
Your plan, drawn properly
Custom floor plans
Your sketch or brief becomes a layout, tested for zoning and code fit, then drawn up for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Aurora, York Region
Custom homes in Aurora, drawn from your sketch by our P.Eng and BCIN-qualified team: the plans, structure, HVAC and permit, then construction coordinated with the licensed builder you hire. The 1,750 sq ft Haldimand County house on our project list began as its owner's sketch.

What’s included
Only a new house puts every discipline in our hands from the start. Our structural and mechanical sheets never conflict, and the office behind both coordinates the build. In Aurora the package goes to the Town of Aurora Building Division, and it is drawn to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
From lot to occupancy permit there are four steps, and one office answers for every drawing.
Your brief or sketch becomes a first layout, after we walk the lot and check zoning and conservation or servicing limits.
One office develops the structural, mechanical and architectural drawings together, then files for permit and follows the city’s comments through.
Excavation, foundation, framing, envelope, rough-ins and finishes by the builder we coordinate, with the engineer on site at each structural stage.
The occupancy permit, final inspections and a house matching your approved drawings.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179The lot is the first variable. Where floodplain or a slope, erosion or soil hazard puts it under Aurora's Natural Hazards overlay, the conservation authority can limit the house or attach conditions, and that moves the grading, the footings, the setbacks and the budget with them. After the lot, the size of the house, its structure and the finishes carry most of the cost. We quote the design and permit after a free consultation; the builder prices the construction.
Design and the permit come first, then a build in inspected stages. In Aurora, approvals ahead of the permit set much of the early pace: a heritage permit on a designated or district lot, a conservation review on an overlay lot, and a tree permit for any regulated tree the house would harm, needed even once the building permit is applied for.
Every new house needs its building permit, but on an Aurora lot other approvals can stand in front of it. A designated property or one in a Heritage Conservation District needs its heritage permit first. A lot inside a Wellhead Protection Area may need a York Region Risk Management Plan before development. A regulated tree the house would harm needs a tree permit, which applying for the building permit does not cover. We list the ones your lot triggers at the first review.
It depends on the lot's numbers in Zoning By-law 6000-17, which we read before the first layout is drawn. A house that misses one by a small margin goes to the Committee before the permit; a bigger miss usually means changing the design. One Aurora layer sits outside that process. On a lot under the Natural Hazards overlay, which takes precedence over the zone, the conservation authority's conditions apply as well, and a variance from the Committee doesn't replace them.
No, not for a house: it can be designed under our BCIN registration, with the structure under our P.Eng's stamp. On some Aurora lots the more useful question is what the design has to satisfy besides the Code. A house on a designated or Heritage Conservation District property has its street face reviewed for the heritage permit before the building permit can issue, so the elevations are drawn for that review from the first sketch.
They can be used after two checks. We read Zoning By-law 6000-17 for the lot's setbacks, height and coverage, and if the lot is in Aurora Heights, Regency Acres, Town Park or on Temperance Street, we also test the plans against the Town's infill Urban Design Guidelines for that area. Then they are redrawn as a permit set, with the structure and HVAC added.
Yes, and it is simpler at the design stage than later. The unit's entrance, fire separation, exits and its own heating are drawn into the house from the start, so the structure and mechanical systems are sized for both units.
All of Aurora, including Aurora Heights, Regency Acres, Town Park and Bayview Northeast. The first consultation is free and can start from the address, a sketch of the house you have in mind and a few photos of the lot.
Only if our P.Eng finds the existing footings and walls can carry the new house. That check looks at the condition of the concrete and at whether the new walls and loads line up with what is there. The warranty matters as well: Ontario notes that homes built on existing footings or foundations may not be covered by the new home warranty, so the choice is made before the design depends on it. If the old foundation can't stay, a new one is designed with the house.
Sometimes, and on certain Aurora lots the zoning by-law gives an early signal. Its Natural Hazards overlay covers land that LSRCA or TRCA has identified for loose soils, erosion or steep slopes, and a house there goes through the conservation authority's review before its footings are designed. On other lots our P.Eng judges it when we walk the site: the Building Code sets minimum footing depth by soil type, so where the soil is clay or not clearly identified, a report settles the foundation design.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationOn a lot zoned ORM, yes. In its Oak Ridges Moraine Settlement Area, Aurora holds minor additions to an existing house to a quarter of the ground floor area and no more than 50 sq. m on that floor, and keeps work out of hydrologically sensitive features.
A lot and zoning review, a full design with structure, HVAC and energy compliance, a building permit, and a licensed builder or your own arrangement for construction. The Town inspects the work at each stage the permit lists.
The Town, through the building permit and its inspections. The Home Construction Regulatory Authority licenses builders and Tarion runs the new home warranty, but neither enforces the Building Code; that is the municipality's job. Our engineer also reviews the structure on site at the stages the permit sets.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
Whoever builds the house, it needs a lot and zoning review, floor plans and elevations, structural and HVAC design, the energy compliance the permit asks for, and the permit. We prepare all of that in one office and coordinate construction with the builder, with the engineer who drew the house on site at the structural stages the permit sets.
Before you sign a construction contract, check the builder's licence. Ontario requires every new home builder to be licensed by the Home Construction Regulatory Authority, and the builder must enrol the home with Tarion before construction begins.
The Town has written infill guidelines for four established low-rise neighbourhoods: Aurora Heights, Town Park, Temperance Street and Regency Acres. A knockdown rebuild in one of them is infill, so the new house is checked against that area's Urban Design Guidelines before the drawings are submitted.
A teardown also needs a demolition permit for the old house, which we prepare with the new set.
On a lot with a Part IV heritage designation, or one inside a Heritage Conservation District, the heritage permit must be issued before the building permit or any planning approval, and the new house's street face is part of that review.
Wellhead Protection Areas are the other map to check: they sit on Schedule A.4 of Aurora's zoning by-law, and within them York Region's rules may restrict development or require a Risk Management Plan first. We check the address at the lot review.
Contact us
Free first call: bring the lot address and a sketch, and we go through what it needs.
First consultation free(416) 990-9179