Residential Permits · Aurora, York Region

Permit Drawings in Aurora

Permit drawings in Aurora, measured and stamped in-house for basement units, additions, decks, garden suites and wall removals: we draw the set under our BCIN and P.Eng credentials, file it with the Town and answer its comments at no extra charge.

Building
designs
200+
Years of
practice
10
Trusted
partners
20+
Flat-roofed rear addition clad in white boards, with a four-panel glass slider opening onto a new concrete patio
City requests
Handled at no extra charge
Municipality
Aurora, York Region
Permit office
Town of Aurora Building Division
From our office
About 30 minutes
Fig. 01 · Flat-roofed rear addition clad in white boards, with a four-panel glass slider opening onto a new concrete patioRichmond Hill, ON

What’s included

Scope: what we take on, and what each part includes.

The residential work we see most often falls into four kinds. All four get one package: measured drawings, a review of zoning and code, structural design if the work needs it, and a submission we back until the permit has been issued. The Aurora package is sent to the Town of Aurora Building Division, and the drawings follow its checklist.

  • Open-plan kitchen and dining room after a renovation

    Interior & exterior

    Renovation & demolition permits

    Load-bearing wall removal, a more open floor plan, a new deck, porch or pool, or removal of a tree where by-law protection applies.

    • Load-bearing wall removal
    • Deck, porch & sunroom permits
    • Pool enclosure permits
    • Demolition & tree removal permits
  • Legal basement apartment with a kitchenette

    Rental income

    Legal basements & second units

    A basement unit the city signs off on needs the right ceiling height, fire separation and egress, HVAC for two units and its own entrance to code.

    • Separate entrance design
    • Fire separation & egress
    • Kitchen & bathroom layouts
    • HVAC for two units
  • Two-storey garden suite framed in a Toronto backyard

    New floor area

    Additions, garden suites & custom homes

    Rear and side additions, second storeys, detached garden suites and full custom homes, with the zoning check done before the first line is drawn.

    • Zoning & setback review
    • Rear, side & second-storey additions
    • One- & two-storey garden suites
    • Custom home permit sets
  • Vaulted addition with exposed timber rafters

    Stamped in-house

    Structural design for the permit

    The structural and architectural sheets go in one package, since a P.Eng of our own sizes the framing, posts, beams and footings and stamps them.

    • Wood framing design
    • Steel beam & post sizing
    • Foundation & underpinning
    • Site review letters

The package

When you need it, and what you get.

Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.

You need this when

07 common situations

What you get

07

items in your package, all from one P.Eng and BCIN team.

Drawn & stamped in-house

  1. Existing drawingsThe house measured as it stands
  2. Plans, elevations, sectionsThe proposed design
  3. Site planSetbacks and lot coverage
  4. Structural drawingsP.Eng stamped where required
  5. HVAC, plumbing, electricalWhere the scope needs them
  6. Permit applicationCompleted and submitted to the city
  7. City comments answeredUntil the permit is issued

How it runs

Process: 4 steps from first call to sign-off.

The engineer measuring the house also signs the drawings. One team runs all four steps.

  1. Consultation & site visit

    Tell us what you want as we walk and measure the house. That first consultation costs nothing, and you leave knowing which permits apply.

  2. Zoning & code review

    No drawing starts until we’ve checked the lot for the zoning by-law, as well as the plan for the Ontario Building Code. The city gets nothing to bounce back.

  3. Drawings & engineering

    We draw and cross-check mechanical, architectural and structural sheets in one office, for our BCIN designers and P.Eng to stamp.

  4. Submission & city comments

    We file the application, track it, and answer every examiner comment at no extra charge until the permit is in your hand. If you want us to build it, the same team carries on.

What we need to start

Send what you have. We fill in the rest on the first call.

Book a free call
  • Property address
  • What you want done, in your own words
  • A lot survey, if you have one
  • Any existing drawings or previous permits
  • Photos of the areas involved
  • Any letters or orders from the city

Case files

Our Projects: real permits, real builds, real value added.

Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

Files
08
Municipalities
07

Two-storey garden suite framing under construction in a Toronto backyard
Interior framing

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.

