Ground floor and up
Rear & side additions
Kitchens, family rooms and bedrooms added at the back or side, on new foundations tied to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions
Home additions across York Region and the GTA, at the rear, to the side or up a storey. We settle where the new part joins the old house, which rules apply and which approvals come first.

What’s included
An addition is judged where it meets the old house: the beam that opens the wall, the roof that joins the existing one, the ducts that have to reach the new rooms. We design those joints first.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the slowest one, the tie-in to the house you are living in, planned around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
Plans and elevations, structure, HVAC and electrical from one office, filed with the city and answered at no extra charge.
Excavation, foundation, framing and the opening into the existing house, then rough-ins, exterior and finishes, inspected at each stage.
Final inspection, permit closed, the house handed back as one building.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The type of addition sets the biggest line. Building out pays for a new foundation, while building up pays for reinforcing what sits underneath. After that, how much of the old house is opened, any minor variance, a heating system that has to grow and a panel upgrade each add a line, and the finishes are the variable part of the price.
Approvals come first: the zoning check, any minor variance, then the permit review, which starts only once the application is complete. Construction follows, and the slowest stage is opening the old house into the new rooms, because you are living there.
Yes. The Building Code Act counts an extension of a building as construction, so an addition needs a permit before work starts. The permit is not issued until any zoning change or minor variance the design needs has been obtained, which is why we check zoning first and file the permit second. We take the file through to issue.
Going up is the usual reason. The foundation under the walls that will carry the new floor is checked first, and some houses need part of it reinforced before anything goes on. A new foundation for the addition itself is designed by a professional engineer under the 2024 code change, not sized from a table by the crew.
The old wall comes open for the new beam, and the roof, ducts and wiring at the joint are reworked. Temporary shoring carries the load while the beam goes in, so the wall opens late in the schedule. On the London duplex unit on our project list, the work included new beams and columns, HVAC design and updated mechanical layouts.
The new rooms add load, so the first check is whether the existing panel and service can carry the larger house. Circuits for the new rooms run through new framing, while the old wiring at the opening is reworked with the joint. If the service has to grow, the utility’s service layout comes first and adds lead time.
It can. A dwelling’s principal ventilation fan has to meet the exhaust capacity range the Building Code sets by the number of bedrooms, so more bedrooms can mean a larger fan. We size it with the new layout, so the fan and its duct are drawn in before the walls are framed.
The Building Code sets the stages, and the new footings, the framing and the beam at the join are each inspected before they are covered. We call for an inspection when its stage is ready, and the next stage starts only after it passes.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationIt may. The value depends on whether the unit can be permitted and what the new space is worth at resale. Fine Engineering’s Director is a Broker of Record and can give a view on that before the owner spends on drawings.
A bump-out pushes one wall of the house out, usually for a bigger kitchen or bedroom. Whether it needs its own foundation depends on how the new floor is carried, which our P.Eng settles at the site visit. A new foundation is designed by an engineer.
Only with the right qualifications. Under the Building Code Act, a person needs the Building Code’s designer qualifications to prepare drawings for the permit, unless they hold an architect or engineer licence, and a permit can be refused when the law requires an engineer’s design and there is none. Fine Engineering’s P.Eng and BCIN team prepares the set.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
An addition meets the zoning by-law at its setbacks, its height and its lot coverage. In Toronto a design that misses one of them goes to the Committee of Adjustment for a minor variance first, and the building permit application follows. A zoning review beforehand lists every variance the addition needs.
Any condition the committee attaches, such as an approved footprint, carries into the permit drawings. The decision can be appealed within 20 days, so where a variance is needed the start date is not firm until that window has passed.
A second storey addition asks the old house to carry a new floor. The walls, beams and foundation under the new floor are checked before the design is fixed.
The new floor framing and its beams are sealed by our P.Eng before the drawings go to the city.
SB-12 lets an addition be assessed alone, so only the new part meets the energy design and the old envelope stays as it is, or together with the house as one.
The heat loss of the larger house is calculated, and it decides whether the existing ducts can be extended or the addition needs a system of its own.
In Richmond Hill the owner obtains approvals from other agencies, and they are required before the building permit can be issued. Conservation, grading and planning approvals are started alongside the drawings so they do not hold up the permit.
Which of them applies depends on the lot. At the site visit we ask whether it backs onto a ravine, stream or wetland, because a conservation file adds a step in front of the permit. Our site engineering team prepares it.
Contact us
Send us the address and what you want to add and we’ll tell you what fits, on a free first call.
First consultation free(416) 990-9179