
Your plan, drawn properly
Custom floor plans
We take your brief or sketch, check the layout against zoning and code, and draw it for permit.
- Floor plans & elevations
- Zoning & lot fit
- Sections & details
- 3D views where they help a decision
New Custom Homes · Richmond Hill, York Region
Custom homes in Richmond Hill with one team for every discipline: we turn your sketch into architectural, structural and mechanical drawings, take them through the City's permit and coordinate construction with the licensed builder you hire, with our engineer back on site at every structural stage.

What’s included
Every discipline on a new house is ours from day one, as on no other project. Structural and mechanical drawings never clash, and the build is coordinated by the office that drew them. The Richmond Hill package is sent to the City of Richmond Hill Building Division, and the drawings follow its checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
05 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Every drawing has one office answering for it, in four steps, lot to occupancy permit.
Walking the lot, we look at zoning and at servicing or conservation limits, then draw a first layout from your brief or sketch.
Architecture, structure and mechanical systems are worked out together by one office, which files for permit and answers the city’s comments.
The builder we coordinate does excavation, foundation, framing, envelope, then rough-ins and finishes. The engineer attends each structural stage.
Occupancy permit and final inspections done, the house matches your approved drawings.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179Two prices make it up: ours for the design, engineering and permit, quoted after a free first consultation, and the builder's for construction, priced from the drawings. Both rise with the house's size, finishes and systems, and with what the lot adds: demolishing an existing house, a new foundation, tree work and grading, and on a moraine lot in the north of the city, footings designed for its loose soil.
The lot and the house decide it, and the schedule comes with our quote. Design and approvals come first: the zoning check, any Committee of Adjustment hearing, the site alteration application with its grading plan and, where trees are affected, the arborist's work, then the building permit. Construction follows, from excavation to the final inspections and occupancy.
The house itself needs a building permit, and a rebuild adds a demolition permit for the old one. Alongside them come the site alteration permit with its grading and servicing plan, a tree permit if protected trees are affected, and an electrical permit from the ESA. Any variance or heritage approval the lot needs comes before the building permit.
A licensed builder you hire takes the house from approved drawings to occupancy: excavation, foundation, framing, the envelope, rough-ins and finishes, with the trades managed on site. Our part sits around that work. We design the house, engineer it and take it through the permit, then coordinate the build with that builder, and our engineer comes back to site at each structural stage.
Only if the house you want breaks a zoning rule, a setback or a height for instance, by a small enough margin for the Committee to call it minor. We check the design against the by-law that governs the lot first, and the layout can often be adjusted to fit. If it can't, we prepare the variance drawings and coordinate the application before the permit is filed.
Yes. We file the building permit, prepare the site alteration application with its grading and servicing plan, and deal with every round of examiner comments at no extra charge, right up to issue. Where an arborist's report is needed, we coordinate it with the grading design.
Yes. We add the structural, HVAC and energy design and the grading the permit needs, check the plans against the zoning and the code, and coordinate the build from them. If something in the plans won't work on your lot, we raise it with you and the architect before it goes to the City.
A production builder repeats one plan down a subdivision, so the cost of design, engineering and approvals is shared across many lots. A custom home is designed once, for your lot and brief, and carries those costs alone, plus whatever your layout and structural choices add. What you get back is a plan that fits the lot you own, its grades and its trees.
Usually not. For a house of ordinary size, Ontario accepts drawings from a BCIN-qualified designer, with the structure designed by a P.Eng, and both qualifications sit in our office. A bigger or unusual building can call for an architect, and if yours does, you hear it from us at the first meeting.
Yes, once they are checked against this lot. Plans drawn for another site, or bought as a stock design, often need changes for the zoning here, the lot's grades or its trees. We make those changes with you, then add the structural, mechanical and energy sheets the permit needs.
Searched & answered
Short answers to the new custom homes questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA custom home starts from the lot, with a new foundation, structure and systems, usually after the old house comes down. A full renovation keeps the existing structure and reworks it. The choice often turns on whether the old foundation and frame are worth keeping, which a P.Eng assessment answers.
A buyer doesn't need a lot yet. Fine Engineering's Director, Robert Grin, is also Broker of Record at Fine Homes Real Estate, so the team can check a lot's zoning, servicing and trees before it is bought.
It can. The Gormley Heritage Conservation District has covered the village core since December 13, 2009, every structure inside it is designated, and altering their heritage attributes needs a Heritage Permit. A project on a Gormley lot is checked against the district with the City before design starts.
Usually because the heat reaching the room does not match the heat it loses. A room over a garage, or one with more glass and outside wall, loses heat faster, and a long or undersized duct delivers less air than the room needs. A room-by-room heat-loss calculation and a duct design show where the gap is. Fine Engineering does both for existing houses as well as new ones.
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.
Good to know
A new house needs a lot review, an architectural design, a structure, heating and energy design, a permit and a build. All of the design happens in our office. We walk the lot and read its zoning, develop your sketch into plans and elevations, and size the structure from footings to roof under our P.Eng's stamp, while our mechanical designer handles the HVAC and the energy design the permit needs.
A builder you hire puts up the house. We coordinate construction with that builder, and the engineer whose name is on the drawings returns to site at each structural stage. Before you sign a construction contract, check that whoever builds holds a licence from the Home Construction Regulatory Authority (HCRA), which Ontario requires of every new home builder, and that the home is enrolled with Tarion before work begins.
On an infill lot, where a new house replaces an older one, the job carries steps a vacant lot doesn't: a demolition permit, a decision on whether the old foundation stays, and grading that must tie into the neighbours' levels along each lot line, which can set the new foundation height before any elevation is drawn.
Our P.Eng confirms whether the existing footings and foundation walls can carry the new house; if they can't, a new foundation is designed with it. Ontario notes that new home warranty cover may not extend to a house built on existing footings or foundations, so that question is settled before the design depends on the old foundation.
The Ontario Land Tribunal's partial approval of July 2, 2026 put By-law 93-25 in force across most of the city; Council had passed it on September 24, 2025. If your lot is on excluded land (Schedules A and A1) or a site still under appeal, the earlier zoning by-law decides the envelope instead.
The envelope is the design brief in numbers: setbacks, height, lot coverage and the uses permitted. We confirm which by-law governs the lot from the address and read it before the first layout, so the floor plans start inside the limits instead of being cut back later.
For a new house, the Site Alteration Permit has to be accompanied by a Grading and Servicing Plan, and the City's by-law names two professions that may draw it: Ontario Land Surveyors and Professional Engineers. Ours comes from our P.Eng, who fixes the grades while designing the foundation, so the foundation top, window wells and swales line up on one drawing.
The servicing side of the same plan shows the sewer, water and storm connections for the new house.
Trees come early in the schedule. Where a tree of 15 cm DBH or more will be injured or removed, Richmond Hill wants an Arborist Report and Tree Inventory and Preservation Plan, prepared by a certified arborist, with the Site Alteration Permit application. The grading plan then has to follow the arborist's recommendations, so we bring the arborist in before the grading is designed rather than after.
Roughly the northern third of Richmond Hill lies on the Oak Ridges Moraine, which is loose soil. On a lot there, the footings, the excavation and the drainage are designed from the soil conditions found on site rather than from assumed native ground, which can mean a soil report and can change the foundation the house needs.
Past the ground, the house drives the price: how big it is, how it is finished and which systems go in, plus whatever site work the lot demands. Our design and engineering fees are listed apart from construction.
Contact us
Free first call: bring the lot address and a sketch, and we go through what it needs.
First consultation free(416) 990-9179