Location
Toronto
Area
700 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Architectural drawings
  • Structural framing design
  • Zoning review
  • Building permit application

New living space on a lot the owners already had.

Start a project like this

Richmond Hill home exterior after a full-home interior renovation
Home exterior

Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.

Location
Richmond Hill
Area
2,700 sq ft
Sector
Residential
Disciplines
Structural · Architectural

Delivered

  • Load-bearing wall removal
  • Beam & column design
  • Permit drawings
  • Renovation coordination

An open layout where the load-bearing walls used to be.

Start a project like this

Finished legal basement apartment kitchen and living area in Vaughan
Basement kitchen

A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.

Location
Vaughan
Area
1,100 sq ft
Sector
Residential
Disciplines
Architectural · Mechanical · Fire safety

Delivered

  • Separate entrance
  • Fire separations
  • HVAC design
  • Full permit package

A legal second unit that brings in rent and adds property value.

Start a project like this

Newly completed custom home exterior in Haldimand County
Finished bungalow

A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.

Location
Haldimand County
Area
1,750 sq ft
Sector
Residential
Disciplines
Architectural · Structural · Mechanical

Delivered

  • Architectural design
  • Structural design
  • Mechanical design
  • Permit drawings

Built to the client’s own plan, with one team answering for every discipline.

Start a project like this

Completed two-storey garden suite with a double garage, Richmond Hill
Suite over garage

A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.

Location
Richmond Hill
Area
1,250 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Layout planning
  • Architectural drawings
  • Structural design
  • Permit application

Rental income and a higher property value.

Start a project like this

Kitchener plaza storefront converted from a dental office to a supermarket
Plaza storefront

A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.

Location
Kitchener
Area
Dental → grocery
Sector
Commercial
Disciplines
Architectural · Plumbing · Fire safety

Delivered

  • Change-of-use permit
  • Interior renovation drawings
  • New plumbing design
  • Upgraded fire separations

A dental office reopened as a supermarket, compliant with the Ontario Fire Code.

Start a project like this

New covered porch addition under construction, London, Ontario
Porch framing

A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.

Location
London
Area
570 sq ft
Sector
Residential
Disciplines
Architectural · Structural

Delivered

  • Addition design
  • Structural drawings
  • Permit application

More usable outdoor space and added home value.

Start a project like this

Grading plan for a driveway extension and site alteration in Guelph
Grading plan

Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.

Location
Guelph
Area
11,700 sq ft
Sector
Site
Disciplines
Site engineering

Delivered

  • Grading plan
  • Drainage design
  • Driveway extension layout
  • Site alteration permit

Drainage handled and the land ready for a new driveway.

Start a project like this

The drawing set

Drawing Samples: sheets from real permit sets.

Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.

Sector
Residential
Discipline
Architectural · Structural
Location
London, ON
Scale
—

Drawing set

Sheets in this set

Sheet title

Existing basement plan

The existing house recorded before any design: beams, joists and bearing walls.

Drawing no.

2 of 5

Client reviews

  • Engineering

    Alexander is everything you could possibly hope for in a professional engineer: exceptionally knowledgeable, meticulous, honest, reliable … If you are looking for an engineer you can trust completely, Alexander is the person you want on your project.

    Karl Sarkadi

  • Legal Basement

    I used them to get a permit from the City of Barrie to legalize my basement apartment … they took care of all the drawings and dealt with the city's requirements so I didn't have to stress about it. … what could've been a huge headache turned out to be smooth and painless.

    Anatoly Dobrovinsky

  • Basement + Entrance

    We had an outstanding experience working with Alexander on the legalization of our basement apartment, including obtaining approvals for a separate entrance. … His expertise in dealing with permits, building code requirements, and municipal approvals gave us complete confidence throughout the project.

    Robert Grin

  • Triplex HVAC Design

    Fine Engineering helped us with the mechanical and HVAC design for our triplex project in Barrie. The design included a boiler system for the 3 units and radiant floor heating … I’m very happy with the final result, it’s a really comfortable system during winter seasons.

    Vanessa L.

  • Duplex Conversion

    They converted my house into a duplex and did the permit drawings for demolishing walls for our open concept in the living room. Alex was nice to explain the zoning bylaws and the construction process during the renovation.

