The floor outside
Decks & railings
On both composite and pressure-treated decks, guards meet code limits for height and load.
- Deck framing & spans
- Guard & stair design
- Composite or wood decking
- Lighting rough-in
Decks & Porches · Markham, York Region
Deck builder in Markham whose crew builds from its own engineered drawings: decks, roofed porches and rear canopies, each footing sized for what it carries and set below frost, guards and framing drawn to code, and the City permit handled before the first hole is dug.

What’s included
Footings heave in soil and ledgers rot at the house: that is where outdoor structures go wrong. We design both correctly and build what we drew. The Markham package is sent to the City of Markham Building Standards Department, and the drawings follow its checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
In four steps, the pace follows the footing inspection.
We check the grade, the wall for the structure to attach to, the way materials get in and your plans for the space.
Drawings for the permit, with the structure sized in-house, filed with the city and answered at no extra charge.
Locates, footings, framing, decking or roof, guards and stairs, inspected at the footing and framing stages.
After finishes, lighting and railings, final inspection closes the permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Only a freestanding deck that stays within 600 mm of the ground and 10 square metres in area escapes it. Fasten the deck to the house, lift it higher than 600 mm, or let it grow past 10 square metres, and Markham requires a building permit, with drawings of the footings and framing and inspections while it is built.
Start with what the lot allows, then shape the roof. A roofed porch at the front is checked for setbacks against whichever zoning by-law governs your lot, and in Markham that is not always By-law 2024-19, so we read it off the City’s interactive zoning map first. If the house is in the Thornhill, Markham Village, Buttonville or Unionville heritage district, the porch roof is also designed to that district’s guidelines. With the form agreed, our P.Eng works out how the new rafters meet the old ones and what the porch posts and footings must carry.
A written scope after the site visit gives you the number. Area, height, a roof or no roof, your choice of boards and railings, and the footings the soil calls for are what move it, and Markham’s permit fee is billed separately. On a lot inside one of Markham’s heritage conservation districts, a deck or porch counts as an exterior alteration needing heritage approval, and its design follows the district’s guidelines, which adds a step.
The permit comes first, and how long it takes mostly reflects how complete the application was and how many comments the examiner sends. If a footing would land in the roots of a private tree 20 cm or more in diameter, Markham’s tree by-law asks for a permit before the tree is harmed, unless the layout moves clear. After that, size and whether there is a roof set the build time, which comes with the quote.
Footings can go in through the colder months with the right protection, though digging and finishing are easier in other seasons. The part to start early is the paperwork: a deck that needs a Markham permit waits for it, so drawing over the winter means the permit can be in hand when you want to build.
Call the team that built it. Because we drew the deck, filed the permit and built it, the drawings, the inspection record and the people are all in one place, and the engineer can look at a footing or a connection against what was designed.
Yes. Before anything is filed you get the full drawing set and we go through it together: where the deck sits on the lot, how far above the ground each corner stands, where the stairs land and which way the boards run. Changes cost least at that stage. Once the set is uploaded to ePLAN, Markham’s online-only permit portal, a change becomes a revision the examiner has to review again.
All of it: Thornhill, Unionville, Milliken, Cornell and the rest of the city, worked from our office at 9201 Yonge Street in Richmond Hill. The first consultation is free, and a few photos of the yard are enough for us to say what the permit will need.
Some can, if digging around them shows they are deep and wide enough and happen to sit where the new posts go. On a Markham lot there can be another reason to keep a sound one: when a private tree 20 cm or more across stands close by, every new hole among its roots risks injuring the tree, and the City’s tree by-law requires a permit before that. We expose each old pier before deciding, and the drawings mark which are kept.
Yes, once the walking surface is over 600 mm above the ground measured within 1.2 m of the deck. At that point Ontario’s 2024 Building Code wants a guard on each open side: 900 mm tall for a house deck, and 1,070 mm when the deck stands more than 1.8 m up. That same 600 mm line is where Markham starts requiring a permit for a freestanding deck.
Searched & answered
Short answers to the decks & porches questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA low freestanding deck under Markham’s permit thresholds is within reach of a handy owner. Once a deck is attached, raised past 600 mm or larger than 10 square metres, it needs a permit with footing and framing details and inspections, and that paperwork is the work a builder who designs takes on.
Most layouts can be built in pressure-treated or composite boards. The pattern is shown on the framing plan, because the direction of the boards decides how the joists and blocking under them are laid out, and we go through the options at the site visit.
Slope sets the height, and a deck more than 600 mm up needs a Markham permit and a guard. Soil sets how deep and wide the footings go. Sightlines decide where the deck sits for views and privacy. A ravine or creek lot can add a TRCA permit, so all of it is looked at during the site visit.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
Most deck problems start in two places: the footings and the spot where the deck meets the house. Ask any deck builder how they handle both. Ours are designed before the build, with footings sized for the load and taken below frost, and a ledger flashed and fastened for the wall it attaches to, or a beam of its own beside the house where that wall cannot take one.
We build decks in pressure-treated wood or composite, plus roofed porches and rear canopies, with railings, stairs and lighting. Treated lumber is cheaper on day one and asks for regular staining and sealing; composite costs more at the start and skips that upkeep. Both can be priced in the written scope so you compare them for your own yard.
Markham accepts building permit applications only online through ePLAN, so the deck set goes in as digital files and the examiner’s mark-ups come back the same way. We file it, answer the comments at no extra charge and resubmit through the portal until the permit is issued.
Inspections follow the permit: the footings before they are covered, the framing before the decking closes it in, then the final. We call for each as its stage is ready, so the deck is never built past a step the inspector still needs to see.
Markham requires a building permit for a deck attached to the house, for any deck more than 600 mm above the ground, and for any deck larger than 10 square metres. A low freestanding deck under 10 square metres is the main case left outside that rule, so we draw nearly every deck for permit, with its footing and framing details.
A ravine or creek lot brings a second permit. The Toronto and Region Conservation Authority requires its own permit for a deck proposed within a TRCA Regulated Area, on top of the City’s. We check the regulated mapping against your survey before the deck is drawn, since TRCA’s review can change where it goes.
Contact us
Send photos of the yard and the house wall for a free first call on what the permit needs.
First consultation free(416) 990-9179