Toronto & Peel · About 30 minutes

Toronto building permits: drawings and engineering.

Toronto building permits prepared by one Richmond Hill office whose engineer holds both a P.Eng licence and BCIN qualifications: the permit drawings, the structural, HVAC and grading engineering, the application filed for you, and every examiner comment answered at no extra charge.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Upper floor of a Toronto garden suite at the framing stage, stud walls up and wiring pulled through the joists
Municipality
Toronto, Ontario
Permit office
Toronto Building
Conservation authority
TRCA
From our office
About 30 minutes
Fig. 01 · Upper floor of a Toronto garden suite at the framing stage, stud walls up and wiring pulled through the joistsRichmond Hill, ON

P.Eng · BCIN · Toronto

Permits & Engineering in Toronto: drawn and stamped in-house.

What a service covers, what to send first and who checks it here are on its Toronto page. The same team, with P.Eng and BCIN, does all six.

  • Bright, newly framed room mid-renovation with sawhorses on the floor

    Renovation underway

    Residential Permits: read more

    The sheets the city expects, signed by a qualified designer.

    • Legal basements & second units
    • Additions & garden suites
    • Load-bearing wall removal
    • Deck, porch & pool permits

    City requests

    Handled at no extra charge

  • Open-plan commercial office with a glass-walled meeting room

    Office fit-out

    Commercial Permits: read more

    Occupancy, zoning and exit checks before a use changes.

    • Change of use
    • Zoning & minor variances
    • Business licences
    • Fire & life-safety upgrades

    Reviewed for

    Zoning + Ontario Building Code

  • Roof trusses silhouetted against a dusk sky

    Roof trusses

    Structural Engineering: read more

    Wood, concrete and steel, from a single beam to a full framing set.

    • Wood framing
    • Foundations & slabs
    • Steel beams & connections
    • Inspections & city letters

    Stamped by

    Licensed P.Eng (PEO)

  • Exposed spiral ductwork and track lighting across a white ceiling

    Ductwork & lighting

    Mechanical & Electrical: read more

    HVAC, plumbing, electrical and fire safety drawn as one package.

    • HVAC & load calculations
    • Plumbing & DWV
    • Panels & EV chargers
    • Fire alarm & sprinklers

    Deliverable

    Permit-ready MEP drawings

  • New concrete driveway curving up to a modern house at dusk

    Driveway & grading

    Site Engineering: read more

    Lot plans checked against municipal drainage and tree criteria.

    • Grading & drainage plans
    • Site alteration permits
    • Pool & landscape design
    • Committee of Adjustment

    Deliverable

    Grading & site plans

  • Stone-clad front entrance of a detached house

    Front entrance

    Home Inspection: read more

    Structure, mechanicals and code read by an engineering team.

    • Pre-purchase inspections
    • Pre-renovation reviews
    • Structural assessments
    • Code compliance review

    Inspected by

    Our engineering team

Design · permit · build

Renovations in Toronto: built by the team that engineered them.

The same people draw, permit and build the job, and when a wall opens onto a surprise the engineering is decided on site.

  • Renovated kitchen with walnut cabinetry and a marble waterfall island

    Walnut kitchen

    Interior Renovations: read more

    Walls, floor plans and the systems behind them, reworked.

    • Kitchens & bathrooms
    • Open-concept layouts
    • Load-bearing wall removal
    • Plumbing, HVAC & electrical

    Recent project

    Richmond Hill · 2,700 sq ft

  • Finished basement suite with a kitchenette and a living area by a fireplace

    Basement suite

    Legal Basements: read more

    A second unit designed backwards from what the inspector checks.

    • Separate entrance
    • Fire separation & egress
    • Kitchen & bathroom
    • Inspection scheduling

    Recent project

    Vaughan · 1,100 sq ft

  • Timber-framed backyard suite under construction at golden hour

    Suite framing

    Garden Suites: read more

    A detached backyard suite for relatives or a tenant.

    • Zoning & setback review
    • One- & two-storey suites
    • Structural framing
    • Rental-ready finishes

    Recent project

    Richmond Hill · 1,250 sq ft

  • Wood-framed addition going up against the side of a blue-sided house

    Addition framing

    Home Additions: read more

    Extra rooms or a new duplex unit, with the beams sized before framing starts.

    • Rear & side additions
    • New duplex units
    • Beams & columns
    • Mechanical tie-ins

    Recent project

    London · duplex unit

  • Curved composite deck with cable railings behind a modern house at sunset

    Rear deck

    Decks & Porches: read more

    Decks, porches and canopies, planned around the permit height line.

