
The floor outside
Decks & railings
Pressure-treated and composite decks with guards that meet the code’s height and load rules.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches
Deck permit drawings for York Region homes, with the footings, guards and every post and bolt sized for the load. Our London porch addition had its structural drawings done for the permit.

What’s included
Outdoor structures fail at the ground and at the house: footings that heave and ledgers that rot. We design both properly, then build what we drew.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Four steps, with the footing inspection setting the pace.
We look at the grade, the wall the structure will attach to, the access for materials and how you want to use the space.
Drawings for the permit, with the structure sized in-house, filed with the city and answered at no extra charge.
Locates, footings, framing, decking or roof, guards and stairs, inspected at the footing and framing stages.
Railings, lighting and finishes, the final inspection, and the permit closed.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Usually, yes, once the deck stands more than 600 mm above grade, which is Richmond Hill’s line. Each municipality words its own line, so we read yours before anything is drawn and you know where you stand before you order lumber.
The municipality sets its own permit fee. The drawing and permit work varies with the deck: its height above grade, which sets footing depth and guard height; a roof, which adds beams and snow load; how it attaches to the house wall; and what the soil under the footings can carry. A ravine lot adds a conservation file, and tight setbacks can add a variance.
A complete set of drawings starts the review, and each round of examiner comments adds to it. A deck that needs a minor variance waits for that decision before the permit can issue. After issue, the footing and framing inspections set the pace of the build, and an inspector must attend within two days of notice that a stage is ready.
It sizes every post, beam and pier, down to the joist hangers, so whoever builds reads the same member sizes the examiner checks. The deck set in our drawing samples pairs it with an elevation of the posts, bracing and pier depth against the house and the grade, and a section that calls out each connection to the bracket and bolt.
Often, yes. The Building Code Act counts erecting, extending, materially altering or repairing a structure as construction, so a new floor on old posts is judged by its height above grade, like a new deck. At the site visit we check the old footings and the ledger before deciding what can stay.
Yes, when the lot sits inside a TRCA Regulated Area. After an initial review and site visit, TRCA staff may also ask for a geotechnical slope stability assessment or a structural engineering letter with stamped drawings. Either one is added to the structural scope, so the conservation file and the drawings move together.
When the Building Code requires the plans to be sealed by an engineer. We draw every deck set ourselves, and our P.Eng adds the stamp when the design needs one, so the framing and the footings are designed by the same office that signs them.
Each footing is sized from the load on its post and from what the soil under it can carry, not copied from a table. The structural sample in our drawing set is designed on soil rated for 150 kPa, and your lot’s soil sets its own figure, which we confirm at the site visit.
The roof is what changes. A porch or canopy puts roof framing and snow load on its posts, and a roof fastened to the house adds a tie-in that loads the wall as well. It is the same building permit with a larger drawing set, and the roof also takes a deck out of the frost-depth exemption.
The ledger is flashed and fastened to the house so water stays out of the wall. We look at the wall the deck will attach to at the site visit, then draw the section through the ledger for that house, so the flashing is on the drawing and not left to the build.
It needs drawings after the fact. We draw the deck as it stands, check its footing depth and guard heights against the Building Code, and mark what has to change. We then file the permit and follow it to close.
We do, as the first step of the build and before any digging. Once the holes are dug, the footing inspection is called in before concrete covers them, and the framing inspection comes later.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationThe new roof is framed into the house, so the existing wall and roof framing are checked first. Flashing is drawn where the two roofs meet, and drainage is set so that water runs off the house side and away from the wall.
Usually, yes. In clay or soils not clearly defined, the Building Code sets a minimum depth of 1.2 m for an unheated foundation, and no less than frost penetration. A lesser depth needs local soil experience or an engineered foundation design behind it.
Only if the framing is sized for it. A hot tub is a concentrated load, so the posts, beams and piers under it are sized in the framing schedule and the footings are checked against the soil. We ask for the tub’s size and position at the site visit and draw them in.
A permitted deck is inspected at the footing stage and the framing stage, then once more when it is finished. The footings stay open until the footing inspection passes. Fine Engineering books each one as the work reaches it.
As close as the zoning by-law for the lot allows. Setbacks and lot coverage are read from the survey before the structure is drawn. A shortfall means a redesign or a minor variance, and the permit waits for the variance. A shortfall within 10 per cent of a required setback can be allowed as of right on urban residential land outside the Greenbelt.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Good to know
Richmond Hill lists building a deck more than 600 mm from grade as a project that needs a building permit. Below that line the deck is checked against zoning rules instead, and above it the deck is drawn and permitted before construction starts.
Once the permit is issued, the footing and framing inspections follow, and the permit stays open until the municipality closes it. On the decks we build, we book each inspection and follow the file to close.
The Code ties footing depth to the soil, so the depth is settled once the soil is known. A deck is exempt from frost-depth footings if it is one storey or less, up to 55 m2, with joists no more than 600 mm above ground, no roof and no attachment that its movement would harm.
A guard is needed wherever the walking surface is more than 600 mm above the surface within 1.2 m of it. It stands at least 1,070 mm high, or 900 mm for a house deck up to 1,800 mm above ground. The deck’s height therefore sets the guard height, its post anchorage and what the inspector checks.
A deck proposed inside a TRCA Regulated Area needs a TRCA permit, and the municipality cannot legally issue the building permit until that permit or clearance is in hand. The application comes with a survey and a grading plan, so on a ravine, stream or wetland lot we start the conservation file with the drawings. Our site engineering team draws the grading plan.
Ask any deck builder or deck contractor for the deck permit drawings before the quote. Richmond Hill requires plans to be prepared, sealed and signed by an architect, a professional engineer or a BCIN qualified designer where the Building Code requires it, so a sketch is not a permit set.
Then put the same questions to each: how deep the footings go on your soil, what the framing schedule sizes, how high the guard stands at your deck’s height, how the ledger is flashed to the house, and who books the footing and framing inspections. If a roof or a hot tub is planned, ask how the posts and piers carry it.
Contact us
Send photos of the yard and the house wall for a free first call on what the permit needs.
First consultation free(416) 990-9179