The way in
Separate entrance
A new exterior door cut into the foundation, with the stairwell, guard and drainage designed so the opening does not weaken the wall.
- Foundation opening design
- Stairwell & drainage
- Guards & lighting
- Frost & waterproofing
Legal Basements · Vaughan, York Region
A legal basement apartment in Vaughan gets its separate entrance, fire separation, escape routes and HVAC designed in our own office, then goes through the permit and is built by the same team that drew it.

What’s included
The inspector checks, one at a time, the code items that make a unit legal. Those items set our design and build, and we book inspections in the city’s preferred order. Vaughan packages are filed with the City of Vaughan Building Standards Department. We draw them to that department’s checklist.
The package
Find your situation below. If it’s there, this is the service, and the card underneath is everything you get from our one office.
06 common situations
07
items in your package, all from one P.Eng and BCIN team.
Drawn & stamped in-house
How it runs
Starting with a bare basement, four steps lead to a closed permit. Inspections are scheduled.
A visit lets us measure the ceiling and look at the entrance options, windows and mechanical room. You hear whether legalization is possible and what it would take.
Our one office draws the separations, layout, HVAC and structural opening, sends them to the municipality and answers city comments at no extra charge.
Entrance and framing, then rough-ins and insulation, then rated assemblies, all inspected.
Kitchen, bathroom, flooring and doors, then the final inspection and the closed permit.
Case files
Open any file for the scope, the disciplines involved, what we delivered and what the owner came away with.

A compact two-storey suite in a Toronto backyard. Architectural and structural drawings, zoning review and a framing package that makes every square foot count.
Delivered
New living space on a lot the owners already had.
Start a project like this
Structural walls came out and rooms were added to open the plan. Beam and column design, permit drawings and renovation coordination through to final inspection.
Delivered
An open layout where the load-bearing walls used to be.
Start a project like this
A code-compliant second unit with its own entrance, fire separations between the units, HVAC design and the full permit package.
Delivered
A legal second unit that brings in rent and adds property value.
Start a project like this
A new build taken from the client’s sketch to occupancy, with the architectural, structural and mechanical design done by one team.
Delivered
Built to the client’s own plan, with one team answering for every discipline.
Start a project like this
A two-storey garden suite laid out to get the most usable space from the footprint, designed and permitted as a rentable unit.
Delivered
Rental income and a higher property value.
Start a project like this
A dental office converted into a supermarket. Interior renovation, a new plumbing system and fire separations upgraded to the Ontario Fire Code.
Delivered
A dental office reopened as a supermarket, compliant with the Ontario Fire Code.
Start a project like this
A custom covered porch that turns the front of the house into usable outdoor space. Addition design and structural drawings for the permit.
Delivered
More usable outdoor space and added home value.
Start a project like this
Site grading to manage drainage and prepare the land for a new driveway, drawn as a grading plan for the site alteration permit.
Delivered
Drainage handled and the land ready for a new driveway.
Start a project like thisPhoto plates
Additions, basements, kitchens, new builds and commercial fit-outs. Drag a row to scrub through it, or open any photo full size.Tap any photo to see it full size.
21 platesResidential, commercial & new build
The drawing set
Framing schedules, wall assemblies, dimensions and a city review stamp, as issued. Client title blocks are trimmed off to protect the people we drew them for.
Drawing set
Sheets in this set
Sheet title
Existing basement plan
The existing house recorded before any design: beams, joists and bearing walls.
Drawing no.
2 of 5
Service area
From the office we cover the whole GTA, north to Barrie and Orillia, east to Peterborough and Cobourg, west to Kitchener and Brantford, and down through Niagara.
46 across 8 regions
York Region
Toronto & Peel
Halton
Durham
Simcoe & Dufferin
Waterloo, Wellington & Brant
Hamilton, Niagara & Haldimand
Kawarthas & Northumberland
Past the 90-minute line
We've also completed projects in London and Strathroy. Farther out than that? Call (416) 990-9179 and ask.
Permits filed with municipalities including
Before you call
Anything we haven’t answered here, we’ll answer on a call. The first consultation is free.
(416) 990-9179We price it after measuring, because the answer sits in the basement. Headroom that already meets the code, an existing door that can serve as the exit, drains low enough for a second kitchen and bathroom, and a panel with room to spare keep it small. Underpinning for headroom, a new walk-up with its own grading permit, or a lot where the three required parking spaces have to be created push it up. The first consultation is free.
A basement unit the City of Vaughan has permitted and inspected, in a house type and on a lot that its secondary suite criteria allow, built to the Ontario Building Code. Once it passes its final inspection it can be rented out. An unpermitted basement apartment, however well finished, isn't legal until it has been through that process.
It depends mostly on what the basement needs. A unit with code ceiling height and a workable exit moves from drawings to permit to construction without extra steps. One that needs underpinning or a new walk-up adds engineering, a grading permit from Development Engineering and more construction, and each of those adds its own time before the unit can pass its final inspection.
A building permit for the unit itself, covering the layout, the fire separation, the exits, the alarms, the plumbing and the HVAC. If the entrance is a new walk-up, Vaughan's Development Engineering also issues a grading permit for it, with a stamped plan once the walk-up passes 40 square metres. We prepare and file both.
Check four things: the house type, frontage of at least nine metres, room for three parking spaces, and a location outside the Woodbridge Special Policy Area and any floodplain. Then the suite has to fit within the floor area limits. Send the address, plus the survey if there is one, and we'll check it before you spend anything on drawings.
