Does new HVAC work in a Richmond Hill house need a permit?
Yes, when it is new work rather than a like-for-like swap. Richmond Hill's Building Permit FAQ names fireplace and wood-burning stove installations as permit work, so those are drawn and filed, and a new ducted system or a change to the heating goes through a permit in the same way.
What does a heat loss calculation show on a Richmond Hill permit?
Room by room, the heat the house gives up in winter and takes on in summer. Because the Building Code wants furnaces and heat pumps sized to a calculated load, this is the figure that justifies the equipment named on the permit drawings.
Which plumbing drawings does Richmond Hill ask to see with a permit?
For new or moved plumbing: a water supply layout, the drainage and venting (DWV) piping drawn with isometrics, fixture locations and the hot water sizing. Plumbing is permitted and inspected by the municipal building department, normally under the same application as the renovation or new unit.
How long does a building permit take for a house in Ontario?
Once a complete application is in, Ontario’s Building Code gives the municipality 10 business days to issue a house permit or refuse it with reasons. Larger and more complex buildings get a longer period. The count only starts when nothing is missing, so an absent sheet or an unresolved zoning issue holds it back. Fine Engineering checks zoning and code before anything is submitted.
What makes a building permit application complete?
The application form, the drawings the Building Code calls for, and every other approval the project depends on. Zoning counts as applicable law, so a needed minor variance has to be granted before the permit can be issued, and a lot in a conservation authority’s regulated area may need that authority’s permit first. Fine Engineering assembles the whole package, with the designer’s registration details on the drawings.
Why would a building permit be refused?
Most often because the plans do not show that the work meets the Building Code or applicable law, such as the zoning by-law. A permit is also withheld when the law requires an engineer’s or architect’s design and the drawings lack one, or when the builder of a new home is unlicensed. The refusal must state its reasons, and Fine Engineering revises the set to answer each one.
What should I do if the city issues a stop-work order?
Stop work and start on the drawings. A stop-work order usually means construction began without a permit or departed from the approved plans. Getting out of it takes a permit application that shows what was built and what is proposed, then whatever inspections the city asks for. Fine Engineering prepares those drawings and replies to the city’s letters.
What happens at a building inspection?
A municipal inspector visits at set stages to confirm the work matches the permit drawings and the Building Code, and nothing gets covered up until its stage has passed. Footings and framing are typical stages. The final inspection is the one that lets the permit close. On its own projects, Fine Engineering’s drawings are the set the inspector checks against.
Does a building permit expire?
It can be revoked, which has much the same effect. The Building Code Act lets the chief building official revoke a permit when work has not seriously begun within six months of issue, or has been halted for over a year. A permit whose inspections were never finished stays open on the property. Fine Engineering can draw what an old permit still needs so the city can close it.
Do I need a permit to demolish a house?
Yes. Ontario’s Building Code Act treats demolition like construction: it cannot start until the chief building official has issued a permit. A rebuild therefore usually needs one permit to take the old house down and another for the new one. A protected tree or a conservation authority’s regulated area on the lot can add an approval of its own. Fine Engineering files both applications on rebuilds.
Do I need a plumbing permit to add a bathroom?
Yes. A new bathroom means new drains, vents and water supply, and installing or changing plumbing is building permit work with its own inspections. Replacing a fixture in the same spot usually is not. The drawing shows the drain, waste and vent layout the inspector will check. Plumbing drawings for bathrooms, kitchens and second units are part of Fine Engineering’s mechanical work.