    • Decks & railings
    • Covered porches
    • Rear canopies
    • Footings & structure

    Recent project

    London · 570 sq ft porch

  • Two-storey house with dark siding and lit windows at dusk

    Finished exterior

    New Custom Homes: read more

    A new house drawn for your lot, then coordinated through the build.

    • Custom floor plans
    • Structural design
    • HVAC & energy calculations
    • Build coordination

    Recent project

    Haldimand County · 1,750 sq ft

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: building in Toronto, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Work that changes the structure, the number of units or the use of a building, plus new buildings, additions and demolition. Taking out a load-bearing wall, adding a basement unit or a garden suite, raising a second storey and building a deck above the City’s height limit all need one. In Toronto a change of use needs a permit even when nothing is built, so turning a house into two units starts at the permit counter. Ontario’s Building Code Act counts a material alteration as construction, which is why interior work is often caught. We go through your project against the City’s list at the first meeting.

  • Most of what you pay us follows from the house and the lot, so we price it after the free first consultation. Shared walls are one Toronto factor: work involving a party wall needs a permit issued for the property next door as well as yours, and our drawings serve both applications. A lot still under a former municipality’s by-law is another, since it is drawn to that by-law’s numbers rather than 569-2013’s. After that the disciplines decide it: architectural alone, or structural, HVAC and grading as well. The City sets and collects its own permit fee, and answering the examiner’s comments costs you nothing extra.

  • The biggest swing in Toronto comes from approvals that have to land before the permit can. A lot inside a TRCA Regulated Area waits for the conservation authority’s permit or clearance. Footings near a protected tree wait for a tree permit. A design that misses the governing zoning by-law waits for a Committee of Adjustment decision. Once those are clear, the review runs on how complete the application is and how many rounds of comments come back. We can’t speed up the City’s side, but we file a complete set and answer comments ourselves, with no outside consultant to chase.

  • The City draws its clearest line at decks: one more than 60 centimetres (24 inches) above the ground needs a permit, and a lower one does not, though it still has to comply with the Zoning By-law, so setbacks and lot coverage apply all the same. For other work, send us a short description and a few photos. We check it against the City’s list and the Building Code and tell you, before you spend anything on drawings, whether a permit is needed at all.

  • They ask different questions. Zoning asks whether this building may stand here at this size and for this use: height, setbacks, lot coverage, measured against By-law 569-2013 or, on some lots, a former municipality’s by-law. The building permit review asks whether it is designed to the Ontario Building Code: structure, fire separations, exits, heating and ventilation. A set can satisfy one and fail the other. We settle zoning first, while the design can still move, and draw the code details after. When zoning can’t be met as drawn, the next stop is the Committee of Adjustment, not the plans examiner.

  • You can. An owner may apply, and Ontario lets a homeowner draw the set for their own project if they have the drafting skills and know the Building Code. Anyone paid to prepare the drawings needs a BCIN, a P.Eng licence or an architect’s licence. Our engineer holds the first two, with BCIN qualifications in Small Buildings, Structural and HVAC, so the architectural, structural and HVAC sheets for a Toronto house come from one desk. If you would rather not deal with the City yourself, we submit the application for you and follow it through to issue.

  • If we filed it, ask us. We follow the application from submission to issue and tell you when the examiner sends comments or the permit is issued. If you filed it yourself and the City has come back with comments you can’t answer, send them to us with the drawings. We read both, tell you what a reply involves, and can take over the revisions, including a structural letter from our engineer where a comment questions a beam or a footing.

  • The permit waits until every comment is answered. We revise the affected sheets, reply to each comment in writing and resubmit, and that round costs you nothing extra. A structural comment goes to the engineer who designed the member in question; a heating or ventilation comment goes to our mechanical designer. Comments can reach back to zoning as well, which is one more reason we confirm before drawing whether the lot answers to 569-2013 or to its former municipality’s by-law.

  • It is where an owner asks for a minor variance: a small exception to the zoning by-law, granted without rezoning the property. Under Ontario’s Planning Act the Committee may approve one only if it considers the variance minor, desirable for the appropriate use of the land, and in keeping with the general intent of both the zoning by-law and the official plan. In Toronto the first step is knowing which by-law the variance is measured from. We prepare the Committee package and the permit drawings from one design, so the hearing and the examiner are looking at the same building.

  • No. Ontario’s Building Code Act says no one may construct or demolish a building until the chief building official has issued a permit, so a teardown, or the back wall an addition replaces, waits for the paperwork. Stripping out interior structure counts too, because the Act treats a material alteration as construction. Demolition permits are on the list of applications we prepare, and we can set one up alongside the permit for whatever replaces the old structure.

