Before anything is drawn
Zoning & setback review
We check the by-law to see what fits: setbacks, coverage, height, lot size, servicing and the trees it protects.
- By-law & setback check
- Height & angular plane
- Tree & landscaping rules
- Servicing route
Garden Suites · Richmond Hill, York Region
Garden suites in Richmond Hill, single-storey or two, for family or tenants. We measure your lot against the zoning, plan the suite, have our P.Eng design its frame, file the permit and build it. The two-storey, 1,250 sq ft suite on our project list is here in Richmond Hill.

What’s included
Every rule a house follows applies to a garden suite: a small new house on a lot that has one. Whether a suite is possible at all depends on zoning, so that check comes first. In Richmond Hill the package goes to the City of Richmond Hill Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
The first of the four steps decides everything after it: is a suite allowed on the lot at all?
Your lot is measured against the by-law. You hear the largest suite it can take, or that it takes none, before design costs.
The city gets site, plan, structure and mechanical drawings from one office, which answers until the city issues the permit.
Our crew digs, lays foundations, frames and does rough-ins, then the exterior and finishes, all inspected.
Rent it or move in once the final inspection is passed and the water, sewer and electrical are connected.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Each suite gets its own written scope and price once the zoning check is done, and the first consultation costs nothing. A suite is priced much like a small house. In Richmond Hill the lot then moves the total: the length of the servicing run from the house, how much of the yard sits inside a tree protection zone, and how easily machines can reach the back. A second storey and the finishes change it too.
A home of its own in the rear yard, separate from the main house, with a kitchen, a bathroom and its own door. The City treats it as an additional residential unit in an accessory building, so the lot's unit count and the zoning's size, height and setback limits all apply to it.
We schedule it once the zoning check shows what the lot allows, and the schedule comes with the quote. The order doesn't change: zoning and design, then the City's review, then construction. A tree permit, a site alteration permit for the grading or a minor variance for a setback adds a step before the building permit can be issued.
A building permit for the suite itself and an electrical permit from the ESA for its wiring. Where the suite's work runs under a site alteration permit, it also needs a grading and servicing plan, which by the City's by-law must come from a licensed surveyor (OLS) or a professional engineer; ours is drawn by our P.Eng. A tree permit or a minor variance can come first, depending on the lot.
Yes, where the zoning's height limit leaves room for it, and the suite on our project list here is one. A height limit can depend on where the suite sits on the lot, so we settle the position and the design together at the zoning stage.
Not its own street connections, as a rule. The lot has to be on municipal water and sewer, and the suite is normally fed by water, sanitary and electrical lines run from the main house. The design checks the route across the yard and whether the house's existing service has room for the extra load.
Possibly. Outside the Greenbelt, on urban residential land, Ontario now applies only 90 per cent of a by-law's stated minimum setback, apart from some excluded areas, so a small shortfall can disappear. The City's zoning examiners confirm that reading first. Beyond it, the Committee of Adjustment hears a minor variance before any permit is filed.
Not always, but it can move the suite or add time. Under the City's Tree Preservation By-law No. 19-25, removing or injuring a tree whose trunk diameter reaches 15 cm at breast height, 1.4 m above the ground, needs a permit first. We plot those trees from the survey at the zoning stage and fit the suite around them wherever the yard has room.
Almost always. The setbacks, the trees and the route for the water and sewer lines are measured from it, and the permit's site plan is drawn on it. If yours is old or missing, we will list what the new survey must show before you commission it.
A laneway house faces a public lane, so the first question is whether your lot borders one. Where it doesn't, the detached unit is a garden suite, set behind the house and reached through the yard. Either way it is an additional unit in an accessory building under the City's limits, and our zoning review confirms what your lot allows.
Searched & answered
Short answers to the garden suites questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationMostly in name. Both describe a detached unit in the rear yard with its own kitchen, bathroom and entrance, and in Richmond Hill either one falls under the City's rules for additional units in an accessory building.
A laneway suite is a detached unit that faces a public lane at the back or side of a lot. On a Richmond Hill lot the question starts with whether such a lane exists, and the zoning review confirms which kinds of detached unit the lot qualifies for.
Yes, within the City's limit on additional units. The basement unit and the suite each need zoning compliance and their own permit drawings, and the lot's municipal servicing has to carry both.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
Richmond Hill caps a lot at three additional residential units on top of the main house, and an accessory building may hold two of them at most. A garden suite counts toward both limits, so the first question is what the lot already holds. A basement apartment in the house still leaves room for a suite out back.
The zoning on the lot then sets the suite's size, height and setbacks. We measure the lot against it before anything is designed, and if the lot can't take a suite, we say so at that stage.
A Richmond Hill lot with additional units must be separately serviced by the municipal sewer and drinking water systems. A suite is usually fed from the main house, so how far the water, sewer and power lines must run across the yard, and whether the house's service can take the extra load, are part of what the price covers.
Trees move it too. The City's grading requirements keep all construction activity, including excavation, material storage and machinery, outside each tree's Tree Protection Zone, and they count any encroachment as injury to the tree. On a tight backyard that can change the access route and the staging area, and sometimes the footprint.
Our Richmond Hill garden suite rises two storeys and holds 1,250 sq ft, planned so the footprint gives up as little usable space as it can. Our work covered layout planning, architectural drawings, structural design and the permit application, and the suite was drawn from the start as a unit to rent.
A new suite runs the same way. The zoning and setback check comes first, then the layout, then a foundation and frame designed by our P.Eng for a building with no house to lean on. Servicing runs from the house, the permit is filed, and our crew does the excavation, framing, rough-ins and finishes, inspected at each stage.
Contact us
Free first call: give us the address and we check access, trees and setbacks.
First consultation free(416) 990-9179