The 2024 Building Code sets the minimum ceiling height, the fire separation between the units, interconnected smoke alarms, carbon monoxide alarms where a fuel-burning appliance or furnace is involved, and a safe way out, which is usually the suite's own door. Those apply across Ontario. Vaughan's own suite criteria sit on top of them, and a legal unit has to meet both.
At least 1.95 m under the 2024 Building Code, dropping to 1.85 m where beams and ducts pass. We measure it on the first visit, because ceiling height is the one item that can turn a straightforward conversion into an underpinning job.
Then the usual answer is lowering the floor by underpinning, which our engineer designs and the permit covers. It adds engineering, cost and construction, so we tell you before any drawings whether it's needed and what it would involve, and you decide with that in front of you.
We can. Cutting a door through the foundation wall takes a structural design for the opening and, for a walk-up, a grading permit from Development Engineering. Vaughan's suite rules also keep the suite's door off the wall with the main entrance, so it usually goes at the side or the rear of the house.
It can, depending on the design. The heating for two units has to work with the fire separation between them, and the 2024 Code calls for carbon monoxide alarms in a suite that takes heated air from a fuel-burning forced-air furnace. We design the system for both units and show it on the permit set.
Searched & answered
Short answers to the legal basements questions people search most, and the broader topics they lead to.
Not covered here? Book a free consultationA clear opening of at least 0.38 square metres with no side narrower than 460 mm, opening from inside without tools. The sill can sit no more than 900 mm above the floor, and a window well must leave 1,000 mm clear in front of the window. These Building Code figures apply across Ontario.
Where the house is five or more years old, the Building Code accepts a 30-minute fire separation between units. The floor between them can drop to 15 minutes, provided every unit and shared area has interconnected smoke alarms. Fine Engineering designs the ceiling assembly for the rating and raises sound control at the same stage.
Ontario sets the Building Code standards: ceiling height, fire separation, exits and alarms. Vaughan adds its own suite criteria on house type, frontage, floor area, parking and the entrance wall, and rules out the Woodbridge Special Policy Area and floodplains. A legal unit meets both and has passed its inspections.
It needs a safe way out, which is usually its own exterior door. In a house that has stood for five years or more, the 2024 Building Code’s renovation rules also accept an exit route through the other unit, as long as the suite gets an extra escape window that opens from inside without tools and the smoke alarms are linked. Fine Engineering works out which route suits the layout.
Yes. Once a house has a secondary suite, its smoke alarms must be interconnected, by wire or wirelessly, so one sets off the rest, and shared spaces need them too. A suite with a fuel-burning appliance, or one sharing a wall, floor or ceiling with such an appliance or a garage, also needs carbon monoxide alarms by its bedrooms. Fine Engineering marks every alarm on the permit set.
For many homeowners, yes. A legal second unit can earn rent and add property value, and because it was built under a permit, it avoids the trouble an unpermitted suite causes when the house is sold. The return depends on how much the basement needs, whether that is more headroom, a new exit or fire separation. Fine Engineering prices that work before any drawing starts.
Good to know
A basement apartment is legal once it is permitted and has passed its inspections: zoning that allows a second unit on the lot, and a unit built to the Building Code for headroom, fire separation, a way out and alarms. Single-detached houses are the usual starting point, and they made up 64 per cent of the city's dwellings in the 2021 Census, 64,995 homes by the count of the City's economic development office.
We take the job from the first measurement to the final inspection: the zoning check, the drawings, the separate entrance, the fire separations, HVAC for two dwellings, the permit and the build, with one team answering for every part of it.
The City's secondary suite criteria decide whether a basement can be a legal unit at all. The house must be one of the specific single detached, semi-detached or street townhouse types Vaughan allows, on a lot whose frontage measures at least nine metres. The suite can take up to 45 per cent of the main dwelling's gross floor area and can't be smaller than 35 square metres.
Two more rules shape the site plan. The lot needs three parking spaces, and the suite's entrance can't be on the same wall as the main entrance, so a side or rear door, or a walk-up at the back, is drawn to suit.
The checklist starts inside the basement: ceiling height, the windows, the exit, the separation from the house above and the alarms, then the City's criteria for the lot. For a basement that already holds an unregistered apartment, we measure what is there against that list, and the set shows the unit as built plus the changes it needs. Once it is filed, the City can inspect the unit and approve it.
Whether the unit is new or existing, inspections follow the work at each stage named in the permit, and nothing is closed in until its stage has passed. We book them, and the unit becomes legal at the final inspection.
Location can rule a suite out before anything else is checked. Vaughan doesn't allow secondary suites in the Woodbridge Special Policy Area or within a floodplain, so we confirm the lot sits outside both before we measure the basement or design anything. If the lot falls inside either, no layout will make the suite legal, and you hear that at the start rather than after paying for drawings.
The legal basement apartment on our project list in Vaughan is 1,100 sq ft. The work covered its separate entrance, the fire separations between the two units, the HVAC design and the full permit package, and the result is a legal second unit that brings in rent and adds to the property's value.
A new entrance adds the most paperwork. A walk-up at the side or rear needs a grading permit from Vaughan's Development Engineering on top of the building permit, and a walk-up over 40 square metres needs that grading plan stamped by an engineer or a surveyor. That puts another drawing and another review into the file.
The other cost drivers are physical: underpinning where the ceiling is short, a larger egress window and well, fire-rated assemblies under a finished ceiling, a second kitchen and bathroom tied into the existing drains, and whether the electrical panel has room for another unit.
Contact us
Send us the ceiling height and a few photos and we’ll tell you whether the basement can be made legal, on a free first call.
First consultation free(416) 990-9179