Searched & answered

People Also Ask: what Toronto searches before it builds.

Short answers to what homeowners, builders and business owners search most, from deck permits to change of use.

Not covered here? Book a free consultation
  • No. Electrical work runs on its own track in Ontario: almost all of it is permitted and inspected by the Electrical Safety Authority, not the City, whose building permit covers the rest of the job. Fine Engineering draws the electrical design, from the load calculation to the panel schedule and alarm layout, so it matches the building permit set.

  • Yes, for new construction, exterior alterations and additions in a Heritage Conservation District, and the heritage permit sits alongside the building permit rather than replacing it. A change nobody can see from the street or another public place needs no heritage permit, so interior changes and an addition at the back that can’t be seen normally go ahead on the building permit alone.

  • Yes, when the work installs or modifies a heating or plumbing system: Toronto puts both on its list of jobs that need a building permit. A new heating system, or a bathroom moved to another part of the house, therefore goes to the City before work starts. Fine Engineering’s mechanical designer draws the HVAC and plumbing sheets for that application.

  • Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.

  • The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.

  • Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.

About Toronto

When Toronto asks for a building permit

Changing how a building is used needs a building permit in Toronto even when no construction is proposed. The City’s own examples are a single-unit house becoming a multi-unit house and a residential space turning into an office, so a conversion starts with permit drawings for the new use, before any trade is booked.

The permit applications Fine Engineering prepares cover renovation and demolition, load-bearing wall removal, decks, porches, pools and tree removal. At the first meeting we hold your job up against the City’s list and tell you which of those it needs, and whether anything else has to be approved first.

Which Toronto zoning bylaw covers your lot

Toronto has one city-wide zoning by-law, 569-2013, yet some properties are still governed by the by-law of the former municipality they belonged to. A lot under a former by-law is measured against that by-law’s own setback, height and coverage numbers, so we confirm which one applies to the address before a single dimension goes on the site plan.

With that settled, we can say early whether the project fits as you imagine it, needs a minor variance from the Committee of Adjustment, or should be redrawn to fit.

Toronto secondary suite rules and four-unit houses

Because every Residential zone in the city allows a secondary suite, a basement unit in a Toronto house is a building permit file rather than a rezoning, and the effort goes into the Building Code side: exits, fire separation and alarms. Our Toronto pages on basement apartments and garden suites go through those details.

In May 2023 City Council adopted Official Plan and Zoning By-law amendments that permit multiplexes, buildings of up to four units, across the whole city. For a rebuild or an addition, the number of units is now one of the first things to decide. Once a house holds more than one unit, the drawings have to show the separations between them, a way out for each, and how water, drains and power reach every unit.

Toronto tree bylaw: private trees and street trees

Toronto requires a permit for any activity that could injure or remove a private tree 30 cm or more in diameter, measured about 1.4 m above the ground. Harming or removing a City street tree of any size is prohibited without one. That tree permit is its own approval, sought alongside the building permit, and it has to be in hand before construction starts.

The 30 cm line is not the only one. Inside the area covered by the Ravine and Natural Feature Protection By-law (ravines, forests, parks, golf courses and other identified natural features), a tree of any size needs a permit before it is harmed or removed. Garden suites carry a rule of their own: the City says a suite should not result in the removal of a healthy by-law protected tree.

Valley and ravine lots: TRCA before the City

Where a property sits in a TRCA Regulated Area, the Toronto and Region Conservation Authority has to issue its permit or clearance first. Until it does, the City cannot legally issue the building permit. Lots near a valley, a watercourse or a slope are checked against TRCA’s mapping at the start, so the order of approvals is known before money goes into design.

Structural design for flood-plain projects under TRCA is one of the firm’s listed specialties, so the footings and any retaining walls on a regulated lot are designed with that review in view.

Who answers the Toronto examiner

Plans examiners often send comments before a permit is issued. On our files the person who drew the sheet answers it: a structural comment goes to the engineer who sized that member, a heating question to the mechanical designer who did the load calculation. Revised drawings and a written reply go back to the City at no extra charge.

File A-101 on our project list is a 700 sq ft two-storey garden suite in a Toronto backyard, with the zoning review, architectural drawings, structural framing design and permit application all done here. Separately, Toronto client Pia Bourjeily wrote in her Google review that during the City’s permit review Alexander handled all the paperwork for her garden suite.

Contact us

One team. One process. By experts.

Tell us what you’re planning and we’ll map the path from idea to permit to construction.

First consultation free(416) 990-9179