
The way in
Separate entrance
To add an outside entry through the foundation without weakening the wall, we design the guard, stairwell and drainage for it.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Toronto
Legal basement apartments in Toronto, designed by an engineer who also holds BCIN qualifications, so the layout, the code check and any structural change are worked out by the same person. We file the permit, answer the City’s comments and build the unit, which you can rent once it passes final inspection.

What’s included
A legal unit is a list of code items, and the inspector checks each one. We design to that list, build to it, and book the inspections in the order the city wants them. The Toronto package is sent to Toronto Building, and the drawings follow its checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Starting with a bare basement, four steps lead to a closed permit. Inspections are scheduled.
The ceiling is measured, and the windows, entrance options and mechanical room are looked at. We say if the basement could be legalized and what that will take.
One office draws the layout, separations, structural opening and HVAC and files them with the municipality. Answering city comments costs nothing extra.
Inspected stage by stage: entrance and framing, rough-ins, insulation, then rated assemblies.
With bathroom, kitchen, doors and flooring done, a final inspection closes the permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Toronto’s word for the unit is a secondary suite: a second, self-contained home inside an existing detached house, semi-detached house or townhouse. It becomes legal when the City has issued a building permit for it and the finished work has passed its final inspection, and not before, however complete the basement looks.
You need a building permit for the suite from the City, and an electrical permit from the Electrical Safety Authority for the wiring, which the ESA inspects. The building permit set shows the layout, the fire separations, the exits and the location of every smoke and carbon monoxide alarm. If the floor is lowered or a new entrance is cut, that structural design goes in the same set.
That depends first on how much of the job you give us: the drawings and permit alone, or the construction as well, built by the team that drew it. Within either, structural work moves the total most, such as lowering the floor for headroom or opening the foundation wall for a new entrance, and we price it after a free site visit. Against the cost, a legal Toronto unit can be rented once it passes final inspection, and our Director, a real estate Broker of Record, can tell you what it would add to the property’s value.
The quote comes with a schedule, and in Toronto that schedule has no rezoning at the front: secondary suites are permitted in every Residential zone, so the building permit is the approval the schedule waits on, alongside the ESA’s permit for the wiring. From there the basement sets the pace. Underpinning for headroom, or a new entrance cut through the foundation, adds design time and a stage of construction of its own.
The permit and the inspections behind it. A legal unit’s fire separation, exits and alarms have been checked against the Building Code by the City’s inspectors; an unpermitted one’s haven’t. Making an existing unit legal usually means drawings of what is there, changes to meet the code, and inspections that can involve opening finished walls.
Start with which by-law governs the lot. The city-wide Zoning By-law 569-2013 covers most lots, while some are still zoned under the by-law of their former municipality, and eligibility is read against whichever one applies to yours. Then the house: the City’s suite guide is written for detached, semi-detached and townhouses. We check both from the address and the survey before you spend anything on drawings.
The Ontario Building Code sets it for every municipality, Toronto included: 1.95 m for a secondary suite, with 1.85 m allowed under beams and ducts. We measure your ceiling at the first visit and tell you there whether it passes.
It can, but in a Toronto semi or townhouse, both house types the City’s suite guide covers, the fix reaches next door. Where the whole ceiling is short, the floor comes down by underpinning, and in an attached house that dig runs along a foundation you share with the neighbour, so our engineer sets the order of the sections around it. A single low beam or duct is a smaller matter, since the Code allows 1.85 m under them.
A door through the foundation is structural work, so our P.Eng designs and stamps the opening and it goes into the suite’s permit set. Whether you need one is a separate question: the unit needs a way out, and the site visit shows whether an existing door already gives it.
Sharing is one of two routes, and the difference is who controls the heat. A shared furnace means both units share its controls, while equipment of the suite’s own lets the tenant set the temperature downstairs. Our mechanical designer works out the heating load for each unit and draws the option you pick into the permit set.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe Ontario Building Code decides it. For a house that has stood five years or more, the renovation provisions accept 30 minutes of fire separation around the suite, and the floor between units can drop to 15 minutes if every unit and common area has interconnected smoke alarms.
The Building Code’s, which apply across Ontario. An escape window must open from inside without tools and give at least 0.38 m² of clear opening, with no side under 460 mm. A window well needs 1,000 mm of clear space in front of it. We measure each candidate window at the site visit.
Ontario limits what a by-law can ask: no more than one parking space for an added unit, and none where the zoning requires no parking for the house itself. How Toronto’s by-law applies to your lot is part of our zoning check.
At least 1.95 m, about 6 ft 5 in, under Ontario’s 2024 Building Code, with 1.85 m of clear height allowed under beams and ducts. The measurement runs from the finished floor to the finished ceiling, so new flooring and drywall count against it. Fine Engineering measures the height at the first site visit, before any layout is drawn.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
Good to know
A Toronto basement apartment becomes legal the way any Ontario one does: a building permit, then a final inspection it passes. Along the way the Building Code’s requirements for ceiling height, fire separation, alarms and an exit all have to be met, and the zoning has to allow a second unit in the house.
Our part runs from the first measurements and the zoning check through the drawings, the permit and the build: the separate entrance if you want one, the fire separation, the exits, the alarms and the heating for both units, then the inspections that close the permit.
Every Residential zone in Toronto allows a secondary suite. So for a house in any of them, the basement apartment begins with a building permit for the suite, not with a rezoning, and the drawings concentrate on the code items: exits, fire separation and alarms.
That leaves the house itself as the open question in Toronto: the ceiling height, the route out and what the mechanical room allows, which is what the site visit is for.
Two lines come before the rest. First the house type: Toronto’s secondary suite guide covers a second unit created inside an existing detached house, semi-detached house or townhouse. Then the alarms: the suite’s floor plans must show where each smoke alarm and carbon monoxide detector goes. We settle the first at the site visit and draw the second on every floor plan.
After those comes the Building Code list every Ontario basement faces: ceiling height, fire separation, a way out, a separate entrance if you want one, and heating for both units. The site visit shows which items your basement already meets.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179