
Before anything is drawn
Zoning & setback review
Our by-law review covers lot size, setbacks, height, servicing, coverage and tree protection, to find what fits.
- By-law & setback check
- Height & angular plane
- Tree & landscaping rules
- Servicing route
Garden Suites · Markham, York Region
Garden suites in Markham, beginning with whether your backyard can take one at all: we measure the lot against its zoning, lay out one or two storeys, have our P.Eng design the foundation and frame, run water, sewer and power from the house, and carry the permit through to the build.

What’s included
A garden suite is a small new house with all of a house’s rules, on a lot that already has one. The zoning check comes first, because it decides whether there is a suite at all. The Markham package is sent to the City of Markham Building Standards Department, and the drawings follow its checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Everything else depends on step one of the four, which asks whether the lot can host a suite at all.
Before any money goes into design, we compare the lot to the by-law and say the biggest suite that can fit, or that none can.
The city gets site, plan, structure and mechanical drawings from one office, which answers until the city issues the permit.
Our crew does excavation, foundation, framing, rough-ins, the exterior and finishes, each stage inspected.
Sewer, water and electrical hooked up, the final inspection passed, the unit ready for rent or move-in.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Part of it comes from your Markham lot rather than the suite. A heritage district (Thornhill, Markham Village, Buttonville or Unionville) adds design to that district’s guidelines and a heritage approval; a TRCA Regulated Area adds TRCA’s permit or clearance, which can shape the footprint; and a protected tree close to the work, meaning any private tree 20 cm or more across the trunk, brings a tree permit or a layout clear of its roots. The rest follows the suite’s floor area, storeys and finishes, priced after a free first consultation.
A self-contained home in the backyard, in its own building, with a kitchen, a bathroom and a door of its own, permitted as an additional residential unit on the house’s lot. The by-law that governs the lot sets how big and how tall it can be and where it may sit. It is a permanent unit, not the portable kind of garden suite the Planning Act allows under a temporary-use by-law.
Longer than work inside the house, because the zoning check, the design and the permit all come before excavation. A TRCA clearance on a regulated lot, or heritage approval in a district, adds its own step. Construction then runs from the foundation to the service connections and the final inspection, and the quote carries a schedule once the zoning check has shown what fits.
A building permit, always: installing a building counts as construction under Ontario’s Building Code Act, prefab or not. Then whatever the lot adds: TRCA’s permit or clearance in a regulated area, heritage approval in one of Markham’s four districts, a tree permit for a protected tree, a minor variance if the suite misses a zoning rule, and an ESA permit for the wiring.
Anyone. Ontario’s rules let an additional unit be lived in by family or by tenants, related to you or not. With a real estate broker on our team, we can talk through what a suite on your lot might rent for and what it does for the property’s value before you decide to build.
A basement apartment sits inside the house; a garden suite is a separate building in the rear yard. A laneway suite is also detached but fronts a public lane, and some municipalities treat it as a category of its own. Which categories apply to your Markham lot is part of our zoning check.
Often, on a serviced lot with a detached house, semi or rowhouse, where the house holds no more than two units. Some lots fail on rear yard depth, side access or a protected tree. We measure yours against the governing by-law before anything is drawn and tell you the largest suite that fits, or that one does not.
It can be, where your lot’s governing by-law sets a height limit with room for an upper floor. In Markham that by-law is not always 2024-19, so the zoning map is the first thing we check before sketching a second level. Inside a heritage district, a two-storey suite is also drawn to that district’s guidelines and needs heritage approval. Two of the garden suites on our project list, in Toronto and Richmond Hill, are two storeys.
Usually not. It needs water, sanitary and electrical service, but those lines are normally run from the house. Whether the house’s existing service has capacity for a second unit is checked in the design, before the trench route across the yard is fixed.
Only if a public lane runs along it, and only if the by-law that governs your Markham lot has a laneway category. We confirm what applies to your address at the zoning review, before you spend anything on design.
Searched & answered
Short answers to the garden suites questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationAt least 4 m under O. Reg. 299/19, unless the zoning by-law that governs the lot permits less. The rear and side setbacks, and the height that goes with them, come from that Markham by-law.
Usually by branching off the main house’s services rather than new street connections. The line’s path across the yard and the spare capacity of the existing services are both part of the design, and in Markham a trench close to a protected tree needs a tree permit or a route that avoids its roots.
Not as a garden suite. It is permitted as an additional unit in a building ancillary to the house on the same lot, not as a home on a lot of its own. Selling it separately would mean dividing the lot, a planning matter the suite’s permit does not cover, so it is best planned as a rental or family unit.
Most often because water crosses a property line, the ground slopes too gently away from the house, or the swales and elevations do not tie into the survey. Reviewers also return plans that lack erosion control, or an engineer’s stamp where one is required. Fine Engineering designs grading to each municipality’s own criteria and revises the plan to answer the reviewer’s comments.
Within limits the municipality sets. Its lot grading criteria give a minimum slope, so water runs away from the house, and a maximum, beyond which the change in level needs a retaining wall. The figures differ from one municipality to the next, so a plan follows the local criteria rather than a rule of thumb. Fine Engineering sets the slopes and any walls in one design.
The measures that keep soil on a site during construction: silt fence along the boundaries, a mud mat at the driveway, protection over catch basins and cover on stockpiles. Municipalities often make them a condition of a grading or site alteration approval and inspect for them. Fine Engineering puts erosion and sediment control on every grading plan it draws.
Good to know
In Markham a garden suite’s size, setbacks and height are read from the zoning by-law that applies to that particular lot, and Zoning By-law 2024-19 does not govern every one. So the first job is a lookup on the City’s interactive zoning map, then measuring the yard against the by-law it names before any design starts.
Ontario sets a floor under that: on a serviced urban lot, the Planning Act stops zoning from prohibiting one unit in a building behind a detached house, semi or rowhouse, and O. Reg. 299/19 asks for 4 m between it and the house unless the by-law allows less. In the Buttonville, Thornhill, Unionville or Markham Village heritage districts, the suite is also drawn to the district’s guidelines and needs heritage approval.
Markham’s Tree Preservation By-law 2023-164 can move the price. It protects private trees with trunks 20 cm across or wider whatever their health or risk level, and both the suite’s footings and the trench carrying its services back to the house can reach into roots. A protected tree near the work means shifting the suite or the trench away from the root zone, or getting a tree permit before construction starts.
Either route shows up in the price once the layout is fixed around the trees. Beyond that, the suite is priced on its floor area, its storeys and its finishes.
The zoning check and design lead, the permit review follows, and construction with the service hookups comes last. A lot near a valley, stream or wetland has one more gate: inside a TRCA Regulated Area, TRCA’s permit or clearance has to be obtained before the City can legally issue a building permit for the suite, and TRCA’s review can shape where it sits.
Contact us
Free first call: give us the address and we check access, trees and setbacks.
First consultation free(416) 990-9179