    Cristian Chan

  • New Build Permit

    Alex did an amazing job with our new build permit in Haldimand county. Very fair price, excellent service, will recommend to others

    Aepex Electric

  • Garden Suite

    We hired Fine Engineering & Development to design our garden suite in Toronto … He recommended keeping our garage space and having heat pumps instead of gas furnace to reduce utility bills. During the city permit review, he also handled all the paperwork.

    Pia Bourjeily

  • Ongoing Projects

    Alex and his business has been a very valuable asset to our team and business. He is very resourceful, attentive, has great costumer service and amazing attention to detail.

    Harrisson Cabrera

  • Front Porch Permit

    Reviewed my drawings for a front porch and helped me get the proper documentation the city requested. Everything was done professionally and on time. Great to work with!

    Andre Teixeira

Service area

Where We Work: within 90 minutes of Richmond Hill.

From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.

Our office
Service area
Completed project
Drive time, off-peak

Municipalities we serve

46 across 8 regions

  • York Region

  • Toronto & Peel

    • Toronto (completed project)
    • Mississauga
    • Brampton
    • Caledon
  • Halton

    • Oakville
    • Burlington
    • Milton
    • Halton Hills
  • Durham

    • Pickering
    • Ajax
    • Whitby
    • Oshawa
    • Clarington
    • Uxbridge
    • Scugog
  • Simcoe & Dufferin

    • Barrie (completed project)
    • Innisfil
    • Bradford
    • New Tecumseth
    • Orillia
    • Wasaga Beach
    • Collingwood
    • Orangeville
  • Waterloo, Wellington & Brant

    • Guelph (completed project)
    • Kitchener (completed project)
    • Waterloo
    • Cambridge
    • Brantford
  • Hamilton, Niagara & Haldimand

    • Hamilton
    • Grimsby
    • St. Catharines
    • Niagara Falls
    • Haldimand County (completed project)
  • Kawarthas & Northumberland

    • Peterborough
    • Kawartha Lakes
    • Port Hope
    • Cobourg

Past the 90-minute line

We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.

Permits filed with municipalities including

  • City of Toronto
  • City of Richmond Hill
  • City of Brampton
  • City of London
  • City of Waterloo
  • City of Oshawa

Before you call

FAQ: residential permits in Aurora, answered.

Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.

(416) 990-9179
  • Most structural or added-space work does: an addition, a removed load-bearing wall, a new unit, a deck 2 feet or more up. Some interior work does not. Aurora's list of exempt work takes in a basement finish that alters no structure and adds no bedroom, and notes that some plumbing needs no plumbing permit, so the scope decides whether a set goes to the Town at all.

  • We quote after the free first consultation, once we know which sheets and disciplines the project needs. In Aurora the scope grows on a lot zoned ORM, where an addition or a roofed porch is sized against the zone's caps before it is drawn, and on a heritage property, where the street elevation is drawn for that review too. Existing plans or a recent survey shorten the measuring. The Town's permit fee is separate from our quote.

  • Drawing time follows the number of sheets, and the Town's review starts once the application is complete. On a heritage property, whether it sits in a Heritage Conservation District or is individually designated, the heritage permit must be in place before the building permit is issued, so that step goes at the front of the plan. We do not promise an issue date.

  • Yes, if the house is designated under Part IV or sits in a Heritage Conservation District. Aurora asks for a heritage permit for replacement cladding and for any window or door the street can see, even when the job needs no other approval. The Town reviews those choices against the street elevation, so we draw that elevation as it stands and as proposed, with the new windows, doors or cladding marked on it.

  • Three answers shape an Aurora set before we measure anything: whether the house is designated or inside a Heritage Conservation District, whether the lot sits in one of the zones the by-law marks ORM, and how many units the property already has. We can look up the first two from the address, but the unit count has to come from you. Beyond that, send photos, and a survey or old plans if you have them; the measuring we do ourselves on site.

  • We can, and the first thing we sort out is whether the hold-up is in the drawings or in the rules. An addition drawn past the ORM zone's size caps, a heritage property filed before its heritage permit, or a new unit that would take the lot past three can't be fixed by revising a sheet: the design or the order of approvals has to change. Where better drawings will answer the examiner, we revise or redraw them under our own BCIN and P.Eng credentials and reply in writing.

