 m beneath them. Because the rule is provincial, Richmond Hill applies the same figures as every other Ontario municipality. We measure from the floor to the joists at the first visit, before planning anything else.
Then the floor has to come down, and underpinning is the usual way. New footings are built under the old ones in short sections while the house stays supported, and the floor is lowered to the new level. Because that is structural work, the sequence and footings are designed by our P.Eng, shown on the permit drawings and reviewed on site at each stage.
Yes. A new door through the foundation wall, usually with a stairwell dug beside the house, is structural work, so our P.Eng designs the opening and the stairwell. The set also covers the stairwell's guard and drainage and the fire and exit rules for the unit the door serves. Its position depends on the side yard, the grading and what is buried there.
No, though it can have one. Sharing the house furnace is one option, and separate heating is the other, which gives the tenant control of their own thermostat. Either way our mechanical designer works out each unit's heating load separately and draws both units' heating and ventilation on the permit set.
Usually, yes. We record the basement exactly as built, then draw it with the changes a second unit needs under the Building Code. The inspector may need ceilings or walls opened to see framing, insulation or wiring hidden behind them, so we plan those openings with you before the application goes in.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationNot necessarily. Where the house is five or more years old, a unit can exit through its own door, a shared exit behind a fire separation, or the other unit plus an escape window. A new side or rear entrance changes the grading, and the City's standard asks for 2% to 5% fall away from the foundation and a sump pump where storm service can't drain by gravity.
The Ontario Building Code sets a minimum clear opening for a bedroom window that serves as a way out of the unit. Existing windows are measured at the site visit, and one that falls short is enlarged, with its window well, on the permit drawings.
Through a building permit and a passed final inspection, the same as a new one. The suite is measured as built, the drawings show what the code still needs, the work is done, and inspectors sign it off before it counts as legal.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Good to know
A basement apartment is legal once it has a building permit and has passed its final inspection. Getting there takes a ceiling at the Building Code's 1.95 m minimum, a fire separation from the main house, interconnected smoke alarms, a safe way out and heating designed for two units. We measure, draw, file and build all of it.
Before any of that, the lot has to qualify. In Richmond Hill, a lot with additional residential units must be separately serviced by municipal sewage works and the municipal drinking water system, so a house on a private well or septic system can't take a legal unit. We confirm the servicing from the address before design starts.
Richmond Hill lets a lot carry the main house plus as many as three additional residential units, of which an accessory building can hold no more than two. A basement apartment takes one of those three places. It still has to satisfy the zoning on the lot and gets its own permit drawings, and a unit out back can be planned beside it within the same count.
Parking follows provincial rules: a by-law can ask for at most one space for the unit, a tandem space counts, and none is needed where the zoning asks none of the house. We read the requirement from the zoning that governs your lot.
Richmond Hill publishes a checklist for finished basements (R3), and one line on it catches basement units: an HRV unit is required if the plan creates a sixth bedroom or adds a solid fuel burning (wood-burning) fireplace. In a four-bedroom house, a two-bedroom unit downstairs reaches that count. Our mechanical designer puts the HRV into the heating and ventilation design so it is on the permit set from the start.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179