Ground floor and up
Rear & side additions
A family room, bedroom or kitchen off the side or back, on fresh foundations connected to the old.
- Foundation & footings
- Tie-in to existing structure
- Roof junctions
- Matching or contrasting exterior
Home Additions · Aurora, York Region
Home additions in Aurora, whether a rear or side extension or a second storey: we check what the existing structure can carry, design the beams, columns, foundations and mechanical tie-ins, take it through the permit and build it.

What’s included
Seams with the old house are what an addition is judged on. The wall opens for a beam, the new roof joins the old one and ducts must reach the new rooms. Our design starts with those seams. Aurora packages are filed with the Town of Aurora Building Division. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
The link to the house you live in is the slowest of the four steps, and we plan it around you.
We measure the house and lot, check what the by-law allows and look at the foundation and framing the addition will connect to.
One office does electrical, HVAC, structure, plans and elevations, files them with the city and answers at no extra cost.
Excavation, foundation and framing go in, the existing house is opened, then rough-ins and the exterior, then finishes, all inspected.
Final inspection done, permit closed, and you get one building back.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179A large part of it is what the existing house can carry. On an older Aurora house a second storey can mean reinforcing the foundation or framing first, while a rear addition on an ORM-zoned lot is held to the zone's size caps, which limits how big the job gets. After the structure, the price moves with the size, the height and your finishes, and the quote follows a free first visit.
In order: a site visit to measure the house and look at its structure; a zoning read for the lot, including any ORM caps, heritage status and, in four established neighbourhoods, the infill guidelines; then the drawings and engineering, the permit, and the build with inspections at each stage. We handle every step, and the people who drew the addition build it.
The design and the Town's review come first, and the build follows in inspected stages. Aurora adds time where another approval is needed: a regulated tree near the footprint needs its own tree permit even after the building permit has been applied for, and a designated or district property needs its heritage permit before the building permit.
Yes, every addition does. A variance enters the picture only when the design falls short of a zoning rule on setback, height or coverage by an amount the Committee of Adjustment can accept as minor, and that application is decided before the permit. We read the by-law for your lot before drawing.
Yes. One team draws the addition, takes it through the Town and builds it. If you would rather use your own builder, we can supply the drawings and engineering alone and stay on call for the builder's questions during construction.
Yes, an addition can be planned as a new unit. The unit then has to meet the Building Code items a second unit needs, and Aurora's rules for added units apply; our legal basement and garden suite pages cover those.
Yes, it adds a step at the front. The heritage permit has to come before the building permit, and its review looks at how the addition changes the house from the street, including windows, doors and cladding. We confirm the property's status before design and draw the street elevation with that review in mind.
They do if the house is in Regency Acres, Temperance Street, Town Park or Aurora Heights. Aurora has area-specific Urban Design Guidelines for infill in those four neighbourhoods of established, low-rise homes, so a large addition there is checked against them before the drawings go in.
Out uses lot coverage and setbacks, and on an ORM-zoned lot it meets the zone's limits on additions; up relies on the foundation and framing you already have, which on an older house may need reinforcing first. A regulated tree behind the house can also decide it, since a footprint near it brings a tree permit. We compare both at the site visit.
It can. Where the lot is Regional Floodplain, or ground LSRCA or TRCA has identified for erosion, loose soils or steep slopes, Aurora's zoning applies its Natural Hazards overlay, which overrides the underlying zone. An addition there answers to the conservation authority as well as the Town, and it may be limited or allowed only with conditions. We check the lot's status before design and set the footings, grades and setbacks to what that review allows.
Searched & answered
Short answers to the home additions questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationOurs does. Fine Engineering draws the addition, files the application with the Town, answers the examiner and books the inspections during the build. Where a tree or heritage permit is needed, it goes into the same plan.
Low-rise houses. Aurora's infill guidelines describe Regency Acres, Temperance Street, Town Park and Aurora Heights as areas of established, low-rise residential dwellings, and much of the town's 20th-century housing sits near the old core.
A new foundation for the extension and a beam where the back wall opens into it. Above that, a roof tied into the existing one, and the heating, plumbing and electrical extended into the new rooms; the rear setback and, on an ORM lot, the size caps decide how far it can go.
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
Good to know
An addition puts new floor area on the house you already own: a rear or side extension, a second storey over the existing one, or a new unit. Before anything is drawn, our P.Eng checks what the existing foundation and framing can carry, and the new beams, columns and mechanical tie-ins are designed around that.
The set then goes to the Town, and once the permit is issued the same team builds it. Where the addition holds a new duplex unit, its beams and columns and the mechanical tie-ins for both units are worked out on the same set.
Aurora's population more than doubled in the 1960s, and much of its earlier housing stands near the downtown at Yonge and Wellington. Houses from those years have foundations and framing sized for the house as it was built, which may not allow for another floor.
So the engineering starts in the basement. Our P.Eng traces the load from the new roof to the footings, checks the existing walls, beams and foundation against it, and shows any reinforcement on the drawings before the new floor is designed.
In the ORM zones of the Oak Ridges Moraine Settlement Area, Aurora's zoning permits minor additions to an existing house of up to 25% of its ground floor area and no more than 50 sq. m on the ground floor, open-sided roofed porches included. An addition also has to stay out of any hydrologically sensitive feature, so we size and site it against those limits first.
Where the house is individually designated or sits in a Heritage Conservation District, the heritage permit comes before the building permit, and the addition's street elevation is part of what that review looks at.