Site Engineering · Aurora, York Region

Grading Plans and Site Engineering in Aurora

Grading plans in Aurora that drain the lot without sending water next door: existing and proposed grades, swales and drainage designed by our P.Eng for additions, new houses, garden suites, pools, driveways and walkouts, with Committee of Adjustment drawings when the zoning needs a variance.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sod
Deliverable
Grading & site plans
Municipality
Aurora, York Region
Permit office
Town of Aurora Building Division
From our office
About 30 minutes
Fig. 01 · Grey brick two-storey house on a graded lot, its new concrete driveway sloping up from the curb through fresh sodRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

A site plan is reviewed by a different department from the building permit, against its own criteria. We design the lot to those criteria first, then take it through the reviewer who applies them. The Aurora package is sent to the Town of Aurora Building Division, and the drawings follow its checklist.

  • Grading plan sheet for a site in Guelph

    Drainage & runoff

    Grading plan

    Lot elevations as they stand and as proposed, swales, the way water drains, runoff calculations and sediment controls, for a building permit, a pool or site alteration.

    • Lot grading & drainage design
    • Runoff analysis & calculations
    • Erosion & sediment control
    • Surface drainage details
  • Lakeside deck and walkout with landscaping

    Backyards

    Pool & landscape design

    Code-compliant design for driveways, porches, pergolas and outdoor living areas, plus pool permits with the grading they need.

    • Pool enclosure permits
    • Backyard & landscape layouts
    • Driveways & hard surfaces
    • Pergolas, porches & lounge areas
  • New concrete driveway curving up to a house at dusk

    Earthworks

    Site alteration permits

    The municipal by-law on site alteration governs cut and fill, excavation, major landscape changes and related accessory structures; we apply for sign-off.

    • Excavation & cut-and-fill plans
    • Major landscape changes
    • Garages & accessory structures
    • Demolition & site removal
  • New custom home on its lot

    Committee of Adjustment

    Zoning plan approval

    Site layouts and development plans checked against the zoning by-law, with the minor variance drawings and the coordination with authorities a project needs when it asks for relief.

    • Site plans & development layouts
    • Zoning review & minor variances
    • Committee of Adjustment packages
    • Coordination with the city and the conservation authority

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Grading planElevations, swales and drainage
  2. Stormwater notesRunoff calculations for the city
  3. Erosion control planFor the construction period
  4. Site alteration permitDrawings and application
  5. Pool permit drawingsEnclosure and grading
  6. Site planSetbacks, coverage, variance sketches
  7. Committee of AdjustmentPackage, coordinated with the city and conservation authority

How it runs

Process: 4 steps from first call to sign-off.

The site is designed to drain, then taken through whichever department reviews it, across four steps from survey to approval.

  1. Survey & site review

    We walk the lot with its topographic survey in hand and note current drainage: swales, downspouts, any catch basins and the neighbours’ grades.

  2. Zoning & by-law check

    We check setbacks, lot coverage, the by-law governing site alteration and hard-surface limits first, so our plan follows the rules it gets reviewed against.

  3. Grading & drainage design

    Proposed elevations, slopes and swales are set so runoff stays on your lot and reaches the street or a storm connection, with calculations where the city asks for them.

  4. Submission & approvals

    We file the grading plan with the building permit or the site alteration application, respond to the reviewer’s comments at no extra charge, and coordinate with the conservation authority where one is involved.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Address and a current topographic survey
  • Your plans: building, paving or regrading
  • Another designer’s pool or architectural drawings
  • Photos of low spots and boundaries
  • City comments or conservation authority letters
  • Catch basins, downspouts, storm connection

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: site engineering in Aurora, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • A municipal panel that rules on minor variances from the zoning by-law. An Aurora project goes before it when it misses a rule in Zoning By-law 6000-17, a setback, height or coverage limit, by a margin small enough to count as minor. Expect drawings, public notice, a hearing and an appeal period; we prepare the drawings and coordinate the file.

  • In Aurora, location can add a step: inside a Wellhead Protection Area mapped on Schedule A.4 of the zoning by-law, a development or new use can need a Risk Management Plan under York Region's rules before it goes ahead. Otherwise the lot's size and slope, how much of it is regraded and whether runoff calculations are asked for move the price. We quote after a free first consultation.

  • It depends on what else has to sign off beside the plan. On a lot under the Natural Hazards overlay, the conservation authority reviews before grades are fixed, and where regrading would harm a regulated tree a separate tree permit is needed. A complete submission with self-contained drainage avoids a second round.

  • Whenever the work changes how the lot drains: a new house or an addition that moves the grades, a walkout, a pool, a garden suite or a regraded yard. On a lot with an added unit the plan also has to keep the unit's access path clear. Whether a separate site alteration permit applies depends on the Town's own rules, and we check that before drawing.

  • Often. Provincial law lets each municipality require a permit for filling, stripping topsoil or changing the grade, so we check what the Town asks for before drawing. A regulated tree near the work adds Aurora's tree permit, and on an overlay lot the conservation authority reviews the regrading as well.