  • We deal with them at no extra charge. The sheets are revised, a written reply goes back with the resubmission, and anything structural is answered by our P.Eng, who designed it. We stay on the file until the Town issues the permit.

  • It helps, and for some jobs the site plan depends on it. A deck 2 feet or more above grade, an addition or a garden suite is shown against the property lines, and a survey is the reliable way to plot those distances. If you have none, we will tell you once we have seen the lot whether one is needed.

  • Only if the lot has room for it. By-law 6660-24 lets an Aurora parcel hold three units in total, the house among them, so a backyard suite or another unit inside the house already uses part of that allowance. When the count works, the unit is drawn as it stands, with the changes the Building Code calls for, and filed as a permit application. When it doesn't, we say so before you pay for any drawings.

  • That depends on what the architect's sheets already cover. Their floor plans, elevations and sections can go to the Town under the architect's own seal, and we add whatever else the work calls for: structural design sealed by our P.Eng where the frame changes, HVAC sheets where the heating changes, and a site plan checked against the zoning for your lot. The architect's sheets and ours then go in together, filed as one application.

Searched & answered

People Also Ask: what Aurora searches about residential permits.

Short answers to the residential permits questions people search most, and the broader topics they lead to.

Not covered here? Book a free consultation
  • It is a designer the province has registered to prepare permit drawings under the Building Code, one category at a time. An Aurora house application needs one whenever the drawings come from a designer who is not an engineer or an architect.

  • The application form and the drawing set, and sometimes a plumbing permit too. Aurora's Building Division says one may be required alongside a permit for new construction, an addition or an alteration, so we prepare the drawings and the form and file both.

  • A BCIN holder registered in the House or Small Buildings category, a licensed engineer for the engineered parts, or an architect. The province's QuARTS public registry lists each BCIN designer and their categories, so you can check a name before hiring.

  • Often, yes. The opening needs a beam sized for the load above, posts under each end and a path that carries the load down to the foundation. The Building Code’s span tables cover some simple cases, but once the beam falls outside them, a licensed P.Eng has to design and stamp it. Fine Engineering prepares the engineering and the permit drawings together.

  • Not reliably by looking at it. A wall that runs across the floor joists, sits over a beam or another wall below, or stands near the middle of the house is more likely to carry load. Only the framing above and below confirms it, which is why Fine Engineering checks the structure on site before designing any removal.

  • That depends on the span and the load above. Engineered wood handles many household openings and is simpler to install, while steel carries a longer span in a shallower depth, which helps when the owner wants a flush ceiling. Fine Engineering sizes both options and recommends the one that suits the opening, the ceiling and the budget.

Good to know

Permit drawings for an Aurora house

Every Aurora house set begins with what is there now, measured on site. On top of that go the proposed floor plans, elevations and sections, a site plan with setbacks and coverage, structural sheets wherever the frame changes, and HVAC, plumbing or electrical sheets when the scope reaches them. The set is submitted with the application and followed until the permit issues.

Where a lot could hold more than one unit, the set plans for the whole parcel. By-law 6660-24 allows three units at most, the main house included, so a basement unit drawn now and a garden suite planned for later have to fit that count together.

Architectural drawings for Aurora permits

On an existing house lot inside the Oak Ridges Moraine Settlement Area, the zones Aurora's by-law marks ORM, the architectural plans are sized before they are detailed. Minor additions there, open-sided roofed porches included, are capped at 25% of the ground floor area, may not exceed 50 sq. m on the ground floor and must stay outside any hydrologically sensitive feature.

Uncovered decks and patios are allowed on those lots too. Reading the zone first means a rear addition is drawn at a size it can get approved, instead of being cut down after the first round of comments.

What an Aurora deck set shows

A deck is the plainest example of what a set contains. Below 2 feet above finished grade an Aurora deck needs no building permit, though zoning still applies; above that, the Town wants a site plan plotting the deck against the property lines, and construction drawings that show the framing in plan, one elevation and a section through it.

Contact us

Measured. Drawn. Submitted.

Tell us what you’re planning at home and we’ll tell you which permits apply, on a free first call.

First consultation free(416) 990-9179