  • A grading plan, drawn with the structure and the permit set, and in Aurora it can have a second job. If the walkout will be the entrance to a basement unit, By-law 6660-24 wants a clear path at least 1.2 m wide from that door to a street, driveway or parking area, so the side-yard grades must carry a walkable route as well as the water. On a steep or eroding slope that LSRCA or TRCA has identified, the Natural Hazards overlay brings the conservation authority's review before the grades are final.

  • Some municipalities require a professional engineer's seal on a grading plan and others also accept a surveyor or another qualified designer. Ours are prepared by a licensed P.Eng, and we confirm what the Town accepts for your lot before starting.

  • Drainage onto a neighbour's lot will send any plan back, and ours are drawn so it doesn't happen. In Aurora a file can also stall on things outside drainage: on a lot with an added unit, a step, window well or retaining wall that cuts into the 1.2 m path from that unit's door; regrading near a regulated tree with no tree permit planned; or an overlay lot drawn before the conservation authority has reviewed it. Any comment that does come back is answered at no extra charge.

  • Check the overlay first. Aurora's Zoning By-law 6000-17 puts a Natural Hazards overlay on Regional Floodplain land and on land the two conservation authorities, LSRCA and TRCA, have flagged for erosion, loose soils or steep slopes, and the overlay takes precedence over the zone. Under it, the conservation authority reviews the work before the grades are fixed, and we confirm the lot's status against the authority's own mapping.

  • When the pool changes the grades or the drainage, yes, and the excavation, the surround and the new hard surface all move water. We draw the pool grading with the pool permit drawings and keep the runoff on your lot. A regulated tree near the dig brings in the tree permit as well.

Searched & answered

People Also Ask: what Aurora searches about site engineering.

Short answers to the site engineering questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • Not on an ordinary house lot. The Town ties its GDS performance form to larger files, a plan of subdivision with 5 or more units or a major site plan application, and a grading plan for one house, an addition or a pool is neither of those.

  • A site plan shows where things sit: buildings, setbacks, lot coverage, driveways and, on a lot with an added unit, the clear access path to each entrance. A grading plan shows the levels and how water drains. Projects that change both get both, prepared together.

  • Where surface water goes and where it leaves the lot. The plan sets the finished grades and swales that carry runoff to an outlet, whether a storm connection, a rear catch basin or the street, and shows the sediment control that keeps soil on site while the ground is open. Where Aurora's Natural Hazards overlay applies, LSRCA or TRCA reviews the same drawing as the Town.

  • Zoning decides what can go on a lot: the use, height, setbacks and coverage, under the municipal zoning by-law. A building permit decides how it is built, under the Ontario Building Code. The permit review checks zoning too, and a design that misses a zoning rule needs a minor variance before the permit can be issued. Fine Engineering reviews both before drawing.

  • Permission from the municipality’s Committee of Adjustment to depart slightly from the zoning by-law, for example a smaller side yard or a little more lot coverage, without rezoning the property. The Committee has to be satisfied that the change is minor and meets the other tests the law sets, and a bigger change needs a rezoning instead. Fine Engineering draws the plans and handles the application.

  • On most serviced urban residential lots in Ontario, yes. Since Bill 23, the Planning Act stops a zoning by-law from prohibiting up to three units there, which can be the house, a basement unit and a unit in a backyard building. Lot size, setbacks and servicing still decide whether both fit, and each unit needs a permit. Fine Engineering designs both units and confirms the zoning allows the pair.

Good to know

Grading plans in Aurora

A grading plan fixes the finished levels around a building: existing grades from the topographic survey, proposed grades, the swales that carry water along the lot and the slope away from the walls. We draw them for additions, new houses, garden suites, pools, driveways and walkouts, and our P.Eng stamps each one in-house.

The first thing a reviewer checks is whether your runoff stays on your own lot until it reaches the street, a rear catch basin or a storm connection. Our layouts start from that, and before drawing we confirm whether the job also needs a separate site alteration permit.

Unit entrances and the 1.2 m path

Aurora's ARU Registration By-law 6660-24 requires every lot with an additional residential unit to keep a clear path of travel at least 1.2 metres wide from each unit's entrance to a public or private street, a driveway or a parking area, and nothing is allowed to encroach on it.

That is a grading question as much as a layout one. Steps, a fence, a window well or a retaining wall along a side yard can narrow the route, so we set the side-yard grades and show the path on the site plan before the basement door or the garden suite position is final.

Tree permits on regraded Aurora lots

Regrading can injure roots as surely as a footing can. Aurora's Private Tree Protection By-law does not stop at the building permit: with that application already in, the owner still needs a separate tree permit when work will injure or take out a regulated tree, and cutting or filling close to one can do that.

We mark the trees near the regraded area from the survey. Then either the tree permit goes into the approvals plan, or the grades are reshaped to leave the roots alone.

Contact us

Survey in. Grades set. Water where it belongs.

Send the survey and your plans and we will say what the city needs, on a free first call.

First consultation free(416) 990-9179